AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 11 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  ID Date Author Subjectdown Text Attachments
  645   Mon Jun 17 00:05:13 2024 JMRun 8301:00

Cooler voltage setpoint 247.6 V.

FC20 read value 247.05 V.
  
  644   Sun Jun 16 22:49:22 2024 JMRun 8223:38

Cooler voltage setpoint 247.5 V.

FC20 read value 246.95 V.
  
  747   Sun Jun 15 10:46:35 2025 EW, EM, AR, AB, CB, JG, AKRun 8111:45 New run started - run 81, same settings
as previous runs (75, 76 etc)

ROOT histograms NOT zeroed
 30x 
  642   Sun Jun 16 19:01:30 2024 ML, EMRun 8020:00

Ecooler setpoint 246.8

Readout 246.25
  
  746   Sun Jun 15 07:01:37 2025 EW, EMRun 8008:00 New run started - run 80

Run whilst they are optimising
the beam after losing it, everything else
 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png 
  562   Thu May 30 08:33:21 2024 CB, PW, YLRun 8 & 9- detector motion tests09:34 - Moved to Run 9 in preparation of
moving detectors. No target yet. Beam in
the ring at 750 keV/A.
 7x 
  641   Sun Jun 16 13:51:11 2024 CB EM MLRun 7914:51

Ecooler setpoint 246.9

Readout 246.35
 7x 
  640   Sun Jun 16 13:29:05 2024 RSS CBRun 78Target clogged?   
  745   Fri Jun 13 19:41:32 2025 JG, SHB, JM, AR, EW, OFRun 77, 78, 79New run started - Run 77 after refilling
LN2 dewar

Same settings as Run 75 & 76
 17x 
  639   Sun Jun 16 06:02:31 2024 RSSRun 77Run 77 started at 06:48

Cooler voltage setpoint 247.0 V.

 
 20x 
  638   Sat Jun 15 21:14:56 2024 JM, JS, LCRun 7622:15

New run 76 - beam on target with
definite target overlap [coasting]
 Screenshot_from_2024-06-15_22-16-53.png 
  744   Fri Jun 13 16:39:18 2025 JG, SHBRun 76Same settings as run 75.

Detector 4 is biased at 100V and
switched from MEC to LEC.
 7x 
  637   Sat Jun 15 13:30:18 2024 JM, JSRun 7514:30

New run 75 - beam on target with
definite target overlap [coasting]
 Screenshot_from_2024-06-15_15-53-57.pngScreenshot_from_2024-06-15_15-54-30.pngScreenshot_from_2024-06-15_15-54-55.png 
  743   Fri Jun 13 14:45:58 2025 JG, SS, JM, CB, EW, ARRun 75 

90 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt 
  636   Sat Jun 15 06:10:21 2024 EM, PMHRun 747:00

Cooler voltage setpoint 247.4 V.

 
 6x 
  742   Thu Jun 12 15:33:17 2025 CB, JM, EM, JG, TD, AB, CF, ARRun 7416:34

Like Run 73, but particle detector
in YR10 now active, and recorded in MBS.
 27x 
  634   Fri Jun 14 22:18:18 2024 RSS, CB, USRun 73Beam is back.New run started.

 

Cooler voltage setpoint 247.3 V.
 20x 
  741   Thu Jun 12 14:22:27 2025 JM, CB, TD, CF, JG, EMRun 7315:00

Cave closed, waiting for beam to
come back.
 Screenshot_from_2025-06-12_15-23-37.pngScreenshot_from_2025-06-12_15-23-51.pngScreenshot_from_2025-06-12_15-29-14.pngScreenshot_from_2025-06-12_15-31-19.png 
  740   Thu Jun 12 14:08:42 2025 JM, CBRun 72 - pulser walkthroughPulser walkthrough conducted while the
cave was open.

Pulser amplitudes 90000, 80000,
 Screenshot_from_2025-06-12_15-33-03.png 
  630   Fri Jun 14 14:46:54 2024 LC, JM, CB, TD, USRun 71 - beam on target 15:45

New run 71 - beam on target with
definite target overlap [coasting]
 Screenshot_from_2024-06-14_16-35-44.pngScreenshot_from_2024-06-14_16-36-06.pngScreenshot_from_2024-06-14_16-36-28.pngScreenshot_from_2024-06-14_19-49-02.png 
ELOG V3.1.4-unknown