AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 11 of 38  ELOG logo
Entry  Mon Jun 17 00:05:13 2024, JM, Run 83 
01:00

Cooler voltage setpoint 247.6 V.

FC20 read value 247.05 V.
Entry  Sun Jun 16 22:49:22 2024, JM, Run 82 
23:38

Cooler voltage setpoint 247.5 V.

FC20 read value 246.95 V.
Entry  Sun Jun 15 10:46:35 2025, EW, EM, AR, AB, CB, JG, AK, Run 81 30x
11:45 New run started - run 81, same settings as previous runs (75, 76 etc)

ROOT histograms NOT zeroed

Beam at 2.5e8, target density at 3e12
Entry  Sun Jun 16 19:01:30 2024, ML, EM, Run 80 
20:00

Ecooler setpoint 246.8

Readout 246.25
Entry  Sun Jun 15 07:01:37 2025, EW, EM, Run 80 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png
08:00 New run started - run 80

Run whilst they are optimising the beam after losing it, everything else same as previous runs

ROOT histograms NOT zeroed
Entry  Thu May 30 08:33:21 2024, CB, PW, YL, Run 8 & 9- detector motion tests 7x
09:34 - Moved to Run 9 in preparation of moving detectors. No target yet. Beam in the ring at 750 keV/A.

Temperatures OK (attach)

System wide checks OK except 16 fails clock and ADC calib
Entry  Sun Jun 16 13:51:11 2024, CB EM ML, Run 79 7x
14:51

Ecooler setpoint 246.9

Readout 246.35
Entry  Sun Jun 16 13:29:05 2024, RSS CB, Run 78 
Target clogged?
Entry  Fri Jun 13 19:41:32 2025, JG, SHB, JM, AR, EW, OF, Run 77, 78, 79 17x
New run started - Run 77 after refilling LN2 dewar

Same settings as Run 75 & 76

The root histos have not been reset, i.e. they show combined statistics of run 75, 76 and 77.
Entry  Sun Jun 16 06:02:31 2024, RSS, Run 77 20x
Run 77 started at 06:48

Cooler voltage setpoint 247.0 V.

 
Entry  Sat Jun 15 21:14:56 2024, JM, JS, LC, Run 76 Screenshot_from_2024-06-15_22-16-53.png
22:15

New run 76 - beam on target with definite target overlap [coasting]

Cooler voltage setpoint 247.1 V.
Entry  Fri Jun 13 16:39:18 2025, JG, SHB, Run 76 7x
Same settings as run 75.

Detector 4 is biased at 100V and switched from MEC to LEC.

The root histos have not been reset, i.e. they show combined statistics of run 75 and 76.
Entry  Sat Jun 15 13:30:18 2024, JM, JS, Run 75 Screenshot_from_2024-06-15_15-53-57.pngScreenshot_from_2024-06-15_15-54-30.pngScreenshot_from_2024-06-15_15-54-55.png
14:30

New run 75 - beam on target with definite target overlap [coasting]

Cooler voltage setpoint 247.2 V.
Entry  Fri Jun 13 14:45:58 2025, JG, SS, JM, CB, EW, AR, Run 75 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt
 

90 keV/u beam on target, Target overlap confirmed with lifetime measurement using bunched beam - @ -12.5mm

We do not expect to see see Rutherford due to energy loss in the dead layer, using other particle detector for normalsiation.
Entry  Sat Jun 15 06:10:21 2024, EM, PMH, Run 74 6x
7:00

Cooler voltage setpoint 247.4 V.

 
Entry  Thu Jun 12 15:33:17 2025, CB, JM, EM, JG, TD, AB, CF, AR, Run 74 27x
16:34

Like Run 73, but particle detector in YR10 now active, and recorded in MBS.

Clear effect of target on beam lifetime. Target off -> nearly no counts.
Entry  Fri Jun 14 22:18:18 2024, RSS, CB, US, Run 73 20x
Beam is back.New run started.

 

Cooler voltage setpoint 247.3 V.
Entry  Thu Jun 12 14:22:27 2025, JM, CB, TD, CF, JG, EM, Run 73 Screenshot_from_2025-06-12_15-23-37.pngScreenshot_from_2025-06-12_15-23-51.pngScreenshot_from_2025-06-12_15-29-14.pngScreenshot_from_2025-06-12_15-31-19.png
15:00

Cave closed, waiting for beam to come back.

Reset all ASIC settings to those in elog 737
Entry  Thu Jun 12 14:08:42 2025, JM, CB, Run 72 - pulser walkthrough Screenshot_from_2025-06-12_15-33-03.png
Pulser walkthrough conducted while the cave was open.

Pulser amplitudes 90000, 80000, 70000, 60000, 50000, 40000, 30000, 20000, 10000

DSSD4 was set to MEC and bias off as the detector had previously tripped.
Entry  Fri Jun 14 14:46:54 2024, LC, JM, CB, TD, US, Run 71 - beam on target  Screenshot_from_2024-06-14_16-35-44.pngScreenshot_from_2024-06-14_16-36-06.pngScreenshot_from_2024-06-14_16-36-28.pngScreenshot_from_2024-06-14_19-49-02.png
15:45

New run 71 - beam on target with definite target overlap [coasting]

Cooler voltage setpoint 247.3 V.
ELOG V3.1.4-unknown