522
|
Sat Feb 17 13:21:44 2024 |
JM, CB | Beam on target - motors tests | 14:01
Run 36 started.
We put both detectors to the fully |
  |
270
|
Thu Feb 24 14:31:25 2022 |
JM, ML, CN | Beam Tuning Run 76 | 15:30
1.5 MeV/u beam currently being
tuned |
6x |
226
|
Tue Feb 22 04:09:28 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 - first event at 10MeV ! | 05:00
Beam ON ~2E6 pps, still fluctates
between 2e6 and 6e6 (like a step function) |
11x |
228
|
Tue Feb 22 05:47:18 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 - 2 events at 10MeV! | 06:47
Beam ON ~2.0E6 pps, still fluctates
between 1e6 and 6e6 (like a step function) |
11x |
223
|
Tue Feb 22 00:32:35 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 | 01:30
Beam ON ~6E6 pps
Target ON and open to the ring |
 |
224
|
Tue Feb 22 02:02:11 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 | 03:00
Beam ON ~7E6 pps
Target ON and open to the ring |
10x |
225
|
Tue Feb 22 03:05:06 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 | 04:00
Beam ON ~5.5E6 pps, but it fluctates
between 2e6 and 6e6 (like a step function) |
9x |
227
|
Tue Feb 22 05:12:38 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 | 06:00
Beam ON ~1.5E6 pps, still fluctates
between 1e6 and 6e6 (like a step function) |
11x |
219
|
Mon Feb 21 17:26:19 2022 |
JM, CB, SHB, OH (remotely) | Beam ON run 53 | 21/2/22 16:00
Call from main control room, beam
is ON, probably has been for several hours |
9x |
213
|
Sat Feb 19 20:08:43 2022 |
JM, CB | Beam ON run 49 | Run started 19/2/22 21:05. Beam ON
Temperatures OK
System wide checks OK - white rabbit |
6x |
359
|
Tue Mar 1 23:43:15 2022 |
David, George | Beam Intensity Drop | 00:38
Intensity in the ring dropped by 2
orders of magnitude to 5e5 on injection |
|
610
|
Mon Jun 10 07:40:47 2024 |
RSS, DB | Beam | 08:26: There is no beam and Gleb is informed.
08:46: Beam is back. |
|
167
|
Mon Jan 10 20:52:53 2022 |
JM, TD, OH | Baking tent removed, VI tests | Baking tent, frame and trays fully
removed from CARME chamber. Removal of baking
frame required removing air lines from upper |
  |
424
|
Fri Jul 21 08:21:54 2023 |
TD, RSS | Baking tent manual | 09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar
Today - install TCs, connect to Pico |
|
431
|
Thu Aug 10 07:51:43 2023 |
JM | Baking tent and heater testing | 09/08/23
Attached is the current pumpdown
plot taken from grafana. |
8x |
13
|
Wed Sep 16 08:52:03 2020 |
CB (remotely) | Baking status 16-17 September | 16 September
08:50
|
    |
11
|
Mon Sep 14 12:07:40 2020 |
JM, CB (remotely) | Baking status | Mon 14 Sep 09:50
Jordan moved the TC08 picolog 2 away from |
   |
16
|
Fri Sep 18 10:28:57 2020 |
JM, CB(remotely) | Baking status | 10:28
Reducing temperature in steps. System cooling
down. See attached.
|
|
22
|
Sat Sep 26 09:31:46 2020 |
JM, CB (both remotely) | Baking over weekend | Sat 26 Sep
09:15 Baking started automatic
mode |
   |
10
|
Sun Sep 13 08:06:25 2020 |
CB (remotely) | Baking over the weekend -2 | Sun 13 Sep 08:06
Baking reached 93 C yesterday afternoon at |
 |
|