  719   Wed Jun 4 10:44:36 2025 EW, CB, JM, OFRun 5011:30

Run 50 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-06-04_12-07-43.pngScreenshot_from_2025-06-04_12-07-19.png 
  718   Wed Jun 4 00:10:39 2025 JMRun 49 - beam only01:10

Gas target turned off via the shutter
valve.
 6x 
  717   Tue Jun 3 14:54:29 2025 PMH, STRun 48Run 48 started. Everything is running again.
We started at 3E13 at/cm2

D+ beam deuterium target. D+ beam
 6x 
  716   Tue Jun 3 11:16:07 2025 EW, EM, JMRun 47, beam only backgroundRun 47 started. Target cooling down after
water cooler failure, beam only background

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-06-03_12-20-25.pngScreenshot_from_2025-06-03_12-19-36.png 
  715   Mon Jun 2 20:03:43 2025 JG, AG, CB, EW, EMRun 45/46, 0.5 MeV/ARun 45 started.

D+ beam deuterium target. D+ beam
energy is 0.5 MeV/u. (beam calc calculation
 13x 
  714   Mon Jun 2 17:48:07 2025 JG, AGRun 44 scraper testsSame settings are Run 43 but with coasting
beam and scrapers set to:  30 / - 30
mm.
 Screenshot_from_2025-06-02_18-51-24.pngScreenshot_from_2025-06-02_19-27-31.png 
  713   Mon Jun 2 17:25:31 2025 JG, AGRun 43 scraper testsSame settings are Run 42 but bunched beam
and scrapers set to:  30 / - 30 mm.

 
  
  712   Mon Jun 2 16:35:35 2025 EW, AGRun 42 and scraper tests17:00

Scraper tests conducted. We tried
moving in the scrapers both at a fixed position
 Screenshot_from_2025-06-02_17-44-07.pngScreenshot_from_2025-06-02_17-44-50.png 
  711   Mon Jun 2 09:30:38 2025 JM, EW, STRun 41Run 41 started.

D+ beam deuterium target. D+ beam
energy is 0.75 MeV/u. (beam calc calculation
 6x 
  710   Sun Jun 1 15:33:50 2025 EW, JM, CBRun 4016:30

Run 40 started.

D+ beam deuterium target. D+ beam
 10x 
  709   Sun Jun 1 07:46:34 2025 JM, EM, CBRun 3908:45

Run 39 started.

D+ beam deuterium target. D+ beam
 7x 
  708   Sat May 31 10:46:42 2025 TDRun 38 - remote monitoring
11.40 DAQ continues
      File G22-205/R38
 21x 
  707   Sat May 31 09:58:21 2025 JMRun 3810:56

Run 38 started.

D+ beam deuterium target. D+ beam
 10x 
  706   Fri May 30 21:49:08 2025 JM, NP, CBRun 3722:49

Run 37 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png 
  705   Fri May 30 20:47:47 2025 JM, CB, NPRun 3621:47

Run 36 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png 
  704   Fri May 30 20:06:48 2025 JM, CB, NPRun3521:00

Run 35 started.

D+ beam deuterium target. D+ beam
 8x 
  703   Fri May 30 07:27:41 2025 CB LB JM NP EMWaiting for deuterium08:27

No run going.

Temperatures OK - attach
 8x 
  702   Thu May 29 18:04:47 2025 LB, CB, PMH, JMRun 32,33,34Oven temperature increased, current up
to 3.5E7 pps.

Found beam-target overlap setting
 7x 
  701   Thu May 29 14:39:52 2025 CB LB PMHRun 3115:40

Waiting for Serge to come in to
change beam energy.
 9x 
  700   Wed May 28 16:40:48 2025 EH, SN, LB, OF, EBM, CBRun 28/29/30 - 1.88 MeV/AWe start a new run with real data taking
condititon: beam is ok, target density is
1e12 cm-2, detectors are moving in-out periodically.
 37x 