54
|
Fri Sep 3 08:12:39 2021 |
CB RSS | Pressure after overnight pump down | 03.09.2021 09:00 5.27E-7 mbar
03.09.2021 13:00 4.08E-7 mbar
|
 |
53
|
Thu Sep 2 21:04:26 2021 |
CB RSS ML + DR OG | Gate valves mounted + pump down | Mounted both gate valves and support. Gate
valves could not be installed one bolt
|
6x |
52
|
Thu Sep 2 10:41:16 2021 |
CB RSS + DR OG | CARME connected to the CRYRING | Connected CARME to the CRYRING via tube
plus bellows. See attach.
|
|
51
|
Wed Sep 1 17:14:16 2021 |
CB RSS + DR ML | CARME mounted on the CRYRING | Lifted CARME with Al support on the
CRYRING. No issues during transportation.
|
    |
50
|
Wed Sep 1 12:05:28 2021 |
CB RSS | Preparation for CARME on CRYRING YR09 | Mounted additional cross member for motor
support. See attach 1
|
 |
49
|
Tue Aug 31 18:56:35 2021 |
CB | CARME status | (ELOG does not allow more pictures to be added
to previous entry) |
9x |
48
|
Tue Aug 31 18:34:41 2021 |
CB RSS + DR OG | CARME on Al stand | Lifted CARME off the floor and mounted feet
on sides. It was found impossible to put
four bolts for each foot
|
    |
47
|
Tue Aug 31 11:55:11 2021 |
CB RSS | Last preparations for CARME lift | Found strut bolts in the bag with
spherical washers. Mounted the struts and
|
 |
46
|
Tue Aug 31 07:09:54 2021 |
CB RSS (rem) JM | Preparation for mounting | (30 August 2021)
The current state of YR09 is as per attach |
6x |
45
|
Wed Aug 25 07:02:41 2021 |
RSS TD | 25-31 August |
Pirani IE514
mbar mbar
25/8/21
08:00 0.0030 1.86e-8
----------------------------------------------------
26/8/21 09:00 |
19x |
44
|
Wed Aug 18 11:58:49 2021 |
NTD RSS | Misc fittings and fasteners plus gasket inventory | Attachments 1-3 fasteners, fittings found
amongst earlier shipments. I assume that
the STFC DL cleaned items are for the internal |
22x |
43
|
Wed Aug 18 07:07:26 2021 |
RSS TD | 18-24 August |
Pirani IE514
mbar mbar
18/8/21
08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032
3.72e-8
|
25x |
42
|
Fri Aug 13 07:28:37 2021 |
RSS TD | Friday 13-17 August | Pirani IE514
mbar mbar
|
23x |
41
|
Thu Aug 12 09:16:42 2021 |
TD RSS | Thursday 12 August |
Attachment 1 - IE414/514 feedthrough wiring
diagram
|
13x |
40
|
Wed Aug 11 12:30:40 2021 |
TD RSS | Wednesday 11 August |
Attachments 1 & 2 - 2x SAES D-2000 re-fitted
to side ports
|
8x |
39
|
Tue Aug 10 12:22:56 2021 |
TD RSS | Tuesday 10 August |
Attachments 1-3 - 2 of 4 SAES D2000 installed
at same ports used for STFC DL XHV tests |
  |
38
|
Mon Aug 9 12:36:00 2021 |
TD, RSS, ABD | Monday 9 August |
Attachments 1-5 - CARME shipment in CRYRING
hall
|
7x |
37
|
Mon Dec 7 14:29:12 2020 |
JM | CARME packing up | |
  |
36
|
Fri Dec 4 16:49:36 2020 |
TD | Friday 4 December | |
7x |
35
|
Wed Nov 25 10:39:37 2020 |
TD | Wednesday 25 November |
10.39
|