190
|
Wed Feb 9 08:01:41 2022 |
OH, CB, G-HC | Results from no beam overnight | 08:52 Overnight the DAQ was left running to
check if there was any individual radioactivity
in the Si.
|
 |
418
|
Thu Jul 13 08:46:44 2023 |
TD | Replacing wire seal |
09.30 CARME chamber status
|
 |
443
|
Mon Sep 25 16:33:32 2023 |
TD | Removed tape from heaters TC |
17.33 IE514 pressure 6.4e-11 mbar, ambient
temperature +20.8 deg C
|
  |
472
|
Wed Jan 17 10:31:05 2024 |
TD | Remote control of CAEN N1419ET from nnrpi1 |
Login to nnrpi1 from carme-gsi using ssh
|
|
176
|
Thu Jan 27 14:04:34 2022 |
OH, JM | Remote access to CARME server | 1. ssh into lxpool network: ssh <user>@lxpool.gsi.de
2. ssh into atppc022.gsi.de: ssh carme@atppc022.gsi.de
(This is an rpi access server. Don't run |
|
266
|
Thu Feb 24 07:25:53 2022 |
OH (Remote) | Recover of system after crash | 08:00 Woke up to message from Carlo explaining
the server had crashed.
Anydesked into the machine.
|
|
752
|
Mon Jun 16 22:06:00 2025 |
CB, AR, EW | RUN 90-91 | 23:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45 |
14x |
34
|
Tue Nov 24 12:24:01 2020 |
JM | RGA scans | RGA laptop passcode: tw%11&STA-
RGA scans set up and plotting data |
|
625
|
Thu Jun 13 14:46:17 2024 |
TD | R66 beam overlap test |
15.45 Start data file G22-201/R66
Beam/target overlap test |
|
687
|
Thu May 22 06:41:10 2025 |
JG, TD | R6 - R11 scrapers test / pulser walk | 07.00
JG found target off (target data stopped |
33x |
609
|
Mon Jun 10 05:24:49 2024 |
TD, RSS, DB | R57 | 06:45 New data file G22-201/R57
Right arm at 64.60 mm
|
16x |
602
|
Sat Jun 8 14:49:14 2024 |
TD | R51 - contd |
15.40 DSSSD bias & leakage current OK - attachments
1-2
|
30x |
537
|
Tue Feb 20 13:20:44 2024 |
OF, AG, JG, ML | R48 status check | Doing afternoon check. Checked the leakage
currents, all ok. Attachment 1
Temperatures ok, attchment 2 |
   |
686
|
Wed May 21 14:38:22 2025 |
JM, TD | R4 and R5 - background | 15:30
Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished |
7x |
14
|
Wed Sep 16 17:46:36 2020 |
JM | Pumping of Chamber | A pump cart and leak cart have been connected
to the chamber via the top turbo at the back
of the chamber. An air line has also been |
|
421
|
Tue Jul 18 08:16:28 2023 |
TD | Pumping down. Issues found with one detector. | 09.15 Following overnight pumping of CARME
chamber by Leybold turbo
Pirani 1.00e-3 mbar IE514 2.83e-7 mbar
|
|
410
|
Sun Jun 25 10:08:30 2023 |
JM, TD | Pump-down | 23/06/23
Pumpdown started with the scroll
pump 17:15 . The turbo-pump was started 17:55. |
   |
427
|
Mon Jul 24 10:40:14 2023 |
RSS, TD | Pump down continues | 11.40 Pirani 1.00e-3 mbar IE514 2.23e-08mbar
15.15 7d/24h vacuum plots |
 |
414
|
Wed Jul 5 19:27:13 2023 |
JM | Pump down and leak test | CARME and the interaction chamber have
been pumping for ~26 hours, P=4.15e-7 mbar,
attached figures show the current pump down |
  |
196
|
Tue Feb 15 14:59:37 2022 |
JM, CB, RJC | Pulser walkthrough | 16:00
Check Fee temperatures: all green
(see attachment 1) |
11x |