Entry  Tue Mar 1 05:23:02 2022, JM, EM, Current status  2022-03-01_06-42-53-ExRate.png
06:20

Servo motors moved to fully out position as some work on the beam was neccessary. Beam injection had dropped from ~9e7 to around 1e7. Potentiometer
reads 19.10 mm.   
Entry  Sun Jun 2 23:38:17 2024, JM, EM, Run 25  32x
00:38

Run 25 started - Beam on target

Beam energy = 1.5 MeV.
Entry  Thu Jun 5 08:50:00 2025, JM, CF, CB, EW, Run 51 - background Screenshot_from_2025-06-05_09-38-05.pngScreenshot_from_2025-06-05_09-46-08.pngScreenshot_from_2025-06-05_09-51-43.png
09:49

DSSD4 has been biased to 100V in steps of 5V from 60V. It was previously stable overnight at 60V - attachment 1

Will keep an eye on it but looks OK at the moment. Current bias and leakage current - attachment 2
Entry  Thu Jun 12 14:22:27 2025, JM, CB, TD, CF, JG, EM, Run 73 Screenshot_from_2025-06-12_15-23-37.pngScreenshot_from_2025-06-12_15-23-51.pngScreenshot_from_2025-06-12_15-29-14.pngScreenshot_from_2025-06-12_15-31-19.png
15:00

Cave closed, waiting for beam to come back.

Reset all ASIC settings to those in elog 737
Entry  Sun Feb 11 13:28:46 2024, JM, CB, TD, Run16 - beam on target 30x
13:37 Run started - no beam in the ring (One of the ring magnets was still on RED when it should have been set to green by HKR)

14:28 Beam ON - still observe beam halo on DSSD0 (Top left)

          YR09 Vertical and horizontal offsets set to -9.0 mm
Entry  Mon Feb 21 17:26:19 2022, JM, CB, SHB, OH (remotely), Beam ON run 53 9x
21/2/22 16:00

Call from main control room, beam is ON, probably has been for several hours judging by rate on xy total plot.

Changes made to online monitoring code by OH, include setting to only 1 DSSD, correct offsets from the pulser walkthrough, offline analysis capabilities
Entry  Thu Feb 17 16:26:27 2022, JM, CB, SD, Gauges OFF, Pulser Movement tests 7x
Edinburgh group ion gauge turned OFF -> decrease in leakage current from 10.05 uA to 6.5 uA

GSI vacuum group ion gauge turned OFF -> decrease in leakage current from 6.5 uA to 3.63 uA

GSI large ion pump turned ON -> no effect on leakage current
Entry  Thu Feb 17 18:19:16 2022, JM, CB, SD, Alpha Background run 46 2022-02-17_22-41-45-leakageCurrent.png2022-02-17_22-51-07-aida1-3*L.png2022-02-17_22-54-06-XYTotal.png2022-02-17_22-56-38-ExHist.png
Both GSI vacuum group and edinburgh ion gauges OFF

Fees power cycled. All system checks OK.

Writing to file, alpha background overnight.
Entry  Tue Feb 15 14:59:37 2022, JM, CB, RJC, Pulser walkthrough 11x
16:00

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 2)
Entry  Thu May 30 13:31:01 2024, JM, CB, PW, YL, Run 11 - beam on target overlap Screenshot_from_2024-05-30_14-33-19.pngScreenshot_from_2024-05-31_02-09-35.pngScreenshot_from_2024-05-31_06-57-12.png20240531_073828.jpg
14:30

Run 11 started. D+ beam in the ring at 1.5 MeV.

No target at the moment. Valves to the interaction chamber will soon be opened.
Entry  Fri Feb 25 15:38:40 2022, JM, CB, PJW, Run 55, 56, 59 root histograms 6x
Run55 - detector out, start 22/2/22 13:20, end 23/2/22 10:49

Run 56 - detector moved in, start 23/2/22 10:4, end 23/2/22 15:46

Run 59 - detector position optimised, detector position in, start 23/2/22 17:57, end 24/2/22 00:04
Entry  Tue Jun 10 22:38:59 2025, JM, CB, PJW, Run 65 7x
23:40

Offline anlaysis shows two clear peaks for DSSD1 and 2 at very low energies close to the threshold. One must be elastics and the other a noise
peak.
Entry  Wed Feb 14 14:59:13 2024, JM, CB, NP, ML, AG, AB, Run 27 -Beam on target optimisation Target-overlap-scan-optimized.pdf
Run 27 Started to check optimsation of the beam - target overlap.

Beam intensity at injection is roughly 1e7 particles

Target density apporx 4.2e11 atoms/cm2 and stable.
Entry  Fri May 30 20:06:48 2025, JM, CB, NP, Run35 8x
21:00

Run 35 started.

D+ beam deuterium target. D+ beam energy is 2 MeV/u. (beam calc calculation is 1.9211 MeV/u -> may be wrong cooler voltage, need to check
Entry  Fri May 30 20:47:47 2025, JM, CB, NP, Run 36 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png
21:47

Run 36 started.

D+ beam deuterium target. D+ beam energy is 2 MeV/u.
Entry  Tue Feb 22 00:32:35 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  2022-02-22_01-38-53-Ex-histogram.png2022-02-22_01-38-17-XYtotal.png
01:30

Beam ON ~6E6 pps

Target ON and open to the ring
Entry  Tue Feb 22 02:02:11 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  10x
03:00

Beam ON ~7E6 pps

Target ON and open to the ring
Entry  Tue Feb 22 03:05:06 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  9x
04:00

Beam ON ~5.5E6 pps, but it fluctates between 2e6 and 6e6 (like a step function) in about each 5-10min

Target ON and open to the ring
Entry  Tue Feb 22 04:09:28 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54 - first event at 10MeV ! 11x
05:00

Beam ON ~2E6 pps, still fluctates between 2e6 and 6e6 (like a step function)

Target ON and open to the ring
Entry  Tue Feb 22 05:12:38 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  11x
06:00

Beam ON ~1.5E6 pps, still fluctates between 1e6 and 6e6 (like a step function)

Target ON and open to the ring