  20   Thu Sep 24 10:04:58 2020 JM, TDThursday 24 September
Following overnight pumping by Leybold turbo
pump
 20200924_152852.jpgPhotos.zip 
  183   Tue Feb 1 14:43:20 2022 JM, TDDetector Bias, FEEsDetector is not biasing as it has in previous
tests. Last bias 15/1/22 see previous elogs,
max leakage current ~10 uA at 150V
 22-02-01_15-03-56_aida03pulserADCspectra.png2022-02-01_15-14-07_aida03_pulser_DAQserver.png2022-02-01_15-22-23aida03_waveforms_pulser.png2022-02-01_15-28-45aida03_waveforms_pulser2.png2022-02-01_15-54-57rates_aidaALL.png 
  184   Wed Feb 2 21:53:32 2022 JM, TDDetector BiasFEE mounts for 5,6,7,8 disassembled to
access adaptor boards. No sign of debris
which could cause short on adaptor boards. 
 20220202_110757.jpg20220202_193636.jpg20220202_193651.jpgmotion.png 
  371   Tue Aug 9 16:07:33 2022 JM, TDAnydesk setup command lineTo log into appc218 desktop:
same login and password as to carme@atppc022.gsi.de

To start anydesk
  
  374   Thu Aug 11 09:25:13 2022 JM, TDNoise tests
Moved pneumatic motor in and out several
revolutions
 14x 
  376   Fri Aug 12 15:12:37 2022 JM, TDCARME measurementsmeasurement 1 -string
intermediate (smaller) chamber - 2144
(mm) circumference,  measured half circumference
 9x 
  377   Sat Aug 13 10:23:59 2022 JM, TDNoise tests pt3 and pulser walkWaveforms and discriminator ON. Pulser
re-connected to all fees via daisy chain.
V=100v, I=8.36uA
 15x 
  406   Wed Jun 21 18:47:36 2023 JM, TDClosing CARMEInternal CARME installations complete. 


New strain reliefs (flange
side) installed on each cable harness.
2x
 20230621_104911.jpg20230621_104918.jpg20230621_110010.jpg21-06-23-VI.png 
  407   Thu Jun 22 18:58:02 2023 JM, TDSlide back onto ringThe wire seal has been tightend further
to 160 Nm. Open neg feed-through flange has
also been fully tightend. 
 20230622_112534.jpg20230622_112827.jpg20230622_120307.jpg 
  408   Sat Jun 24 10:38:42 2023 JM, TDSection 9 closed, begin pumping 23/06/23

The CARME chamber and interaction
chamber were connected and section 9 has
 23-06-23-VI.png24-06-23-VI.png 
  409   Sun Jun 25 09:41:06 2023 JM, TDNormal turbo-pump operationAttached are images showing the messages
for normal turbo-pump operation
 6x 
  410   Sun Jun 25 10:08:30 2023 JM, TDPump-down 23/06/23

Pumpdown started with the scroll
pump 17:15 . The turbo-pump was started 17:55.
 Figure_1.png20230625_120640.jpg20230625_120648.jpgpump-down.png 
  411   Sun Jun 25 14:30:06 2023 JM, TDMotors bias testThe motors were moved using the pneumatic
only, in and out for several cycles to gauge
the effect on the vacuum. For the left arm
  
  412   Mon Jun 26 14:49:05 2023 JM, TDCARME vented26/06/23

This morning the pressure was 4e-7
mbar. The bolts on the windows and the large
  
  481   Tue Jan 30 09:14:50 2024 JM, TDTuesday 30 January
09.00 CARME IE514 5.1e-11mbar
 32x 
  483   Wed Jan 31 09:49:38 2024 JM, TDOptimising - Wednesday 31Removed ground from DSSD #1 to the chamber
and set MACBs so that timestamp is from the
NIM WR emulator not the VME VETAR2.
 25x 
  499   Thu Feb 8 14:59:59 2024 JM, TDChange p+n FEE64 settingsASIC settings for the pn FEEs has been reset
to the default aida settings. This was done
to combat the observed dropping of several
  
  686   Wed May 21 14:38:22 2025 JM, TDR4 and R5 - background15:30

Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished
 7x 
  616   Tue Jun 11 08:34:50 2024 JM, RSS, JSRun 61 - beam on targetNew run 61

Right arm at 64.60 mm

Left arm IN at 36.54 mm
 Screenshot_from_2024-06-11_11-47-57.pngScreenshot_from_2024-06-11_11-48-20.pngScreenshot_from_2024-06-11_11-48-32.pngScreenshot_from_2024-06-11_11-48-44.png 
  650   Mon Jun 17 16:26:00 2024 JM, RSS, CBRun 8917:20

(Run 87 Junk and Run 88 does not
exist)
 19x 