  61   Tue Sep 7 12:40:43 2021 CB ML + RHCARME survey preparation
Rudi and survey group representative came 
to CARME. 

Elephant feet confirmed to be out of 
position with respect to the models. Still 
unclear if CARME is where it should be 
with respect to the jet target and 
electron target. I.e. do they have space 
to mount? Do we have to move CARME again 
(hopefully not!!)

Valve to downstream confirmed out of 
alignment. Solution unclear but may be 
needed to ensure beam goes through 
detectors correctly.

Survey group will come to confirm CARME 
position on Thursday 16 September. We 
cannot mount baking tent until then, but 
no major issue given delays due to strain 
relieves and shutdown on 12-15 September.
  60   Tue Sep 7 11:37:05 2021 CB RSS + OGUpdate on strain relief screw issues
Tested every strain relief. M3 screws get stuck at different points in each hole. Only one good hole out of 16
(2x8).
They were tested in Edinburgh - unclear if this is a result of baking at high temperatures, or bad screws, or
something else.

Easiest solution may be to re-machine holes and clean the connectors here in GSI.
Now investigating options.
  59   Mon Sep 6 14:13:17 2021 CB MLMotors mounted - first attempt
Mounted both  motors on CARME. Started 
with outside motor.

M6x160 screws proved slightly too long to 
fix bellows to rod and seal the vacuum. 
Had to be manually shortened by 1 cm 
roughly.

Mounted whole assembly but could not fix 
actuator rod to moving plate due to holes 
mis-alignment.

Mounted motor on CARME but could not align 
holes on flange and chamber without 
turning motor to the side... see attach 3 and 4


Got in contact with Peter over lunch and 
understood issue.

Mounted second motor with experience 
acquired. No issues. All screws go in. 
Motor box level. See attach 5

Will need to dismount / remount first 
motor box before pumping down. Currently 
secure on CARME thanks to adjustable 
support.

Note we forgot to buy DN 40 CF gaskets. ML 
supplied a few. Will buy more. Needed 
between bellows and rod.


Strain relief mentioned in previous ELOG 
entry was taken to workshop and hole re-
drilled. Workshop reports other hole is OK 
for M3 screw. Either screw used or hole 
were poorly machined. M3 screws should be 
correct. Re-machined part sent for 
cleaning.

Will try with clean parts again tomorrow 
unless we remount motors.

Activities for the day cut shorter due to 
SPARC meeting this week.
Attachment 1: 20210906_113522.jpg
20210906_113522.jpg
Attachment 2: 20210906_113519.jpg
20210906_113519.jpg
Attachment 3: 20210906_115601.jpg
20210906_115601.jpg
Attachment 4: 20210906_152607.jpg
20210906_152607.jpg
Attachment 5: 20210906_143944.jpg
20210906_143944.jpg
  58   Sat Sep 4 15:54:50 2021 CB RSSMotor mounting preparation
Prepared the motors to be mounted and 
found all components required. No issues. 
May have to partly dismount again to fix 
bellows depending on ease of mounting.

Note extremely long screws mentioned in 
previous Elog inventory are to be used for 
the motors.

Attempted to swap Pirani gauge with ours 
but realised it's CF and needs appropriate 
port without risk of baking. That port 
would be on the interaction chamber which 
is not going to be mounted. Will probably 
keep using ABD gauge for now.

Peter spotted mistake in mounting front 
foot of CARME which is back to front. 
Correct mount will gain us 2-3 cm but will 
conflict with current CARME position fixed 
by tube on the back. Will discuss options 
with ML.

Motor mounting to take place on Mon with 
local technical support. No activities 
tomorrow unless a solution for the clamps 
mentioned in previous entry is found (i.e. 
what size bolts go on top). Peter will 
check step file and we will consult with 
local engineers on Mon pm.
Attachment 1: 20210904_162517.jpg
20210904_162517.jpg
Attachment 2: 20210904_162520.jpg
20210904_162520.jpg
  57   Fri Sep 3 15:55:00 2021 CB RSSIssues with cable clamps
Attempted to mount cable clamps for strain 
relief on inner part of Allectra 
feedthroughs.

SS support mounted with M3 vented screws 
OK
Cannot figure out which bolt type to use 
to fix Macor on SS support.

M2 falls through

M3 screws in partly and gets stuck...
Will need to figure out how to get unstuck

No M2.5 bolts available.

In contact with Peter. Not clear what the 
solution was

Will try again tomorrow or move to motors 
first.
Attachment 1: 20210903_154614.jpg
20210903_154614.jpg
Attachment 2: 20210903_162519.jpg
20210903_162519.jpg
  56   Fri Sep 3 14:14:40 2021 TDLeybold IE514 manual & calibration data
Attachment 1: 20210903_141201.jpg
20210903_141201.jpg
Attachment 2: Ionivac_Sensors_IE414_IE514.pdf
Ionivac_Sensors_IE414_IE514.pdf Ionivac_Sensors_IE414_IE514.pdf Ionivac_Sensors_IE414_IE514.pdf Ionivac_Sensors_IE414_IE514.pdf Ionivac_Sensors_IE414_IE514.pdf Ionivac_Sensors_IE414_IE514.pdf Ionivac_Sensors_IE414_IE514.pdf Ionivac_Sensors_IE414_IE514.pdf
  55   Fri Sep 3 08:14:51 2021 CB RSSIssues foreseeable splitting CARME
In order to install the detector supports 
and eventually install the detectors 
themselves CARME must be split and 
separated via rails.

However it does not look like we have 
sufficient clearance on either side. See 
pictures attached.

I suggest we mount the strain relievers 
wires and motors, not split CARME, and 
pump down + bake to give us time to figure 
out what is different from the models and 
how to fix it. Outgassing from detector 
supports should be negligible wrt wires.

One possibility would be to install rail 
extension on the back side of the Al frame 
where the cross was meant to be supported, 
temporarily remove the tube connecting 
CARME to the YR09 valve and slide CARME 
back. Will need to discuss with Peter.
Attachment 1: 20210903_085801.jpg
20210903_085801.jpg
Attachment 2: 20210903_085805.jpg
20210903_085805.jpg
Attachment 3: 20210903_085811.jpg
20210903_085811.jpg
Attachment 4: 20210903_085822.jpg
20210903_085822.jpg
Attachment 5: 20210903_085958.jpg
20210903_085958.jpg
Attachment 6: 20210903_090003.jpg
20210903_090003.jpg
Attachment 7: 20210903_090024.jpg
20210903_090024.jpg
  54   Fri Sep 3 08:12:39 2021 CB RSSPressure after overnight pump down
03.09.2021   09:00   5.27E-7 mbar     
03.09.2021   13:00   4.08E-7 mbar                   

09;00    Will keep pumping down this morning.
Attachment 1: 20210903_085646.jpg
20210903_085646.jpg
Attachment 2: IMG_4487.JPG
IMG_4487.JPG
  53   Thu Sep 2 21:04:26 2021 CB RSS ML + DR OGGate valves mounted + pump down
Mounted both gate valves and support. Gate 
valves could not be installed one bolt 
rotated from 90 degrees as per drawings 
due to mechanical conflict with back foot.

Using rotating flanges some small rotation 
from 90 was achieved. This may be 
sufficient given the reason for the 
rotation was to avoid mechanical conflicts 
with ring parts that are no longer there.

Valve struts had to be modified as gate 
valve is much lower and close to Al frame 
than in Daresbury.

ML suggested that the reason for the 
change in height mentioned in previous 
entry is that the ring gate valve to YR10 
is not centered. Solutions will be 
considered when the other two setups in 
YR09 are mounted and the alignment 
situation is more clear


Noted a few blind flanges are bluish, 
which indicates SS 304 instead of 316. Did 
we get the wrong ones from ITL? Did we 
swap them in Daresbury by mistake? Is it 
just an odd colour?


Installed turbo pump on top gate valve, 
Pirani gauge provided by ABD (where is 
ours?) and pumped down.

Reached 10-1 mbar in 10 minutes. Turbo on.
Reached 10-5 mbar on IE514 in 17 more 
minutes (where is its manual?)

Will leave pumping overnight.
Attachment 1: 20210902_152536.jpg
20210902_152536.jpg
Attachment 2: 20210902_153213.jpg
20210902_153213.jpg
Attachment 3: 20210902_170002.jpg
20210902_170002.jpg
Attachment 4: 20210902_192104.jpg
20210902_192104.jpg
Attachment 5: 20210902_192751.jpg
20210902_192751.jpg
Attachment 6: 20210902_193944.jpg
20210902_193944.jpg
  52   Thu Sep 2 10:41:16 2021 CB RSS + DR OGCARME connected to the CRYRING
Connected CARME to the CRYRING via tube 
plus bellows. See attach.

Had to lift CARME slightly wrt yesterday 
beam alignment to get a straight tube.
Attachment 1: 20210902_114031.jpg
20210902_114031.jpg
  51   Wed Sep 1 17:14:16 2021 CB RSS + DR MLCARME mounted on the CRYRING
Lifted CARME with Al support on the 
CRYRING. No issues during transportation. 

Drilled new holes in the Al feet to fit 
elephant feet. Unclear if the issue is 
with the model, the frame or the feet 
themselves. In any case this issue is 
sorted.

CARME was designed to interface with the 
CRYRING via the cross section with pumps 
and sensors that we decided dismount. To 
replace this section a length of xhv 
tubing and a bellow will be employed. 
Prepared today, to be mounted tomorrow.

Aligned CARME height with beam height. 
This posed issues due to difficulty to 
adjust bolts under the cross members used 
to support the motors. See previous log 
entry.

Bolts under those cross members are now 
only finger tight. Unclear whether the 
CARME section will drop slightly if 
disconnected from main body. It's the 
section housing the moving Dssds. May be 
an issue for tightening it back. Will 
investigate.

Gate valves and supports to be installed 
tomorrow morning.
Attachment 1: 20210901_162435.jpg
20210901_162435.jpg
Attachment 2: 20210901_173059.jpg
20210901_173059.jpg
Attachment 3: 20210901_174157.jpg
20210901_174157.jpg
Attachment 4: 20210901_134635.jpg
20210901_134635.jpg
Attachment 5: 20210901_173059.jpg
20210901_173059.jpg
  50   Wed Sep 1 12:05:28 2021 CB RSSPreparation for CARME on CRYRING YR09
Mounted additional cross member for motor 
support. See attach 1

Washer required to make it fit on foot on 
one side.

Holes in Al support are not matching elephant feet...! Will have to re-
drill them now.

Yr09 fully dismounted downstream
Attachment 1: 20210901_125504.jpg
20210901_125504.jpg
Attachment 2: 20210901_125517.jpg
20210901_125517.jpg
  49   Tue Aug 31 18:56:35 2021 CBCARME status
(ELOG does not allow more pictures to be added to previous entry)
Attachment 1: 20210831_171533.jpg
20210831_171533.jpg
Attachment 2: 20210831_171458.jpg
20210831_171458.jpg
Attachment 3: 20210831_171501.jpg
20210831_171501.jpg
Attachment 4: 20210831_171506.jpg
20210831_171506.jpg
Attachment 5: 20210831_171510.jpg
20210831_171510.jpg
Attachment 6: 20210831_171514.jpg
20210831_171514.jpg
Attachment 7: 20210831_171517.jpg
20210831_171517.jpg
Attachment 8: 20210831_171520.jpg
20210831_171520.jpg
Attachment 9: 20210831_171524.jpg
20210831_171524.jpg
  48   Tue Aug 31 18:34:41 2021 CB RSS + DR OGCARME on Al stand
Lifted CARME off the floor and mounted feet on sides. It was found impossible to put four bolts for each foot
due to alignment conflict. Three bolts were mounted per foot instead.

One of the mounting holes in CARME has been damaged and the thread has been ruined. Simple rethreading attempts
failed. Three good holes left - not an issue for now.

One of the shims between the feet and the chamber had to be modified in the workshop. Some feet were rather
difficult to mount, but in the end we succedeed.

CARME was then lifted on the Al frame and gently dropped. The crane remains in place overnight to prevent it
falling over given it is not anchored to the floor.

Front foot and back foot were also mounted. 

Elbows at the back were mounted.

Currently considering whether to mount gate valves before or after lifting in place on YR09. Lift experts will
decide tomorrow what is the easiest procedure given constraints on the ring.

See other attachment and next entry for current status.


YR09 downstream will be cleared tomorrow morning. Lift will proceed tomorrow afternoon.
Attachment 1: 20210831_144545.jpg
20210831_144545.jpg
Attachment 2: 20210831_171442.jpg
20210831_171442.jpg
Attachment 3: 20210831_171447.jpg
20210831_171447.jpg
Attachment 4: 20210831_171449.jpg
20210831_171449.jpg
Attachment 5: 20210831_171453.jpg
20210831_171453.jpg
  47   Tue Aug 31 11:55:11 2021 CB RSSLast preparations for CARME lift
Found strut bolts in the bag with 
spherical washers. Mounted the struts and 
the washers. See attach 1.

Vented CARME in preparation for lift.

Turbo off
Pressure starts increasing without 
introducing leaks. Up to 10-4 mbar. IE 514 
off.

Removed plastic cap from leak valve. 
Pressure rate increases. Leaky valve?

Turbo motor speed reaches 0 Hz in 1h

Opened leak valve. Scroll off. Pressure to 
10 mbar. Not increasing anymore. Turbo 
leak aperture likely to small to vent 
CARME volume.

Disconnected scroll. Carefully let air in 
by tweaking flexible hose connection. Not 
recommended again, but should be safe 
given turbo fully stop and chamber nearly 
vented.

Reached atmosphere in 10 minutes.

Now waiting for lifting support to mount 
feet.
Attachment 1: 16304077162843806956479048661374.jpg
16304077162843806956479048661374.jpg
Attachment 2: 16304077904321905824276870110392.jpg
16304077904321905824276870110392.jpg
  46   Tue Aug 31 07:09:54 2021 CB RSS (rem) JMPreparation for mounting
(30 August 2021)

The current state of YR09 is as per attach 1. CCC has been removed, but additional pumps and gauges remain. Some
will have to be mounted on CARME. Dismounting is scheduled for this Wed.

CB and RSS have been preparing for CARME to be mounted. JM supplied pictures of mounting process in DL. Attach 2-5.

2: Studs on carriages
3: CARME feet
4: Back foot
5: Elbows support

All components required have been located in the boxes except

- Cap hex bolts (M4 x 12?) to mount studs on carriages
- Plastic rails to remove cariages (a solution with bubble-wrap was found. Extra carriages are now in a box. Do
not turn it around.)
- Baking tray does not fit with carriages. Unclear how it did before. Will try to file down edges today.
- Bolts for CARME feet are of rather poor quality, and a host of different sizes. We may have to buy some, but
unclear what length.
- Studs are of different heights. That was not clear from previous pictures (attach 6)
- New and improved valve/elbow support (attach 7) is aligned worse than old one. Will keep using old one. Should
still work somehow.
Attachment 1: 20210830_110920.jpg
20210830_110920.jpg
Attachment 2: Al_frame.jpg
Al_frame.jpg
Attachment 3: 20200814_142437.jpg
20200814_142437.jpg
Attachment 4: 20200902_153219.jpg
20200902_153219.jpg
Attachment 5: 20210830_160613.jpg
20210830_160613.jpg
Attachment 6: 20210830_115903.jpg
20210830_115903.jpg
  45   Wed Aug 25 07:02:41 2021 RSS TD25-31 August
Pirani  IE514
mbar    mbar


25/8/21 08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00  0.0030   1.77e-8

----------------------------------------------------

27/8/21   08:00  0.0030   1.76e-8

----------------------------------------------------

28/8/21   17:30  0.0029   1.63e-8

----------------------------------------------------

30/8/21   08:00  0.0028   1.43e-8

----------------------------------------------------

31/8/21   08:30  0.0027  1.40e-8

Attachment 1: IMG_4349.JPG
IMG_4349.JPG
Attachment 2: IMG_4360.JPG
IMG_4360.JPG
Attachment 3: log_scale_26.08.png
log_scale_26.08.png
Attachment 4: turbo_pump_26.08.png
turbo_pump_26.08.png
Attachment 5: scroll_pump_26.08.png
scroll_pump_26.08.png
Attachment 6: IMG_4367.JPG
IMG_4367.JPG
Attachment 7: log_scale_27.08.png
log_scale_27.08.png
Attachment 8: IMG_4372.JPG
IMG_4372.JPG
Attachment 9: log_scale_28.08.png
log_scale_28.08.png
Attachment 10: IMG_4426.JPG
IMG_4426.JPG
Attachment 11: IMG_4427.JPG
IMG_4427.JPG
Attachment 12: log_scale_30.08.png
log_scale_30.08.png
Attachment 13: turbo_pump_30.08.png
turbo_pump_30.08.png
Attachment 14: scroll_pump_30.08.png
scroll_pump_30.08.png
Attachment 15: log_scale_31.08.png
log_scale_31.08.png
Attachment 16: turbo_pump_31.08.png
turbo_pump_31.08.png
Attachment 17: scroll_pump_31.08.png
scroll_pump_31.08.png
Attachment 18: IMG_4445.JPG
IMG_4445.JPG
Attachment 19: IMG_4446.JPG
IMG_4446.JPG
  44   Wed Aug 18 11:58:49 2021 NTD RSSMisc fittings and fasteners plus gasket inventory
Attachments 1-3 fasteners, fittings found amongst earlier shipments. I assume that the STFC DL cleaned items are for the internal detector mount assembly.


Inventory of silver-plated copper gaskets

             ID (cm)

7x DN250CF   25.4
5x DN200CF   20.0
5x DN160CF   15.3
100x DN100CF 10.0
4x DN63CF    6.3
16x DN35CF   3.5
23x DN16CF   1.6

N.B. ID is measured +/- 0.1cm and DNxxCF designation is what the Lesker catalogue says it means.

Attachments 4 & 9 2x motor rods and MACOR heat shields for cleaning

Attachment 5 - cable assemblies

Attachment 7 - what are these screws for?

 
Attachment 1: 20210818_113056.jpg
20210818_113056.jpg
Attachment 2: 20210818_111549.jpg
20210818_111549.jpg
Attachment 3: 20210818_111543.jpg
20210818_111543.jpg
Attachment 4: 20210819_162634.jpg
20210819_162634.jpg
Attachment 5: 20210819_163357.jpg
20210819_163357.jpg
Attachment 6: 20210819_163402.jpg
20210819_163402.jpg
Attachment 7: 20210819_163646.jpg
20210819_163646.jpg
Attachment 8: 20210819_163651.jpg
20210819_163651.jpg
Attachment 9: 20210819_164007.jpg
20210819_164007.jpg
Attachment 10: 20210819_164018.jpg
20210819_164018.jpg
Attachment 11: 20210819_164028.jpg
20210819_164028.jpg
Attachment 12: 20210819_164043.jpg
20210819_164043.jpg
Attachment 13: 20210819_164043.jpg
20210819_164043.jpg
Attachment 14: 20210819_164054.jpg
20210819_164054.jpg
Attachment 15: 20210819_164111.jpg
20210819_164111.jpg
Attachment 16: 20210819_164234.jpg
20210819_164234.jpg
Attachment 17: 20210819_164238.jpg
20210819_164238.jpg
Attachment 18: 20210819_164242.jpg
20210819_164242.jpg
Attachment 19: 20210819_164417.jpg
20210819_164417.jpg
Attachment 20: 20210819_164421.jpg
20210819_164421.jpg
Attachment 21: 20210819_164527.jpg
20210819_164527.jpg
Attachment 22: 20210819_164530.jpg
20210819_164530.jpg
  43   Wed Aug 18 07:07:26 2021 RSS TD18-24 August
Pirani  IE514
mbar    mbar


18/8/21 08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032 3.72e-8

 

-------------------------------------------------------------

19/8/21  08:00  0.0032  3.38e-8

19/8/21  17:00  0.0032  3.31e-8

 

-------------------------------------------------------------

20/8/21  08:00  0.0032  3.02e-8

 

-------------------------------------------------------------

21/8/21  16:00  0.0032  2.59e-8

 

-------------------------------------------------------------

22/8/21  12:00  0.0034  2.44e-8

 

-------------------------------------------------------------

23/8/21  08:00  0.0030  2.23e-8

 

-------------------------------------------------------------

24/8/21  08:00  0.0030  2.15e-8

 

 

 

Attachment 1: IMG_4273.JPG
IMG_4273.JPG
Attachment 2: IMG_4274.JPG
IMG_4274.JPG
Attachment 3: log_scale_18.08.png
log_scale_18.08.png
Attachment 4: turbo_pump_18.08.png
turbo_pump_18.08.png
Attachment 5: scroll_pump_18.08.png
scroll_pump_18.08.png
Attachment 6: IMG_4281.JPG
IMG_4281.JPG
Attachment 7: log_scale_19.08.png
log_scale_19.08.png
Attachment 8: turbo_pump_19.08.png
turbo_pump_19.08.png
Attachment 9: scroll_pump_19.08.png
scroll_pump_19.08.png
Attachment 10: IMG_4290.JPG
IMG_4290.JPG
Attachment 11: IMG_4301.JPG
IMG_4301.JPG
Attachment 12: log_scale_21.08.png
log_scale_21.08.png
Attachment 13: turbo_pump_21.08.png
turbo_pump_21.08.png
Attachment 14: scroll_pump_21.08.png
scroll_pump_21.08.png
Attachment 15: IMG_4323.JPG
IMG_4323.JPG
Attachment 16: IMG_4324.JPG
IMG_4324.JPG
Attachment 17: log_scale_22.08.png
log_scale_22.08.png
Attachment 18: turbo_pump_22.08.png
turbo_pump_22.08.png
Attachment 19: scroll_pump_22.08.png
scroll_pump_22.08.png
Attachment 20: IMG_4339.JPG
IMG_4339.JPG
Attachment 21: IMG_4340.JPG
IMG_4340.JPG
Attachment 22: IMG_4345.JPG
IMG_4345.JPG
Attachment 23: log_scale_24.08.png
log_scale_24.08.png
Attachment 24: turbo_pump_24.08.png
turbo_pump_24.08.png
Attachment 25: scroll_pump_24.08.png
scroll_pump_24.08.png
  42   Fri Aug 13 07:28:37 2021 RSS TDFriday 13-17 August
Pirani  IE514
mbar    mbar



13/8/21 08:00 0.0075 3.53e-7
13/8/21 12:00 0.0065 2.80e-7
13/8/21 15:20 0.0065 2.40e-7
13/8/21 16:30 0.0060 2.29e-7


---------------------------------


14/8/21 12:00 0.0046 1.25e-7
14/8/21 12:00 0.0044 1.14e-7


---------------------------------


15/8/21 09:00 0.0040 8.47e-8
15/8/21 12:30 0.0040 8.00e-8
15/8/21 15:30 0.0040 7.69e-8


---------------------------------


16/8/21 08:00 0.0038 6.36e-8
16/8/21 11:30 0.0036 6.14e-8
16/8/21 17:00 0.0036 5.82e-8


---------------------------------


17/8/21 08:00 0.0034 4.82e-8
17/8/21 17:00 0.0034 4.47e-8
Attachment 1: IMG_4196.JPG
IMG_4196.JPG
Attachment 2: IMG_4197.JPG
IMG_4197.JPG
Attachment 3: IMG_4198.JPG
IMG_4198.JPG
Attachment 4: scroll_pump_13.08.png
scroll_pump_13.08.png
Attachment 5: turbo_pump_13.08.png
turbo_pump_13.08.png
Attachment 6: IMG_4237.JPG
IMG_4237.JPG
Attachment 7: IMG_4238.JPG
IMG_4238.JPG
Attachment 8: turbo_pump_14.08.png
turbo_pump_14.08.png
Attachment 9: scroll_pump_14.08.png
scroll_pump_14.08.png
Attachment 10: IMG_4244.JPG
IMG_4244.JPG
Attachment 11: IMG_4245.JPG
IMG_4245.JPG
Attachment 12: turbo_pump_15.08.png
turbo_pump_15.08.png
Attachment 13: scroll_pump_15.08.png
scroll_pump_15.08.png
Attachment 14: IMG_4257.JPG
IMG_4257.JPG
Attachment 15: IMG_4258.JPG
IMG_4258.JPG
Attachment 16: turbo_pump_16.08.png
turbo_pump_16.08.png
Attachment 17: scroll_pump_16.08.png
scroll_pump_16.08.png
Attachment 18: IMG_4265.JPG
IMG_4265.JPG
Attachment 19: IMG_4266.JPG
IMG_4266.JPG
Attachment 20: turbo_pump_log_scale.png
turbo_pump_log_scale.png
Attachment 21: scroll_pump_17.08.png
scroll_pump_17.08.png
Attachment 22: turbo_pump_17.08.png
turbo_pump_17.08.png
Attachment 23: log_scale_17.08.png
log_scale_17.08.png
ELOG V3.1.4-unknown