AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 15 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Text Attachments
  708   Sat May 31 10:46:42 2025 TDRun 38 - remote monitoring
11.40 DAQ continues
      File G22-205/R38
 21x 
  593   Thu Jun 6 05:44:45 2024 DR YL DB LB CB JMRun 38 - 15N Tests06:45

All system checks OK

Target density 3.4e11
 8x 
  707   Sat May 31 09:58:21 2025 JMRun 3810:56

Run 38 started.

D+ beam deuterium target. D+ beam
 10x 
  592   Wed Jun 5 13:34:02 2024 JMRun 37 - Change in thresholds14:20

Target nozzle currently being replaced.
No beam
 Screenshot_from_2024-06-05_14-36-44.png 
  706   Fri May 30 21:49:08 2025 JM, NP, CBRun 3722:49

Run 37 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png 
  591   Wed Jun 5 13:21:45 2024 JM, CBRun 36 - pulser walkthrough14:00

Access to the cave as Nikos and
Andreas have begun work on the target.
 Screenshot_from_2024-06-05_14-20-18.pngScreenshot_from_2024-06-05_14-21-26.pngScreenshot_from_2024-06-05_14-27-43.pngScreenshot_from_2024-06-05_14-25-44.png 
  705   Fri May 30 20:47:47 2025 JM, CB, NPRun 3621:47

Run 36 started.

D+ beam deuterium target. D+ beam
 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png 
  520   Fri Feb 16 22:03:27 2024 TDRun 35 - night shift
22.51 DAQ continues file G22-86/R35_36
 49x 
  519   Fri Feb 16 10:02:41 2024 JM, OF, CB, AR, EMRun 35 - cooled beam on target11:01

Run 35 started cooled beam on target

Detectors IN (left arm pot =36.5
 27x 
  521   Sat Feb 17 06:19:27 2024 JM, CBRun 35 - contd07:10

FEE temperatures OK

System checks OK
 Screenshot_from_2024-02-17_07-20-01.pngScreenshot_from_2024-02-17_07-21-27.pngScreenshot_from_2024-02-17_09-09-35.pngScreenshot_from_2024-02-17_09-13-44.pngScreenshot_from_2024-02-17_09-14-35.png 
  588   Tue Jun 4 18:08:04 2024 Boudefla Dounia - CB - LB - SDRun 3419:08

Beam energy = 3 MeV.

Horizontal beam position = 4.0
 19x 
  587   Tue Jun 4 15:25:36 2024 BD US CBRun 3316:26

Merger OK, Tape server OK

ADC data item statistics looks
 Screenshot_from_2024-06-04_18-33-23.pngScreenshot_from_2024-06-04_18-33-38.pngScreenshot_from_2024-06-04_18-35-26.pngScreenshot_from_2024-06-04_18-36-55.png 
  586   Tue Jun 4 14:13:17 2024 JM, CB, DB, USRun 32- beam only background15:15

Run 32 started - Beam, no target

Beam energy = 3 MeV.
  
  702   Thu May 29 18:04:47 2025 LB, CB, PMH, JMRun 32,33,34Oven temperature increased, current up
to 3.5E7 pps.

Found beam-target overlap setting
 7x 
  585   Tue Jun 4 06:56:02 2024 DFF, PC, LB, JM,NP,ABRun 31 contd8:13

Since 6:40 the target density dramatically
dropped to 10^9 since then it has been unstable
 Screenshot_from_2024-06-04_10-53-58.pngScreenshot_from_2024-06-04_10-58-02.png 
  584   Tue Jun 4 00:04:39 2024 DR, EHRun 31Beam energy = 3 MeV

Horizontal beam position = 4.0
mm, vertical beam position = 0.0 mm.
  
  701   Thu May 29 14:39:52 2025 CB LB PMHRun 3115:40

Waiting for Serge to come in to
change beam energy.
 9x 
  700   Wed May 28 16:40:48 2025 EH, SN, LB, OF, EBM, CBRun 28/29/30 - 1.88 MeV/AWe start a new run with real data taking
condititon: beam is ok, target density is
1e12 cm-2, detectors are moving in-out periodically.
 37x 
  513   Wed Feb 14 14:59:13 2024 JM, CB, NP, ML, AG, ABRun 27 -Beam on target optimisationRun 27 Started to check optimsation of
the beam - target overlap.

Beam intensity at injection is
 Target-overlap-scan-optimized.pdf 
  580   Mon Jun 3 11:46:07 2024 SD, SHB, JM, CN, EMRun 2712:46 (attachments 1-4)

Run 27 started - Beam no target

Beam energy = 3 MeV
 12x 
ELOG V3.1.4-unknown