AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 17 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Text Attachments
  190   Wed Feb 9 08:01:41 2022 OH, CB, G-HCResults from no beam overnight08:52 Overnight the DAQ was left running to
check if there was any individual radioactivity
in the Si.
 220209_0852_leakage.png220209_0900_leakage_shake.png 
  418   Thu Jul 13 08:46:44 2023 TDReplacing wire seal
09.30 CARME chamber status
 20230713_135351.jpg20230713_135416.jpg 
  443   Mon Sep 25 16:33:32 2023 TDRemoved tape from heaters TC
17.33 IE514 pressure 6.4e-11 mbar, ambient
temperature +20.8 deg C
 1000007072.jpg1000007067.jpg1000007070.jpg 
  472   Wed Jan 17 10:31:05 2024 TDRemote control of CAEN N1419ET from nnrpi1
Login to nnrpi1 from carme-gsi using ssh
 Capture.PNG 
  176   Thu Jan 27 14:04:34 2022 OH, JMRemote access to CARME server1. ssh into lxpool network: ssh <user>@lxpool.gsi.de
2. ssh into atppc022.gsi.de: ssh carme@atppc022.gsi.de
(This is an rpi access server. Don't run
  
  266   Thu Feb 24 07:25:53 2022 OH (Remote)Recover of system after crash08:00 Woke up to message from Carlo explaining
the server had crashed.
      Anydesked into the machine.
  
  752   Mon Jun 16 22:06:00 2025 CB, AR, EWRUN 90-9123:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45
 14x 
  34   Tue Nov 24 12:24:01 2020 JMRGA scansRGA laptop passcode: tw%11&STA-
  

RGA scans set up and plotting data
 20201124_124107.jpg 
  625   Thu Jun 13 14:46:17 2024 TDR66 beam overlap test
15.45 Start data file G22-201/R66 
      Beam/target overlap test
  
  687   Thu May 22 06:41:10 2025 JG, TDR6 - R11 scrapers test / pulser walk07.00 

JG found target off (target data stopped
 33x 
  609   Mon Jun 10 05:24:49 2024 TD, RSS, DBR5706:45 New data file G22-201/R57

      Right arm at 64.60 mm
 16x 
  602   Sat Jun 8 14:49:14 2024 TDR51 - contd
15.40 DSSSD bias & leakage current OK - attachments
1-2
 30x 
  537   Tue Feb 20 13:20:44 2024 OF, AG, JG, MLR48 status checkDoing afternoon check. Checked the leakage
currents, all ok. Attachment 1

Temperatures ok, attchment 2
 Screenshot_from_2024-02-20_14-22-05.pngScreenshot_from_2024-02-20_14-22-49.pngScreenshot_from_2024-02-20_14-29-39.pngScreenshot_from_2024-02-20_14-34-55.png 
  686   Wed May 21 14:38:22 2025 JM, TDR4 and R5 - background15:30

Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished
 7x 
  14   Wed Sep 16 17:46:36 2020 JMPumping of ChamberA pump cart and leak cart have been connected
to the chamber via the top turbo at the back
of the chamber. An air line has also been
 Photos.zip 
  421   Tue Jul 18 08:16:28 2023 TDPumping down. Issues found with one detector.09.15 Following overnight pumping of CARME
chamber by Leybold turbo
      Pirani 1.00e-3 mbar IE514 2.83e-7 mbar
  
  410   Sun Jun 25 10:08:30 2023 JM, TDPump-down 23/06/23

Pumpdown started with the scroll
pump 17:15 . The turbo-pump was started 17:55.
 Figure_1.png20230625_120640.jpg20230625_120648.jpgpump-down.png 
  427   Mon Jul 24 10:40:14 2023 RSS, TDPump down continues11.40 Pirani 1.00e-3 mbar IE514 2.23e-08mbar

15.15 7d/24h vacuum plots
 vacplot.pngvacplot24.png 
  414   Wed Jul 5 19:27:13 2023 JMPump down and leak testCARME and the interaction chamber have
been pumping for ~26 hours, P=4.15e-7 mbar,
attached figures show the current pump down
 pumping_1.pngpumping-zoom.pngsignal-2023-07-05-15-13-30-512.jpg 
  196   Tue Feb 15 14:59:37 2022 JM, CB, RJCPulser walkthrough16:00

Check Fee temperatures: all green
(see attachment 1)
 11x 
ELOG V3.1.4-unknown