Entry  Sat Aug 12 11:57:51 2023, JM, Updated thermocouple positions and heater channel layouts 6x
Heater channel layouts for the interaction chamber and carme in attached documents. 

Updated thermocouple positions; (front section is closest to gas-target, rear section is moving detector end)


1-1 Internal TC 1
1-2 Internal TC 2
1-3 Internal TC 3
1-4 CARME - top of the front section
1-5
Entry  Sat Aug 12 15:06:51 2023, JM, Initial bakeout tests 20230813_114600.jpg20230813_132550.jpg20230813_170829.jpg20230813_205613.jpg20230813_210238.jpg
12/08/23

Baking testing. Aim to find relationship between heater temperature setpoint and the temperature of the chamber and floating temperature in the
baking volume. Behaviour of the heater tempertures and ability to control the heating is also required. Ambient chamber temperature ~22 C. Interaction
Entry  Mon Aug 14 09:22:56 2023, JM, Bakeout 20230814_150430.jpg20230815_094400.jpgHeater-power.pngHeater-ITC-temp.pngPressure-ITC-temp.png
14/08/23

Temperature in the baking volume is ~ 42 C and the pressure is 4.6e-8 mbar. Current heaters set point is 135 C. This will now be increased to
200 C to start increasing the baking temperature more significantly.
Entry  Fri Sep 22 12:35:46 2023, JM, Bakeout plots Heater-chamber-temps.pngpressure-chamber-temp.pngHeater-power-chamber-temp.pngHeater-power-temp.png
Attached are plots for the previous bakeout of CARME which may aid in the bakeout to come in the following week.  

Plots relate the heater temperatures and heater powers with the chamber temperature (internal floating thermocouple) and pressure inside CARME. 
Entry  Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024 
EMERGENCY SHUTDOWNS

1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)

2. Internal target:
Entry  Tue Feb 20 07:50:10 2024, JM, DAQ restart 
DAQ restarted. Run46. All appears OK, aida01 shows high rates across ASIC 4 even with no beam which could not be resolved via ASIC control. May suggest
some damge.

Merger is running and tape server is writing data to disk. Data rate is about 1300 kB/sec from 800 kb/sec due to increase in aida01 rate.
Entry  Tue Feb 20 09:51:37 2024, JM, Run 48 beam on target 
Run 48 started
Entry  Tue Feb 20 14:12:32 2024, JM, Shutdown Screenshot_from_2024-02-20_15-11-40.png
CARME DAQ shutdown. FEEs turned OFF and all MIDAS server windows closed.

Detector bias turned OFF.

Final leakage current plot - attachment 1
Entry  Mon May 27 15:25:08 2024, JM, Startup 
27/05/24

The carme-gsi computer has been moved from the server room into the shifter control room.

Startup of the DAQ looks OK. Settings loaded 2024Apr24
Entry  Wed May 29 08:10:32 2024, JM, Run4 - alpha background 
09:00

R4 alpha background continues, currently R4_12

Temps OK, system checks unchanged from previous status (OK, aida16 clock and ADC issue)
Entry  Wed Jun 5 13:34:02 2024, JM, Run 37 - Change in thresholds Screenshot_from_2024-06-05_14-36-44.png
14:20

Target nozzle currently being replaced. No beam

We have decided to switch to 15N beam from now on.
Entry  Mon Jun 10 18:22:47 2024, JM, Electron cooler calculations space-charge-2.pngspace-charge-1.pngBeamCalc.png
Ion beam energy is calculated using Beamcalc (https://web-docs.gsi.de/~lestinsk/beamcalc/electron.php)

Electron current is set to 4.3 mA and can be taken from Grafana

Alpha factor is 50
Entry  Tue Jun 11 20:10:25 2024, JM, Run 63 - Beam only background 
21:00

Claude has achieved optimal cooling parameters for the beam

No target and internal work inside the cave tomorrow is required
Entry  Fri Jun 14 14:52:02 2024, JM, Beam-Target Overlap Scan 20240614_153532.jpgBeam-overlap-updated.png
The orbit of the beam in the ring was re-configured so that the beam position is more central.

With the target density at ~6e11 at/cm2 this allowed a target overlap scan using the beam lifetime to be performed. 

Beam put into bunched mode to allow the number of particles to be observed on Grafana.
Entry  Sun Jun 16 22:40:11 2024, JM, Target overlap test - R81 Beam-overlap-updated2.png
23:10

Beam set to bunched mode to observe beam lifetime. 

Electron cooler voltage setpoint kept at 246.8 V. Note this is 0.5 V lower than the previous test where the setpoint was 247.3 V
Entry  Sun Jun 16 22:49:22 2024, JM, Run 82 
23:38

Cooler voltage setpoint 247.5 V.

FC20 read value 246.95 V.
Entry  Mon Jun 17 00:05:13 2024, JM, Run 83 
01:00

Cooler voltage setpoint 247.6 V.

FC20 read value 247.05 V.
Entry  Mon Jun 17 02:05:37 2024, JM, Run 84 
03:00

Cooler voltage setpoint 247.7 V.

FC20 read value 247.15 V.
Entry  Mon Jun 17 04:01:16 2024, JM, Run 85 
05:00

Cooler voltage setpoint 247.45 V.

FC20 read value 246.9 V.
Entry  Mon Jun 17 05:47:35 2024, JM, Run 86 
06:50

No sign of the resonance during night shift. New run started but when operators are avaiable we will likely move to higher energies to try and
observe the (p,a) reaction.