561
|
Thu May 30 07:25:53 2024 |
Yuri, Phil, Nikos | Gas target |
The cave is closed and beam is back
The d intensity is about half of the intensity before the break
The gas target is prepared but the valvas cannot be opened. Anton is coming in at around 1 PM to open the gate valves. |
560
|
Thu May 30 06:00:51 2024 |
Yuri Nikos ... | Open the cave |
Nikos needs to enter the cave to work on the target cooling.
|
633
|
Fri Jun 14 19:59:14 2024 |
US, LC, CB | New run with name of 72 is started due to target issue |
21:00
Target is lost. Background run is being collected.
New run 72 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.3 V.
FC20 read value 246.75 V.
Right arm at 64.60 mm
Left arm IN at 36.54 mm18:00
FakeMotion script running
horizontal beam position 1.0 mm (new beam target overlap)
vertical beam position -5mm
Beam intensity 6e+7 particles.
Target density ~3e9 at/cm2
Target temperature is 90 K. Values of E1 is 820 Hz, 2.6A, 4.2e-2 mbar
Aida03 detector T is stable.SCreenshot is attached.
22:27
Cooling fixed. Temps OK. |
Attachment 1: Screenshot_from_2024-06-14_21-08-22.png
|
|
Attachment 2: Screenshot_from_2024-06-14_21-08-22.png
|
|
198
|
Wed Feb 16 08:27:27 2022 |
TP, RSS | Alpha background run40 |
09:15
Check Leakage current: (see attachment 1)
Check NewMerger tab: (see attachment 2)
Check Fee temperatures: all green (see attachment 3)
Check statistics tab: ADC data items (see attachment 4)
ADC coincidence-info #8 (see attachment 5)
Good events (see attachment 7)
Check Spectrum Browser tab: (see attachment 6)
Check the following plots: LowEnergyExTotal (see attachment 8)
LowEnergyEyTotal (see attachment 9)
LowEnergyXYRateDSSD0 (see attachment 10)
LowEnergyXYTotalDSSD0 (see attachment 11)
Check system wide checks tab: all okay.
All is good. |
Attachment 1: leakage-2022-02-16_09-15-33.png
|
|
Attachment 2: merger-tab_2022-02-16_09-14-40.png
|
|
Attachment 3: temperatures-2022-02-16_09-16-35.png
|
|
Attachment 4: stats-adc-items-2022-02-16_09-20-16.png
|
|
Attachment 5: aida-correlation-2022-02-16_09-21-16.png
|
|
Attachment 6: spectrum-browser-2022-02-16_09-22-06.png
|
|
Attachment 7: stats-good-event-2022-02-16_09-18-13.png
|
|
Attachment 8: low-enegry-ex-tot-2022-02-16_09-23-25.png
|
|
Attachment 9: low-energy-ey-tot-2022-02-16_09-23-52.png
|
|
Attachment 10: low-energy-xy-rate-dsssd0-2022-02-16_09-26-43.png
|
|
Attachment 11: low-energy-xy-total-dssd0-2022-02-16_09-25-54.png
|
|
199
|
Wed Feb 16 12:43:05 2022 |
TP, RSS | Alpha background run40 |
13:30
Check Leakage current: (see attachment 1)
Check NewMerger tab: (see attachment 2)
Check Fee temperatures: all green (see attachment 3)
Check statistics tab: ADC data items (see attachment 4)
ADC coincidence-info #8 (see attachment 5)
Good events (see attachment 6)
Check Spectrum Browser tab: (see attachment 7)
Check the following plots: LowEnergyXYRateDSSD0 (see attachment 8)
LowEnergyXYTotalDSSD0 (see attachment 9)
LowEnergyExTotal (see attachment 10)
LowEnergyEyTotal (see attachment 11)
Check system wide checks tab: all okay.
All is good. |
Attachment 1: leakage-2022-02-16_13-35-38.png
|
|
Attachment 2: merger-state-2022-02-16_13-35-16.png
|
|
Attachment 3: temperatures-2022-02-16_13-36-05.png
|
|
Attachment 4: aida-adc-data-2022-02-16_13-38-13.png
|
|
Attachment 5: adc-good-events-2022-02-16_13-37-02.png
|
|
Attachment 6: aida-correlation-2022-02-16_13-37-39.png
|
|
Attachment 7: spectrum-browser-2022-02-16_13-38-56.png
|
|
Attachment 8: lowenergy-xy-rate-dssd0-2022-02-16_13-42-12.png
|
|
Attachment 9: lowenergy-xytotal-dssd0-2022-02-16_13-41-31.png
|
|
Attachment 10: lowenergy-ex-total-dsssd0-2022-02-16_13-39-43.png
|
|
Attachment 11: lowenergy-ey-total-dsssd0-2022-02-16_13-40-12.png
|
|
609
|
Mon Jun 10 05:24:49 2024 |
TD, RSS, DB | R57 |
06:45 New data file G22-201/R57
Right arm at 64.60 mm
Left arm IN at 36.54 mm
horizontal beam position 8.75 mm
vertical beam position -5mm
Changed electron cooler set point to 244.4 V
Read value 243.851 V
Collector current 4.31A
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment 3
per FEE64 Rate spectra - attachment 4
Beam intensity - ~ 5.7E7 pps
Target density - 2.91E11 atoms/cm2
8:35
DSSSD bias & leakage current OK - attachment 5
FEE64 temperatures OK - attachment 6
ADC data item stats - attachment 7
per FEE64 Rate spectra - attachment 8
Beam intensity - ~ 4.8E7 pps
Target density - 2.86E11 atoms/cm2
There is no beam since 8:26 and Gleb is informed. 08:46: Beam is back.
10:49
DSSSD bias & leakage current OK - attachment 9
FEE64 temperatures OK - attachment 10
ADC data item stats - attachment 11
per FEE64 Rate spectra - attachment 12
Beam intensity - ~ 4.0E7 pps
Target density - 3.66E11 atoms/cm2
13:18
DSSSD bias & leakage current OK - attachment 13
FEE64 temperatures OK - attachment 14
ADC data item stats - attachment 15
per FEE64 Rate spectra - attachment 16
Beam intensity - ~ 5.0E7 pps
Target density - 5.67E11 atoms/cm2
|
Attachment 1: Screenshot_from_2024-06-10_06-41-37.png
|
|
Attachment 2: Screenshot_from_2024-06-10_06-42-40.png
|
|
Attachment 3: Screenshot_from_2024-06-10_06-43-15.png
|
|
Attachment 4: Screenshot_from_2024-06-10_06-44-38.png
|
|
Attachment 5: Screenshot_from_2024-06-10_08-34-30.png
|
|
Attachment 6: Screenshot_from_2024-06-10_08-34-59.png
|
|
Attachment 7: Screenshot_from_2024-06-10_08-35-23.png
|
|
Attachment 8: Screenshot_from_2024-06-10_08-35-42.png
|
|
Attachment 9: Screenshot_from_2024-06-10_10-46-13.png
|
|
Attachment 10: Screenshot_from_2024-06-10_10-46-31.png
|
|
Attachment 11: Screenshot_from_2024-06-10_10-46-42.png
|
|
Attachment 12: Screenshot_from_2024-06-10_10-46-52.png
|
|
Attachment 13: Screenshot_from_2024-06-10_13-16-00.png
|
|
Attachment 14: Screenshot_from_2024-06-10_13-16-19.png
|
|
Attachment 15: Screenshot_from_2024-06-10_13-16-31.png
|
|
Attachment 16: Screenshot_from_2024-06-10_13-16-40.png
|
|
38
|
Mon Aug 9 12:36:00 2021 |
TD, RSS, ABD | Monday 9 August |
Attachments 1-5 - CARME shipment in CRYRING hall
XHV chambers nearest to YR09
Will remove top and sides of XHV chamber crate and install 4x SAES D-2000, 1x Leybold Mag Lev 400 turbo and 1x Leybold Ionvac IE514 gauge for basic vacuum test.
Attachments 6-7 - spare wire seals shipped from Edinburgh to GSI
poor packing and/or re-packing has resulted in bending of wire seals
wire seals shipped from STFC DL to GSI appear to be OK - see attachment 1
|
Attachment 1: 20210809_132802.jpg
|
|
Attachment 2: 20210809_132813.jpg
|
|
Attachment 3: 20210809_132903.jpg
|
|
Attachment 4: 20210809_132913.jpg
|
|
Attachment 5: 20210809_133438.jpg
|
|
Attachment 6: 20210809_145826.jpg
|
|
Attachment 7: 20210809_145831.jpg
|
|
399
|
Sat May 13 11:34:25 2023 |
TD, RSS | Saturday 13 May |
12.34 DSSSD#3 bias -149.95V leakage current -6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
CRYRING cave lights ON - leakage current measurements @ 60s intervals
6.763
6.764
6.764
6.765
6.767
6.767
6.767
6.767
6.768
6.769
12.48 CRYRING cave lights OFF
13.03 leakage current -6.771uA - no obvious change due to the CRYRING cave lighting
17.31 DSSSD#3 bias -149.95V leakage current -6.658uA temperature +21.0 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
leakage current measurements @ 60s intervals
6.656
6.655
6.655
6.655
6.654
6.652
6.652
6.651
6.650
6.649
CRYRING cave temperature variations/cycles ~0.1 deg C at +21 deg C ambient temperature can produce leakage current variations ~60nA for a leakage current of ~6.6uA
td@winder:~/f77$ ./jgen
*** Enter reference temperature (K)
294
*** Enter minimum temperature, maximum temperature
*** and temperature increment (K)
290 298 0.1
Temperature (K) Ratio (J(T)/J(294.0))
290.0 0.702
290.1 0.708
290.2 0.714
290.3 0.721
290.4 0.727
290.5 0.734
290.6 0.740
290.7 0.747
290.8 0.754
290.9 0.761
291.0 0.767
291.1 0.774
291.2 0.781
291.3 0.788
291.4 0.795
291.5 0.802
291.6 0.809
291.7 0.817
291.8 0.824
291.9 0.831
292.0 0.839
292.1 0.846
292.2 0.854
292.3 0.861
292.4 0.869
292.5 0.877
292.6 0.884
292.7 0.892
292.8 0.900
292.9 0.908
293.0 0.916
293.1 0.924
293.2 0.932
293.3 0.941
293.4 0.949
293.5 0.957
293.6 0.966
293.7 0.974
293.8 0.983
293.9 0.991
294.0 1.000
294.1 1.009
294.2 1.018
294.3 1.027
294.4 1.036
294.5 1.045
294.6 1.054
294.7 1.063
294.8 1.072
294.9 1.082
295.0 1.091
295.1 1.101
295.2 1.110
295.3 1.120
295.4 1.130
295.5 1.139
295.6 1.149
295.7 1.159
295.8 1.169
295.9 1.179
296.0 1.190
296.1 1.200
296.2 1.210
296.3 1.221
296.4 1.231
296.5 1.242
296.6 1.253
296.7 1.263
296.8 1.274
296.9 1.285
297.0 1.296
297.1 1.308
297.2 1.319
297.3 1.330
297.4 1.342
297.5 1.353
297.6 1.365
297.7 1.376
297.8 1.388
297.9 1.400
STOP *** Program ends |
424
|
Fri Jul 21 08:21:54 2023 |
TD, RSS | Baking tent manual |
09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar
Today - install TCs, connect to Pico controller and test
10.00 Bakeout tent setup guide (draft) - attachment 1
14:30 Tested all TCs and are fine
05.25 Pirani 1.00e-3 mbar IE514 3.71e-8 mbar |
Attachment 1: CARME-baking-guide_(1).pdf
|
|
608
|
Sun Jun 9 22:14:23 2024 |
TD, PM, AG | Run 56 - Data taking |
23:15 New run 56 with
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS working - hopefully
Target 4E11
Injection ca. 4E7
horizontal beam position 8.75 mm
vertical beam position -5mm
Changed electron cooler set point to 244.3 V
Read value 243.757 V
Collector current 4.31A
Rates OK. Temps OK
00.30 DAQ continues file G22-201/R56_9
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment 3
per FEE64 Rate spectra - attachment 4
Merger etc - attachment 5
DSSSD bias & leakage current log, CRYRING hall ambient temperature log - attachments 6-7
01.30 Photographs of current CRYRING controls - attachments 8-14
01.30 DAQ continues file G22-201/R56_14
DSSSD bias & leakage current OK - attachment 15
FEE64 temperatures OK - attachment 16
ADC data item stats - attachment 17
per FEE64 Rate spectra
aida16 asics # 1 & # 2 HEC data - attachment 18
aida16 ASIC load check x2 restores normal operation - attachment 19
target 5e+11 stable, beam 4e+7 stable
02.45 beam off - reported to HKR
DAQ continues file G22-201/R56_16
03.00 beam back
beam 4e+7 stable, target 5e+11 stable
DSSSD bias & leakage current OK - attachment 20
FEE64 temperatures OK - attachment 21
ADC data item stats - attachment 22
per FEE64 Rate spectra - attachment 23
04.20 DAQ continues file G22-201/R56_21
DSSSD bias & leakage current OK - attachment 24
FEE64 temperatures OK - attachment 25
ADC data item stats - attachment 26
per FEE64 Rate spectra - attachments 27
Cycle L DSSSDs per https://elog.ph.ed.ac.uk/CARME/603
06.04 DAQ continues file G22-201/R56_21
DSSSD bias & leakage current OK - attachment 28
FEE64 temperatures OK - attachment 29
ADC data item stats - attachment 30
per FEE64 Rate spectra - attachments 31
beam 4e+7 stable, target 4e+11 stable |
Attachment 1: Screenshot_from_2024-06-10_00-23-24.png
|
|
Attachment 2: Screenshot_from_2024-06-10_00-24-07.png
|
|
Attachment 3: Screenshot_from_2024-06-10_00-24-20.png
|
|
Attachment 4: Screenshot_from_2024-06-10_00-25-10.png
|
|
Attachment 5: Screenshot_from_2024-06-10_00-25-38.png
|
|
Attachment 6: Screenshot_from_2024-06-10_00-42-25.png
|
|
Attachment 7: Capture.PNG
|
|
Attachment 8: 20240610_003428.jpg
|
|
Attachment 9: 20240610_003436.jpg
|
|
Attachment 10: 20240610_003446.jpg
|
|
Attachment 11: 20240610_003458.jpg
|
|
Attachment 12: 20240610_003510.jpg
|
|
Attachment 13: 20240610_003518.jpg
|
|
Attachment 14: 20240610_003529.jpg
|
|
Attachment 15: Screenshot_from_2024-06-10_01-32-42.png
|
|
Attachment 16: Screenshot_from_2024-06-10_01-32-58.png
|
|
Attachment 17: Screenshot_from_2024-06-10_01-33-07.png
|
|
Attachment 18: Screenshot_from_2024-06-10_01-33-35.png
|
|
Attachment 19: Screenshot_from_2024-06-10_01-34-12.png
|
|
Attachment 20: Screenshot_from_2024-06-10_02-55-21.png
|
|
Attachment 21: Screenshot_from_2024-06-10_02-55-58.png
|
|
Attachment 22: Screenshot_from_2024-06-10_02-56-13.png
|
|
Attachment 23: Screenshot_from_2024-06-10_02-56-22.png
|
|
Attachment 24: Screenshot_from_2024-06-10_04-22-41.png
|
|
Attachment 25: Screenshot_from_2024-06-10_04-22-55.png
|
|
Attachment 26: Screenshot_from_2024-06-10_04-23-24.png
|
|
Attachment 27: Screenshot_from_2024-06-10_04-23-31.png
|
|
Attachment 28: Screenshot_from_2024-06-10_06-04-17.png
|
|
Attachment 29: Screenshot_from_2024-06-10_06-04-32.png
|
|
Attachment 30: Screenshot_from_2024-06-10_06-04-44.png
|
|
Attachment 31: Screenshot_from_2024-06-10_06-04-52.png
|
|
172
|
Fri Jan 14 10:00:18 2022 |
TD, OH, JM | Friday 14 January |
11.00 Per https://elog.ph.ed.ac.uk/CARME/170 and https://elog.ph.ed.ac.uk/CARME/171 issues have been identified with the FEE64 carriers and adaptor PCBs
Some additional comments
1) Per https://elog.ph.ed.ac.uk/CARME/170 attachments 6-9 we can see that there are no cable strain reliefs to which we can attach the FEE64 power, RJ45 network and
timestamp HDMI cabling. It would probably be straightforward to design something which could be attached to the FEE64 carrier side panels. For the time being we will use
the copper piping of each FEE64 as the nearest, mechanically stable point to which we secure the cabling.
2) Before the skimming of 1x Delron rail yesterday there was a small amount (<1mm say?) of transverse movement of the FEE64 during insertion into the carrier and it is
not clear why. Small sample of measurements of FEE64 carriers, spacers etc.
Delron adaptor PCB support widths 92.85, 92.87, 92.90
Al DN100CF flange attachment width 92.97, 92.99, 93.01
Al FEE64 carrier spacing rod 93.03, 93.04, 93.03
FEE64 width (w/ 1x c. 2mm skimmed Delron rail) 100.2, 100.2, 100.3 (3 measurements along the length of the 1x FEE64)
FEE64 carrier width 102.8, 103.0 (2 measurements of 1x FEE64 carrier)
probably indicates that the spacing between the FEE64 plates is consistent. There is some variability (~0.1mm) in the Delron adaptor PCB which could affect the relative
position of the ERNI pins and sockets. Is there some variability in the width of the FEE64s (w/ rails)? |
373
|
Wed Aug 10 10:33:03 2022 |
TD, ML, JM, NP | Meeting at YR09 to discuss options for CARME operations to February 2022 |
Initial discussions of proposals to provide open CARME chamber and provide access to near and far detector chambers
We assume that we need to complete all work installing and testing DSSSDs and re-assembling CARME by Feb 2022 in readiness for bakeout.
Proposal #1
Disconnect far detector chamber section from mid-chamber section
Disconnect DN350CF flange from near detector chamber
Crane to support near detector chamber and mid-chamber sections
Remove feet of near detector chamber and mid-chamber sections
Install cradle(s) beneath near detector chamber and mid-chamber sections
Use for fork lift to remove cradle(s) + near detector chamber and mid-chamber sections - ML confirms that an appropriate fork lift is available
Proposal #2 (suggested by ML)
Design and fabricate table plus rails to extend transverse rails of CARME chamber support assembly
The CARME chamber support assembly comprises the 'feet' plus two-stage welded Al frame
Disconnect far detector chamber section from downstream section
Disconnect DN350CF flange from near detector chamber
Slide CARME chamber plus upper stage of Al support frame transversely onto table
Use crane to move CARME chamber to work area
Other discussions
Discussed workarounds to enable install of FEE64s (outside ring, upper feedthrough) which currently conflicts with longitudinal beam of gas jet target support frame.
To Do
Edinburgh
- investigate feasibility of proposal #2
- investigate how much space is required to install FEE64s (outside ring, upper feedthrough)
e.g. by extension of transverse beams of gas jet target support frame, move current assembly outwards from ring c. 20-25cm
GSI
- investigate feasibility of gas jet target support frame changes outlined above e.g. movement of gas/water services, purchase of longer cross beams etc.
Suggest meeting (online) to discuss results of these investigations and continue discussions w/c August 22 |
Attachment 1: 20220810_111638.jpg
|
|
Attachment 2: 20220810_095036.jpg
|
|
Attachment 3: 20220810_095150.jpg
|
|
Attachment 4: 20220810_095159.jpg
|
|
623
|
Thu Jun 13 06:21:53 2024 |
TD, LCS | Run 64 - contd |
07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats OK - attachment 3
per FEE64 Rate spectra - attachment 4
per FEE64 1.8.L spectra - attachments 5-6
per FEE64 1.8.W spectra - 20us FSR - attachments 7-8
Merger, TapeServer etc - attachments 9-10
data file G22-201/R64_11
DSSSD bias & leakage current log - attachment 11
CRYRING hall temperature log - attachment 12
CARME DSSSD position controller - attachment 13
07.57 all histograms zero'd
07.58 E1 pump 794Hz, 2.8A, 2.6e-1 mbar, 3.1e+11/cm2
08.55 E1 pump 785Hz, 2.8A, 2.74e-1 mbar, 4.8e+11/cm2. Therefore, the temperature is changed from 38.8 K to 38.4 K. Values of E1 is changed to E1 pump 782Hz, 2.7A, 2.95e-1 mbar, 6e+11/cm2
09.15 The temperature is further changed from 38.4 K to 38.0 K.
09.25 Values of E1 is changed to E1 pump 780 Hz, 2.79 A, 3.0 e-1 mbar, 5.87 e+11/cm2
09.35 Values of E1 is changed to E1 pump 779 Hz, 2.79 A, 3.1 e-1 mbar, 2.07 e+11/cm2
09.45 Values of E1 is changed to E1 pump 778 Hz, 2.75 A, 3.0 e-1 mbar, 4.6 e+11/cm2
10.00 Values of E1 is changed to E1 pump 776 Hz, 2.78 A, 3.05 e-1 mbar, 5 e+11/cm2
Intervention by Uli. Reduced H2 regulator to c. 12 bar. Briefly opened exhaust to hasten recovery.
10.13 E1 820Hz 2.3A 7.7e-2mbar c. 2e+11/cm2
10.34 E1 820Hz 2.1A 6.2e-2mbar c. 1.2e+11/cm2 38K
Beam c. 4e+7. Cooler set 247.3V, read 246.751V. |
Attachment 1: Screenshot_from_2024-06-13_07-24-49.png
|
|
Attachment 2: Screenshot_from_2024-06-13_07-28-56.png
|
|
Attachment 3: Screenshot_from_2024-06-13_07-30-34.png
|
|
Attachment 4: Screenshot_from_2024-06-13_07-36-35.png
|
|
Attachment 5: Screenshot_from_2024-06-13_07-40-06.png
|
|
Attachment 6: Screenshot_from_2024-06-13_07-41-10.png
|
|
Attachment 7: Screenshot_from_2024-06-13_07-42-32.png
|
|
Attachment 8: Screenshot_from_2024-06-13_07-43-30.png
|
|
Attachment 9: Screenshot_from_2024-06-13_08-10-26.png
|
|
Attachment 10: Screenshot_from_2024-06-13_08-10-33.png
|
|
Attachment 11: Screenshot_from_2024-06-13_08-10-43.png
|
|
Attachment 12: Capture.PNG
|
|
Attachment 13: Screenshot_from_2024-06-13_08-16-07.png
|
|
624
|
Thu Jun 13 09:48:25 2024 |
TD, LCS | Run 65 - beam on target |
10:47
The energy is changed to 247.4 V.
Read back value is 246.849 V.
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS working - hopefully
horizontal beam position 8.75 mm
vertical beam position -5mm
Beam intensity 3.0e+7 particles.
e-cooler export controls before/after energy change - attachments 1 & 2
New run is R65. Target temperature is 37.6 K.
Values of E1 is 820 Hz, 2.12A, 6.01e-2 mbar, 2.8e+11/cm2
12:34
Systen checks all OK
Target density stable at ~1.5e11 at/cm2
E1 = 6e-2 mbar, turbo is fine
13,38 CB reboots RHS CRYRING control computer (atppc017) - appears to be a now unavoidable system update/reboot
13.39 DSSSD bias & leakage current OK - attachment 3
FEE64 temps OK - attachment 4
ADC data item stats OK - attachment 5
per FEE64 Rate spectra - attachment 6
Merger, TapeServer etc - attachments 7-8
data file R65_11
DSSSD bias & leakge current log - attachment 12
CARME DSSSD motion control - attachment 13
13.42 E1 turbo 820Hz 2.2A 5.2e-2mbar
Target 3.45e+11/cm2 T1 36.6K
Beam c. 3e+7
15:20
Stats OK. Temps OK.
Merger OK. Write to disk OK.
|
Attachment 1: 20240613_104403.jpg
|
|
Attachment 2: 20240613_104840.jpg
|
|
Attachment 3: Screenshot_from_2024-06-13_13-39-26.png
|
|
Attachment 4: Screenshot_from_2024-06-13_13-39-40.png
|
|
Attachment 5: Screenshot_from_2024-06-13_13-40-09.png
|
|
Attachment 6: Screenshot_from_2024-06-13_13-40-32.png
|
|
Attachment 7: Screenshot_from_2024-06-13_13-40-52.png
|
|
Attachment 8: Screenshot_from_2024-06-13_13-41-02.png
|
|
Attachment 9: Screenshot_from_2024-06-13_13-41-16.png
|
|
Attachment 10: Screenshot_from_2024-06-13_13-41-23.png
|
|
Attachment 11: Screenshot_from_2024-06-13_15-12-19.png
|
|
Attachment 12: Screenshot_from_2024-06-13_15-13-16.png
|
|
Attachment 13: Screenshot_from_2024-06-13_15-20-28.png
|
|
Attachment 14: Screenshot_from_2024-06-13_15-20-31.png
|
|
168
|
Tue Jan 11 12:45:15 2022 |
TD, JM, OH | Coolant manifold installation + detector pin tests |
2x cooling water manifolds with 2x 8 ports have been installed - see attachments 1 & 2
'drain' ports at top of manifold to permit release of trapped air volumes. Local technicians will install a standard blank in one manifold and a small nipple valve on the
other so that we can bleed air in a controlled way.
#Multimeter detector pin tests.
Pins on feedthrough flanges investigated using multimeter for the top and bottom detector due to no response from bottom detector when bias was applied. Bias pins on
correct D connectors are number 78.
#Top detector
>Observe -18.5 kohm; between nn bias pin and pn bias pin (multimeter 200kohm setting)
>observe open line between nn bias pin and pins 'near' pn bias pin (multimeter 200kohm setting)
>Between random pins on same D connector (nn bias pin connector) ~0.02Mohm (multimeter 2Mohm setting)
>Between random pins and unconnected on same D connector (nn bias pin connector) - open line (multimeter 2Mohm setting)
>Between random pins and bias pin on same D connector (nn bias pin connector) ~0.01-0.02 Mohm (multimeter 2Mohm setting)
>Between nn bias pin and random pin on another D connector ~-0.4Mohm (multimeter 2Mohm setting)
#Bottom detector
>Observe open line between nn bias pin and pn bias pin (multimeter 200kohm+2Mohm; setting)
>Observe open line between nn bias pin and pins 'near' bias bias pin (multimeter 200kohm+2Mohm; setting)
>Between random pins on same D connector (nn bias pin connector) ~0.02Mohm (multimeter 2Mohm setting)
>Between random pins and unconnected on same D connector (nn bias pin connector) - open line (multimeter 2Mohm setting)
>Between random pins and bias pin on same D connector (nn bias pin connector) ~0.01-0.02 Mohm (multimeter 2Mohm setting)
>Between random pins on same D connector (pn bias pin connector) ~0.02Mohm (multimeter 2Mohm setting)
>Between random pins and unconnected on same D connector (pn bias pin connector) - open line (multimeter 2Mohm setting)
>Between random pins and bias pin on same D connector (pn bias pin connector) ~open line (multimeter 2Mohm setting)
>Between nn bias pin and random pin on another D connector ~-0.4Mohm (multimeter 2Mohm setting)
We see a similar response for both detectors except that the pn bias pin gives no response.
We have looked to find the bias pin on nearby pins to pin 78 and on the other side of the D connector (in case of cabling error-mirror or swapped cables) but cannot find.
4 FEE holders constructed and ready to install |
Attachment 1: 20220111_113628.jpg
|
|
Attachment 2: 20220111_113613.jpg
|
|
Attachment 3: 20220111_111428.jpg
|
|
508
|
Mon Feb 12 01:40:48 2024 |
TD, JM, CB, AR, RSS | Run17 - Run20 |
02.35 DAQ continues file G22-88/R17_30
02.38 Check ASIC load
aida01 asics # 1 and #4 & aida12 asic #2 HEC events removed
09.05 DAQ continues file G22-88/R17_53
DSSSD bias & leakage current OK - attachments 10-11
FEE64 temperatures OK - attachment 12
ADC data item stats OK - attachment 13
hot channels aida01 ( 67k ) and aida15 ( 7k )
WR timestamps OK - attachment 14
per FEE64 Rate and Stat spectra - attachments 15-16
Merger, Merger stats and TapeServer - attachments 17-19
09.19 New run G22-88/R18
all histograms & stats zero'd
CB starting up 4He target preparatory to returning 16O2+ beam to CRYRING
L & R arms all out
09.26 4He target c. 2e11c.2
16O2+ beam c. 3e5/s
09.58 4He target c. 3e11/cm2
16O2+ beam c. 5e5/s at start of cycle
See attachments 20-22
10.40 New run G22-88/R19
all histograms & stats zero'd
CB will attempt to steer the beam
all steering options set to 0mm except YR09 target offset (vertical = -9mm) and (horizontal = 9mm)
10.52 R arm fully in, L arm fully out
beam steering hard right
14:24 Frank has informed us that the CRYRING team will be examining the electron cooler for th enext few hours. Run 19 stopped, Run 20 started.
Detectors moved fully out, target OFF.
All histograms and stats zero'd
Access to the cave is required, beam OFF
15:45 Channel 1 back to 150V.
17.40 DAQ continues file G22-88/R20_13
DSSSD bias & leakage current OK - attachments 23-24
FEE64 temperatures OK - attachment 25
All system wide checks OK except aida08 FPGA error - attachment 26
WR timestamps OK - attachment 27
ADC data item stats OK - attachment 28
hot channels aida01 ( 80k ) and aida15 ( 7k )
per FEE64 Rate and Stat spectra - attachments 29-30
Merger, Merger stats and TapeServer - attachments 31-32
23.12 DAQ continues file G22-88/R20_20
DSSSD bias & leakage current OK - attachments 33-34
FEE64 temperatures OK
All system wide checks OK except aida08 FPGA error - attachment 35
WR timestamps OK - attachment 36
ADC data item stats OK - attachment 37
hot channels aida01 ( 80k ) and aida15 ( 7k )
per FEE64 Rate and Stat spectra - attachments 38
Merger, Merger stats and TapeServer - attachments 39-40
03.47 DAQ continues file G22-88/R20_28
DSSSD bias & leakage current OK - attachments 41-42
FEE64 temperatures OK - attachment 43
ADC data item stats - attachment 44
aida12 rate - HEC events
per FEE64 Rate spectra - attachment 45
Check ASIC load
ADC data item stats - attachment 46
per FEE64 Rate spectra - attachment 47
Merger, Merger stats and TapeServer - attachments 48-49
|
Attachment 1: Screenshot_from_2024-02-12_02-34-50.png
|
|
Attachment 2: Screenshot_from_2024-02-12_02-35-12.png
|
|
Attachment 3: Screenshot_from_2024-02-12_02-35-44.png
|
|
Attachment 4: Screenshot_from_2024-02-12_02-36-21.png
|
|
Attachment 5: Screenshot_from_2024-02-12_02-37-20.png
|
|
Attachment 6: Screenshot_from_2024-02-12_02-38-35.png
|
|
Attachment 7: Screenshot_from_2024-02-12_02-39-32.png
|
|
Attachment 8: Screenshot_from_2024-02-12_02-39-52.png
|
|
Attachment 9: Screenshot_from_2024-02-12_02-40-05.png
|
|
Attachment 10: Screenshot_from_2024-02-12_09-05-53.png
|
|
Attachment 11: Screenshot_from_2024-02-12_09-06-03.png
|
|
Attachment 12: Screenshot_from_2024-02-12_09-06-42.png
|
|
Attachment 13: Screenshot_from_2024-02-12_09-07-02.png
|
|
Attachment 14: Screenshot_from_2024-02-12_09-07-31.png
|
|
Attachment 15: Screenshot_from_2024-02-12_09-07-42.png
|
|
Attachment 16: Screenshot_from_2024-02-12_09-08-23.png
|
|
Attachment 17: Screenshot_from_2024-02-12_09-08-48.png
|
|
Attachment 18: Screenshot_from_2024-02-12_09-08-54.png
|
|
Attachment 19: Screenshot_from_2024-02-12_09-09-03.png
|
|
Attachment 20: 20240212_095432.jpg
|
|
Attachment 21: 20240212_095444.jpg
|
|
Attachment 22: 20240212_095449.jpg
|
|
Attachment 23: Screenshot_from_2024-02-12_17-40-16.png
|
|
Attachment 24: Screenshot_from_2024-02-12_17-40-25.png
|
|
Attachment 25: Screenshot_from_2024-02-12_17-40-43.png
|
|
Attachment 26: Screenshot_from_2024-02-12_17-41-01.png
|
|
Attachment 27: Screenshot_from_2024-02-12_17-41-25.png
|
|
Attachment 28: Screenshot_from_2024-02-12_17-41-39.png
|
|
Attachment 29: Screenshot_from_2024-02-12_17-42-14.png
|
|
Attachment 30: Screenshot_from_2024-02-12_17-42-43.png
|
|
Attachment 31: Screenshot_from_2024-02-12_17-43-00.png
|
|
Attachment 32: Screenshot_from_2024-02-12_17-43-12.png
|
|
Attachment 33: Screenshot_from_2024-02-12_23-12-12.png
|
|
Attachment 34: Screenshot_from_2024-02-12_23-12-35.png
|
|
Attachment 35: Screenshot_from_2024-02-12_23-12-58.png
|
|
Attachment 36: Screenshot_from_2024-02-12_23-13-38.png
|
|
Attachment 37: Screenshot_from_2024-02-12_23-13-57.png
|
|
Attachment 38: Screenshot_from_2024-02-12_23-15-02.png
|
|
Attachment 39: Screenshot_from_2024-02-12_23-15-21.png
|
|
Attachment 40: Screenshot_from_2024-02-12_23-15-39.png
|
|
Attachment 41: Screenshot_from_2024-02-13_03-47-40.png
|
|
Attachment 42: Screenshot_from_2024-02-13_03-48-14.png
|
|
Attachment 43: Screenshot_from_2024-02-13_03-50-53.png
|
|
Attachment 44: Screenshot_from_2024-02-13_03-51-24.png
|
|
Attachment 45: Screenshot_from_2024-02-13_03-51-50.png
|
|
Attachment 46: Screenshot_from_2024-02-13_03-53-21.png
|
|
Attachment 47: Screenshot_from_2024-02-13_03-53-41.png
|
|
Attachment 48: Screenshot_from_2024-02-13_03-54-00.png
|
|
Attachment 49: Screenshot_from_2024-02-13_03-54-15.png
|
|
554
|
Tue May 28 12:38:31 2024 |
TD, JM, CB | Run 2 - Alpha background run |
13.35 FEE64 temperatures OK - attachment 1
ADC data item rates OK - attachment 2
overall rate dominated by 2x hot channels aida15
per FEE64 Stat spectra - attachment 3
spectra consistent with April alpha background test
note high HEC data stats for aida12 asic#2 - can probably be fixed by ASIC control check
per 1.8.W spectra - 20us FSR - attachments 4-5
note 100kHz ripple observed for some FEE64s cf. https://elog.ph.ed.ac.uk/CARME/544
Run stopped 15:15 |
Attachment 1: Screenshot_from_2024-05-28_13-35-03.png
|
|
Attachment 2: Screenshot_from_2024-05-28_13-34-30.png
|
|
Attachment 3: Screenshot_from_2024-05-28_13-33-19.png
|
|
Attachment 4: Screenshot_from_2024-05-28_13-36-30.png
|
|
Attachment 5: Screenshot_from_2024-05-28_13-37-16.png
|
|
555
|
Tue May 28 15:25:21 2024 |
TD, JM, CB | Pulser tests |
R3 started
Pulser ON. Approx 2 kHZ.
1.8*w waveforms attachments 1+2
ADC data items statistics - attchment 3
1.8*L spectra - attachments 4+5
Pulser widths are larger than during testing prior to the Feb beamtime. Widths in Channels;
aida01 = 76
aida02 = 82
aida03 = will upate all later tonight..
R3 ended. Pulser OFF
17:15
R4 Started. Alpha background run.
|
Attachment 1: Screenshot_from_2024-05-28_16-14-56.png
|
|
Attachment 2: Screenshot_from_2024-05-28_16-15-43.png
|
|
Attachment 3: Screenshot_from_2024-05-28_16-16-18.png
|
|
Attachment 4: Screenshot_from_2024-05-28_16-20-05.png
|
|
Attachment 5: Screenshot_from_2024-05-28_16-28-46.png
|
|
8
|
Thu Sep 10 11:34:30 2020 |
TD, JM | Thursday 10 September |
All neg feed-throughs have now been fully installed, with ground tags
and power wires crimped and attached to the correct pins. Feed-throughs
are installed as seen in Image
1 of zip file, with mark at the top of the feed-through. The pin
assignment is seen in Image 2. The pins are assigned letters A to F,
with F the top pin and C the bottom
pin as installed(refer to images 1+2). The ground is pin c, with the
two power wires connected to the bottom pins either side of the ground
(pins b and d). Connections of
wires from the negs to the feed-through is seen in image 3. Feed-
throughs have been electrically checked. The ground pin is checked
against the chamber giving
approx 0.5 ohms and the power pins are checked together giving 5-10
ohms. Each of the power pins are open circuit with respect to the
ground. A
thermocouple has been attached under the bolt of one of the neg pumps
(image 4).
Pirani gauge and hot cathode gauge have been installed on the chamber
(images 5,6,7,8) on the section furthest from the turbos.
Upper valve, turbo and supports have all now been installed (images
9,10,11). Images 12,13 are of the internal of the turbo and turbo
ports. The lower valve supports
produced by the Daresbury group (image 14) are also now attached. These
supports were required as the lower valve sits higher than anticipated
due to shorter right-angled
flanges.
Chamber is now ready to close and leak test! |
Attachment 1: 20200910_112152.jpg
|
|
Attachment 2: 20200910_112211.jpg
|
|
Attachment 3: Photos_(1).zip
|
187
|
Fri Feb 4 12:49:54 2022 |
TD, JM | Grounding Tests and current status |
JM plans to install new crimped, 3mm dia copper drain wires (a la AIDA@DESPEC) this afternoon.
Initial Grounding - Lemo cables connecting adaptor cards ground in daisy chain. Fee bodies connected by 3mm copper drain wires in daisy chain. Two chains brought together
at final adaptor card which is connected to cryring ground.
Attachments 1-5
ADC data item rates all <10k
ASIC settings all LEC slow comparators 0x64
1.8.L spectra aida05-08 widths 556, 511, ?, 570 ch FWHM respectively
1.8.W spectra 20us FSR
Adaptor card grounding image
1.8L widths appear broader than previous day of ~300 width. Reason unknown, no change made to setup as yet.
Second Grounding - 3mm copper drain wires connect each adaptor card to Fee body. Fee bodies daisy chained together using 3mm copper drain wire and connected to cryring
ground.
ADC data item rates all <10k
ASIC settings all LEC slow comparators 0x64
Attachments 6-8
1.8.L spectra aida05-06 widths 620, 550 ch FWHM respectively, 1.1.L aida08 width 350 ch FWHM
1.8.W spectra 20us FSR. Some extra high frequency noise
Adaptor card grounding
Third Grounding - 3mm copper drain wires connect adaptor cards in daisy chains. Fee bodies daisy chained together using 3mm copper drain wire. Two chains brought
together and connected to cryring ground.
ADC data item rates all <10k
ASIC settings all LEC slow comparators 0x64
1.8.L spectra aida05-08 similar to initial grounding ~500 ch FWHM
Attachments 9-11
1.8.W spectra 20us FSR.
AIDA5-8 channel rates. Rates dominated by noisy strips. Missing strips come and go as ASIC settings checked.
Adaptor card grounding
Some work still required to reduce noise in the system and reduce pulser widths. Pulser should also be checked on scope
Gauge turned back ON. Bias 80V, 3.5 uA before. Bias 80V, 5.4 uA after. Bias turned off and on again. NO change to diode characteristic, current ramps high before coming
down once bias on. Bias left ON 80V to see if stable when second gauge turned on and valves reopened. Pulser ON. Fee power OFF. Water cooling ON.
No significant changes to waveforms, pulser width or rates with gauge ON. Other noise contributions probably outweigh effect of the gauge at this point.
3mm copper grounding cable and attachments, crimper and Yorkshire tea left in control room. |
Attachment 1: Screenshot_from_2022-02-04_13-37-54.png
|
|
Attachment 2: Screenshot_from_2022-02-04_13-38-14.png
|
|
Attachment 3: Screenshot_from_2022-02-04_13-43-30.png
|
|
Attachment 4: Screenshot_from_2022-02-04_13-48-28.png
|
|
Attachment 5: 20220203_100719.jpg
|
|
Attachment 6: 2022-02-04_15-03-391.8*L.png
|
|
Attachment 7: 2022-02-04_14-57-50aida8-1.8*W.png
|
|
Attachment 8: 2022-02-04_16-13-39-1*W.png
|
|
Attachment 9: 2022-02-04_16-01-49rateAIDA5-8.png
|
|
Attachment 10: 20220204_154113.jpg
|
|