699
|
Wed May 28 10:54:14 2025 |
LB | Run 27 | Run 27 running
28/05/2025
(ignore 26 - in-between run) |
    |
579
|
Mon Jun 3 08:43:22 2024 |
SD, SHB | Run 26 | 09:44
Run 26 started - Beam no target
Beam energy is being increased |
8x |
698
|
Tue May 27 22:20:11 2025 |
CB, LB,PW | Run 25 - 1.99/2.02 MeV/A | 23:20
JM thinks we cannot see 7Be locus
on run 24. Possibly the right arm cannot |
27x |
578
|
Sun Jun 2 23:38:17 2024 |
JM, EM | Run 25 | 00:38
Run 25 started - Beam on target
Beam energy = 1.5 MeV. |
32x |
575
|
Sun Jun 2 13:04:41 2024 |
JM, AG, CB, DR | Run 23 - vertical beam position and beam lifetime tests | 14:05
Run 22 stopped. Run 23 started
we will now adjust the vertical beam position |
|
694
|
Tue May 27 05:24:05 2025 |
LB,SN, L. Cs. P. J. W. | Run 22, 23 - 1.95 MeV/A | 27/05/2025 ca. 6:00
We start a new run: beam is ok,
target density ok, detectors are moving in-out |
8x |
574
|
Sun Jun 2 08:47:01 2024 |
CB, AG | Run 22 - longer rung with 20 min storage | 09:47
12 seconds pre acc
200x cycles |
    |
573
|
Sun Jun 2 06:41:00 2024 |
CB, AG | Run 21 - tests | 07:41
Switching to bunched beam to check
D vs H content. |
10x |
692
|
Mon May 26 18:37:17 2025 |
LC, AG, LB, SN | Run 21 | Run 21 running
26/05/2025 19:42 p.m.
We start a new run with real data |
12x |
572
|
Sat Jun 1 21:56:17 2024 |
JM, EM, EM, TY, CB, AG | Run 20 | 22:56
Run 20 started - beam on target
Beam energy is 1.5 MeV. Horizontal |
18x |
554
|
Tue May 28 12:38:31 2024 |
TD, JM, CB | Run 2 - Alpha background run |
13.35 FEE64 temperatures OK - attachment
1
|
    |
569
|
Sat Jun 1 07:16:15 2024 |
CB, AB, EM, JM | Run 19 - beam target overlap | Morning shift
08:16 - as run 18, target off
9:00 Increased storage time to |
19x |
505
|
Sat Feb 10 17:05:13 2024 |
TD | Run 15 - background |
17.55 DAQ continues G22-86/R15_11
alpha background
|
20x |
504
|
Sat Feb 10 10:00:44 2024 |
AR RSS JM CB | Run 13, 14 | System checks: all ok
Attatchment 1: Rates ok
Attatchment 2: Temperatures ok |
23x |
566
|
Fri May 31 19:12:01 2024 |
CB, EM | Run 13 - test with beam | 20:00
The beam is set at the correct
energy, operators cross-checked it again. |
  |
565
|
Fri May 31 06:01:55 2024 |
JM, TY, PW, EM, CB | Run 12 - beam on target | 07:00
Run 12 started. D+ beam is incident
on the target at 1.5 MeV |
12x |
564
|
Thu May 30 13:31:01 2024 |
JM, CB, PW, YL | Run 11 - beam on target overlap | 14:30
Run 11 started. D+ beam in the
ring at 1.5 MeV. |
   |
657
|
Wed Jun 19 12:08:34 2024 |
CB + various | Run 101-105 | Run 101: no target. See ELOG entry by TD.
Run 102: ??
Run 103: ?? |
|
563
|
Thu May 30 09:30:33 2024 |
CB, PW, YL, TD | Run 10 | 10:30
Merger OK, Tape server OK
ADC data item statistics looks |
13x |
384
|
Thu Dec 8 14:41:19 2022 |
PJCS | Results of tests on AIDA PSU in DL T9 | We opened one up and soldered a co-ax cable
to one of the +6v power contacts at the output
of the filter board. |
8x |
|