AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 31 of 34
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
665 Entries
Goto page
Previous
1
,
2
,
3
...
30
, 31,
32
,
33
,
34
Next
ID
Date
Author
Subject
Text
65
Thu Sep 9 13:01:07 2021
CB RSS + OG
All feedthrough flanges mounted and motor rotated
Moved cables that touched neg pumps. See
photos. Please bear in mind perspective.
Note avoiding touching chamber
64
Wed Sep 8 17:03:07 2021
CB RSS + OG NB
Six feedthrough flanges mounted
Continued to mount flanges as per previous
ELOG entry.
Peter also remarked that the wires look a
23x
63
Wed Sep 8 10:52:54 2021
CB RSS + OG
First feedthrough flange mounted
Assembled feedthrough flange with re-cut
SS support bracket. M3 vented on the
sides, M3x30 partly threaded on top. Top
62
Tue Sep 7 14:10:02 2021
CB RSS + OG
Strain relief SS support re-drilled
Re-drilled SS supports in order to fit M3
screws.
61
Tue Sep 7 12:40:43 2021
CB ML + RH
CARME survey preparation
Rudi and survey group representative came
to CARME.
60
Tue Sep 7 11:37:05 2021
CB RSS + OG
Update on strain relief screw issues
Tested every strain relief. M3 screws get
stuck at different points in each hole. Only
one good hole out of 16
59
Mon Sep 6 14:13:17 2021
CB ML
Motors mounted - first attempt
Mounted both motors on CARME. Started
with outside motor.
58
Sat Sep 4 15:54:50 2021
CB RSS
Motor mounting preparation
Prepared the motors to be mounted and
found all components required. No issues.
57
Fri Sep 3 15:55:00 2021
CB RSS
Issues with cable clamps
Attempted to mount cable clamps for strain
relief on inner part of Allectra
56
Fri Sep 3 14:14:40 2021
TD
Leybold IE514 manual & calibration data
55
Fri Sep 3 08:14:51 2021
CB RSS
Issues foreseeable splitting CARME
In order to install the detector supports
and eventually install the detectors
7x
54
Fri Sep 3 08:12:39 2021
CB RSS
Pressure after overnight pump down
03.09.2021 09:00 5.27E-7 mbar
03.09.2021 13:00 4.08E-7 mbar
53
Thu Sep 2 21:04:26 2021
CB RSS ML + DR OG
Gate valves mounted + pump down
Mounted both gate valves and support. Gate
valves could not be installed one bolt
6x
52
Thu Sep 2 10:41:16 2021
CB RSS + DR OG
CARME connected to the CRYRING
Connected CARME to the CRYRING via tube
plus bellows. See attach.
51
Wed Sep 1 17:14:16 2021
CB RSS + DR ML
CARME mounted on the CRYRING
Lifted CARME with Al support on the
CRYRING. No issues during transportation.
50
Wed Sep 1 12:05:28 2021
CB RSS
Preparation for CARME on CRYRING YR09
Mounted additional cross member for motor
support. See attach 1
49
Tue Aug 31 18:56:35 2021
CB
CARME status
(ELOG does not allow more pictures to be added
to previous entry)
9x
48
Tue Aug 31 18:34:41 2021
CB RSS + DR OG
CARME on Al stand
Lifted CARME off the floor and mounted feet
on sides. It was found impossible to put
four bolts for each foot
47
Tue Aug 31 11:55:11 2021
CB RSS
Last preparations for CARME lift
Found strut bolts in the bag with
spherical washers. Mounted the struts and
46
Tue Aug 31 07:09:54 2021
CB RSS (rem) JM
Preparation for mounting
(30 August 2021)
The current state of YR09 is as per attach