  CARME, Page 17 of 33  ELOG logo
ID Date Author Subject Text Attachments
  344   Tue Mar 1 08:02:26 2022 SHB, MScheck 

'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
 11x 
  343   Tue Mar 1 06:35:42 2022 SHB, MScheckdetector motors are still out

'Check Clock Status', 'Check
ADC Calibration' : Clock status test
 11x 
  342   Tue Mar 1 06:04:04 2022 SHB, MSpositionsjust FYI: current positions saved in files
are x=1000 and y=-750. this information is
good in case of crash.
  
  341   Tue Mar 1 05:23:02 2022 JM, EMCurrent status 06:20

Servo motors moved to fully out
position as some work on the beam was neccessary.
 2022-03-01_06-42-53-ExRate.png 
  340   Tue Mar 1 04:07:31 2022 JM, EMTemperature cycleHave been unable to achieve decent target
density with temperature cycling so far.
Will attempt to go up to 300 k and back down
  
  339   Tue Mar 1 03:34:28 2022 JM, EMCurrent statusTemperature setpoint = 116 k

Detector IN potentiometer = 34.89
mm
 7x 
  338   Tue Mar 1 03:19:50 2022 JM, EMTemperature Cycle04:20

Did another temperature cycle (118
K -> 125 K -> 95 K -> 116 K) trying
  
  337   Tue Mar 1 02:15:29 2022 JM, EMCurrent status03:15

The nozzle motor control at the
target crashed, but operation has been restored.
 6x 
  336   Mon Feb 28 23:54:02 2022 JM, EMCurrent Status, Temperature cycle00:51

Temperature setpoint = 116 K

Detector position IN potentionmeter
 2022-03-01_00-57-44-Exrate.png2022-03-01_00-58-41-ExTotal.png2022-03-01_00-58-14-EyTotal.png 
  335   Mon Feb 28 22:34:51 2022 JM, EMCurrent status23:35

Temperature setpoint = 116 K

Detector position IN, potentiometer
 2022-02-28_23-40-14-xyTotal.png2022-02-28_23-39-56-Exrate.png2022-02-28_23-39-26-goodEvents.png2022-02-28_23-38-58-correlation8.png2022-02-28_23-38-31-ADCitems.png 
  334   Mon Feb 28 14:47:52 2022 CB, TDMonday 28 February 15:00-23:00
15.51 1.8.W spectra 20ms, 2ms, 200us, 20us
FSR - attachments 1-8
 17x 
  333   Mon Feb 28 14:42:48 2022 CB, TDCryostat set to 115K
Cryostat set to 115K
  
  332   Mon Feb 28 14:38:15 2022 TDNewMerger statistics
Screenshots of all NewMerger statistics
 37x 
  331   Mon Feb 28 13:56:02 2022 JG, CBTemperature cycle to 125K14:45

Rutherford rate was decreased significantly
for longer period.
  
  330   Mon Feb 28 13:16:39 2022 JG, AK, CBCurrent status14:16

beam intensity at injection: 7e7
ions
 8x 
  329   Mon Feb 28 11:57:22 2022 JG, AK, CBCurrent status12:55

beam intensity at injection: 9e7
ions
 8x 
  328   Mon Feb 28 10:55:48 2022 JG, USCurrent status11:55

beam intensity at injection: 8e7
ions
 8x 
  327   Mon Feb 28 09:31:48 2022 JG, AK, CBCurrent status10:35

beam intensity at injection: 1e8
ions
 8x 
  326   Mon Feb 28 08:36:35 2022 JG, AK, CBCurrent status09:35

beam intensity at injection: 8.2e7
ions
 8x 
  325   Mon Feb 28 07:35:51 2022 JGcurrent logger crashedThe current logger did crash in the evening
of 25.02. and stopped logging since then,
it seems.
 Screenshot_from_2022-02-28_08-38-35.png 