AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 1 of 38  ELOG logo
  ID Datedown Author Subject Text Attachments
  Draft   Tue Jun 17 12:22:50 2025 CB EW JG AG SNRun 94/95/96Background with beam at 150 keV and no
target.

Note energy is 0.15% off vs. beam
  
  754   Tue Jun 17 12:14:30 2025 EW, CB, AGRun 93- Background with beam 150keVRun 93- New run at 150keV, background with
beam

13:15 All checks ok
 Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png 
  753   Tue Jun 17 08:04:09 2025 EW, AG, CBRun 92- Background with beam 90keVRun 92- started at 09:00, background with
beam

Same settings as run 91
 Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png 
  752   Mon Jun 16 22:06:00 2025 CB, AR, EWRUN 90-9123:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45
 14x 
  751   Mon Jun 16 21:58:00 2025 CB ARRuns 84-89Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal,
  
  750   Mon Jun 16 11:12:22 2025 JG, AK, AR, EHrun 8312:15 restarted measurement with target
- Run 83

same settings as for runs 76, 77
 8x 
  749   Mon Jun 16 10:46:11 2025 CB JM JG AKRun82Background without beam while source is
optimised.
  
  748   Mon Jun 16 08:17:41 2025 JGD2 consumptionThe current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar.
  
  747   Sun Jun 15 10:46:35 2025 EW, EM, AR, AB, CB, JG, AKRun 8111:45 New run started - run 81, same settings
as previous runs (75, 76 etc)

ROOT histograms NOT zeroed
 30x 
  746   Sun Jun 15 07:01:37 2025 EW, EMRun 8008:00 New run started - run 80

Run whilst they are optimising
the beam after losing it, everything else
 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png 
  745   Fri Jun 13 19:41:32 2025 JG, SHB, JM, AR, EW, OFRun 77, 78, 79New run started - Run 77 after refilling
LN2 dewar

Same settings as Run 75 & 76
 17x 
  744   Fri Jun 13 16:39:18 2025 JG, SHBRun 76Same settings as run 75.

Detector 4 is biased at 100V and
switched from MEC to LEC.
 7x 
  743   Fri Jun 13 14:45:58 2025 JG, SS, JM, CB, EW, ARRun 75 

90 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt 
  742   Thu Jun 12 15:33:17 2025 CB, JM, EM, JG, TD, AB, CF, ARRun 7416:34

Like Run 73, but particle detector
in YR10 now active, and recorded in MBS.
 27x 
  741   Thu Jun 12 14:22:27 2025 JM, CB, TD, CF, JG, EMRun 7315:00

Cave closed, waiting for beam to
come back.
 Screenshot_from_2025-06-12_15-23-37.pngScreenshot_from_2025-06-12_15-23-51.pngScreenshot_from_2025-06-12_15-29-14.pngScreenshot_from_2025-06-12_15-31-19.png 
  740   Thu Jun 12 14:08:42 2025 JM, CBRun 72 - pulser walkthroughPulser walkthrough conducted while the
cave was open.

Pulser amplitudes 90000, 80000,
 Screenshot_from_2025-06-12_15-33-03.png 
  739   Thu Jun 12 06:20:50 2025 JMRun 68,69 - background07:20

Started a background run while
the cave is open.
 Screenshot_from_2025-06-12_07-01-00.pngScreenshot_from_2025-06-12_07-20-26.png 
  738   Wed Jun 11 10:13:42 2025 EW, CB, PJW, AR, JMRun 67As run 66, optimisation of beam completed

DSSD4 now working and thresholds
to 0x30 (480keV), switched to LEC
 14x 
  737   Wed Jun 11 09:16:55 2025 CBASIC Control Settings11 June 10:18

2025Apr08-13.45.30 settings

DSSD4 not working as of the screenshots
 17x 
  736   Wed Jun 11 08:37:48 2025 CB, PJWRun 6609:38

As Run 65, no changes, CRYRING
operators attempting to improve beam intensity.
 Screenshot_from_2025-06-11_10-21-30.pngScreenshot_from_2025-06-11_10-21-44.png 
ELOG V3.1.4-unknown