Entry  Mon Mar 10 15:47:27 2025, TD, Analysis data files G22-201 R79_10 & R79_24 R79_10.txtR79_24.txt

Analysis of data files G22-201 R79_10 and R79_24 - attachments 1-2
Entry  Tue Jul 2 17:43:32 2024, TD, Offline analysis G22-201/R89 9x
Offline analysis data file G22-201/R89_0 to R89_13 (c. 6h40m data)

DSSSD#1 & 3 36.54mm -> ~ 2.3-8.6 deg 
Entry  Wed Jun 19 12:11:22 2024, CB, RSS, CARME status 
DSSD off

FEEs off

Motors out, pin inserted, compressed air closed, power removed from motors box.
Entry  Wed Jun 19 12:08:34 2024, CB + various, Run 101-105 
Run 101: no target. See ELOG entry by TD.

Run 102: ??

Run 103: ??
Entry  Wed Jun 19 12:06:50 2024, CB, OF, SS, Run 98/99/100 - higher energy 
10:21 June 17

New energy: 1.125 MeV/u

Target in. Run 98 started.
Entry  Wed Jun 19 12:04:02 2024, CB + OF, SS, Run 96/97 
Run 96 - as run 89, while we wait for beam energy change at higher energies

Run stopped around 08:56 June 17

 
Entry  Wed Jun 19 12:01:29 2024, TD, 23:00-07:00 Wednesday 19 June 23x
23.18 DSSSD bias & leakage current OK - attachment 1
      FEE64 temps OK - attachment 2
      ADC data item stats attachment 3
Entry  Wed Jun 19 12:00:56 2024, CB, Run 93/94/95 - background 6x
04:00 17 June

Moved the detectors back to the usual configuration (as per run 89).

Moved target away - background run.
Entry  Wed Jun 19 11:54:26 2024, CB, Run 91/92 - moving detectors Screenshot_from_2024-06-18_03-07-50.pngScreenshot_from_2024-06-18_03-53-51.pngScreenshot_from_2024-06-18_04-20-15.pngScreenshot_from_2024-06-18_04-20-18.pngScreenshot_from_2024-06-18_04-20-21.png
~ 2:00 17 June

 

Run 91
Entry  Mon Jun 17 23:10:08 2024, CB, Run 90 Screenshot_from_2024-06-18_01-21-47.pngScreenshot_from_2024-06-18_01-21-55.png
00:10

As run 89, detectors moved fully out.

 
Entry  Mon Jun 17 16:26:00 2024, JM, RSS, CB, Run 89 19x
17:20

(Run 87 Junk and Run 88 does not exist)

Beam charge state set to 5+. Energy is ~1.06 MeV/u
Entry  Mon Jun 17 06:26:45 2024, JM, OF, AK, CB, Change to 5+ beam 7x
07:00

We are changing to 5+ beam so that we can access higher energies and possibly observe a higher lying, wider resonance.

Beam energy change to 1.06 MeV/u.
Entry  Mon Jun 17 05:47:35 2024, JM, Run 86 
06:50

No sign of the resonance during night shift. New run started but when operators are avaiable we will likely move to higher energies to try and
observe the (p,a) reaction.
Entry  Mon Jun 17 04:01:16 2024, JM, Run 85 
05:00

Cooler voltage setpoint 247.45 V.

FC20 read value 246.9 V.
Entry  Mon Jun 17 02:05:37 2024, JM, Run 84 
03:00

Cooler voltage setpoint 247.7 V.

FC20 read value 247.15 V.
Entry  Mon Jun 17 00:05:13 2024, JM, Run 83 
01:00

Cooler voltage setpoint 247.6 V.

FC20 read value 247.05 V.
Entry  Sun Jun 16 22:49:22 2024, JM, Run 82 
23:38

Cooler voltage setpoint 247.5 V.

FC20 read value 246.95 V.
Entry  Sun Jun 16 22:40:11 2024, JM, Target overlap test - R81 Beam-overlap-updated2.png
23:10

Beam set to bunched mode to observe beam lifetime. 

Electron cooler voltage setpoint kept at 246.8 V. Note this is 0.5 V lower than the previous test where the setpoint was 247.3 V
Entry  Sun Jun 16 19:01:30 2024, ML, EM, Run 80 
20:00

Ecooler setpoint 246.8

Readout 246.25
Entry  Sun Jun 16 13:51:11 2024, CB EM ML, Run 79 7x
14:51

Ecooler setpoint 246.9

Readout 246.35