708
|
Sat May 31 10:46:42 2025 |
TD | Run 38 - remote monitoring |
11.40 DAQ continues
File G22-205/R38
|
21x |
593
|
Thu Jun 6 05:44:45 2024 |
DR YL DB LB CB JM | Run 38 - 15N Tests | 06:45
All system checks OK
Target density 3.4e11 |
8x |
707
|
Sat May 31 09:58:21 2025 |
JM | Run 38 | 10:56
Run 38 started.
D+ beam deuterium target. D+ beam |
10x |
592
|
Wed Jun 5 13:34:02 2024 |
JM | Run 37 - Change in thresholds | 14:20
Target nozzle currently being replaced.
No beam |
|
706
|
Fri May 30 21:49:08 2025 |
JM, NP, CB | Run 37 | 22:49
Run 37 started.
D+ beam deuterium target. D+ beam |
  |
591
|
Wed Jun 5 13:21:45 2024 |
JM, CB | Run 36 - pulser walkthrough | 14:00
Access to the cave as Nikos and
Andreas have begun work on the target. |
   |
705
|
Fri May 30 20:47:47 2025 |
JM, CB, NP | Run 36 | 21:47
Run 36 started.
D+ beam deuterium target. D+ beam |
 |
520
|
Fri Feb 16 22:03:27 2024 |
TD | Run 35 - night shift |
22.51 DAQ continues file G22-86/R35_36
|
49x |
519
|
Fri Feb 16 10:02:41 2024 |
JM, OF, CB, AR, EM | Run 35 - cooled beam on target | 11:01
Run 35 started cooled beam on target
Detectors IN (left arm pot =36.5 |
27x |
521
|
Sat Feb 17 06:19:27 2024 |
JM, CB | Run 35 - contd | 07:10
FEE temperatures OK
System checks OK |
    |
588
|
Tue Jun 4 18:08:04 2024 |
Boudefla Dounia - CB - LB - SD | Run 34 | 19:08
Beam energy = 3 MeV.
Horizontal beam position = 4.0 |
19x |
587
|
Tue Jun 4 15:25:36 2024 |
BD US CB | Run 33 | 16:26
Merger OK, Tape server OK
ADC data item statistics looks |
   |
586
|
Tue Jun 4 14:13:17 2024 |
JM, CB, DB, US | Run 32- beam only background | 15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV. |
|
702
|
Thu May 29 18:04:47 2025 |
LB, CB, PMH, JM | Run 32,33,34 | Oven temperature increased, current up
to 3.5E7 pps.
Found beam-target overlap setting |
7x |
585
|
Tue Jun 4 06:56:02 2024 |
DFF, PC, LB, JM,NP,AB | Run 31 contd | 8:13
Since 6:40 the target density dramatically
dropped to 10^9 since then it has been unstable |
 |
584
|
Tue Jun 4 00:04:39 2024 |
DR, EH | Run 31 | Beam energy = 3 MeV
Horizontal beam position = 4.0
mm, vertical beam position = 0.0 mm. |
|
701
|
Thu May 29 14:39:52 2025 |
CB LB PMH | Run 31 | 15:40
Waiting for Serge to come in to
change beam energy. |
9x |
700
|
Wed May 28 16:40:48 2025 |
EH, SN, LB, OF, EBM, CB | Run 28/29/30 - 1.88 MeV/A | We start a new run with real data taking
condititon: beam is ok, target density is
1e12 cm-2, detectors are moving in-out periodically. |
37x |
513
|
Wed Feb 14 14:59:13 2024 |
JM, CB, NP, ML, AG, AB | Run 27 -Beam on target optimisation | Run 27 Started to check optimsation of
the beam - target overlap.
Beam intensity at injection is |
|
580
|
Mon Jun 3 11:46:07 2024 |
SD, SHB, JM, CN, EM | Run 27 | 12:46 (attachments 1-4)
Run 27 started - Beam no target
Beam energy = 3 MeV |
12x |
|