AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 26 of 38  ELOG logo
ID Date Authordown Subject Text Attachments
  268   Thu Feb 24 08:30:36 2022 JG, MSAIDA5 calibration test failed - solvedUPDATE: THE PROBLEM IS SOLVED FOR NOW:

Doing the calib for the 5th time
eventually worked.
 Screenshot_from_2022-02-24_09-09-36.pngScreenshot_from_2022-02-24_09-29-24.png 
  269   Thu Feb 24 09:43:16 2022 JG, MScheckBeam is still beeing tuned. Target is off.

 

- Motor on manual
 13x 
  468   Mon Jan 15 18:51:28 2024 JG, DR, TDMonday 15 January
Cooling water manifolds
  
  469   Tue Jan 16 08:57:44 2024 JG, DR, TDTuesday 16 January10.00 Outflow manifold returned from workshop
with leaking attachment point welding re-worked.
 8x 
  697   Tue May 27 15:18:46 2025 JG, CN, JMrun 24Run 24 running

27/05/2025

We start a new run with real data
 7x 
  331   Mon Feb 28 13:56:02 2022 JG, CBTemperature cycle to 125K14:45

Rutherford rate was decreased significantly
for longer period.
  
  456   Wed Oct 18 16:47:36 2023 JG, CBPower outageLocal power outage at the CRYRING today,
while JG was trying to activate the ion pumps.
Unlcear what caused it.
  
  323   Mon Feb 28 06:12:58 2022 JG, AK, USCurrent status07:20

Temperature setpoint = 110 k

Rutherford rates shaky, peak max
 8x 
  326   Mon Feb 28 08:36:35 2022 JG, AK, CBCurrent status09:35

beam intensity at injection: 8.2e7
ions
 8x 
  327   Mon Feb 28 09:31:48 2022 JG, AK, CBCurrent status10:35

beam intensity at injection: 1e8
ions
 8x 
  329   Mon Feb 28 11:57:22 2022 JG, AK, CBCurrent status12:55

beam intensity at injection: 9e7
ions
 8x 
  330   Mon Feb 28 13:16:39 2022 JG, AK, CBCurrent status14:16

beam intensity at injection: 7e7
ions
 8x 
  750   Mon Jun 16 11:12:22 2025 JG, AK, AR, EHrun 8312:15 restarted measurement with target
- Run 83

same settings as for runs 76, 77
 8x 
  324   Mon Feb 28 07:31:25 2022 JG, AKCurrent status08:30

Temperature setpoint = 110 k

Rutherford rates shaky, peak max
 8x 
  715   Mon Jun 2 20:03:43 2025 JG, AG, CB, EW, EMRun 45/46, 0.5 MeV/ARun 45 started.

D+ beam deuterium target. D+ beam
energy is 0.5 MeV/u. (beam calc calculation
 13x 
  713   Mon Jun 2 17:25:31 2025 JG, AGRun 43 scraper testsSame settings are Run 42 but bunched beam
and scrapers set to:  30 / - 30 mm.

 
  
  714   Mon Jun 2 17:48:07 2025 JG, AGRun 44 scraper testsSame settings are Run 43 but with coasting
beam and scrapers set to:  30 / - 30
mm.
 Screenshot_from_2025-06-02_18-51-24.pngScreenshot_from_2025-06-02_19-27-31.png 
  325   Mon Feb 28 07:35:51 2022 JGcurrent logger crashedThe current logger did crash in the evening
of 25.02. and stopped logging since then,
it seems.
 Screenshot_from_2022-02-28_08-38-35.png 
  517   Thu Feb 15 13:18:30 2024 JGMBS DAQ: target & ring valuesWe are running an MBS DAQ to record the
attached list of slow control values of the
ring and the target. In most cases this is
 2024_jet_daq.txt 
  682   Mon May 12 13:25:09 2025 JGMBS DAQ - overviewAn MBS DAQ is running to collect two types
of data:
  
ELOG V3.1.3-7933898