471
|
Tue Jan 16 16:01:48 2024 |
TD | Change CARMEraspberrypi to nnrpi1 |
Change RPi from CARMEraspberrypi to nnrpi1
to provide carme-gsi access to Rly16 to control |
|
|
33
|
Tue Nov 10 12:25:29 2020 |
JM | Cable harnesses | The length of the wire needed was estimated
with the aid of a scale image of the detectors
in the CARME chamber and foam model pieces. |
   |
|
635
|
Sat Jun 15 00:46:45 2024 |
TD | CRYRING hall temperature transient | CRYRING hall temperature transient - evening
of Friday 14 June
|
|
|
150
|
Wed Nov 10 18:38:16 2021 |
RSS TD + ML OG AK NK | CARME wrapped in heating tape | Heating and electronic experts were in
CRYRING and were unhappy with the damaged
wire. Heaters were opened by OG, but no damage |
    |
|
388
|
Tue Apr 25 13:22:19 2023 |
JM | CARME venting | CARME venting using nitrogen gas bottle.
Coolant pipes dismounted from the
chamber |
 |
|
69
|
Thu Sep 16 15:24:29 2021 |
JM RSS | CARME vented + thermocouple feedthrough | Chamber has been vented back to atmosphere.
Motor was able to be pulled back
to insert bloacking pin once at atmosphere. |
  |
|
412
|
Mon Jun 26 14:49:05 2023 |
JM, TD | CARME vented | 26/06/23
This morning the pressure was 4e-7
mbar. The bolts on the windows and the large |
|
|
61
|
Tue Sep 7 12:40:43 2021 |
CB ML + RH | CARME survey preparation | Rudi and survey group representative came
to CARME.
|
|
|
49
|
Tue Aug 31 18:56:35 2021 |
CB | CARME status | (ELOG does not allow more pictures to be added
to previous entry) |
9x |
|
658
|
Wed Jun 19 12:11:22 2024 |
CB, RSS | CARME status | DSSD off
FEEs off
Motors out, pin inserted, compressed |
|
|
761
|
Wed Jul 9 11:21:14 2025 |
EW, CB | CARME restarted - long background R98 | ---9 July---
11:00
Turned detectors on - all stable |
32x |
|
685
|
Tue May 20 19:38:36 2025 |
JM | CARME restart | 19:00
Arrived at GSI.
We have 6Li1+ beam in the ring |
6x |
|
74
|
Wed Sep 22 08:30:08 2021 |
CB (remotely) | CARME pressure during first XHV test | CARME pressure moved to
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
|
|
|
32
|
Thu Oct 29 08:02:29 2020 |
CB, JM (remotely) | CARME pressure | Attached is the temperature plot for bakeout
period including tags for NEG activation
etc.
|
  |
|
37
|
Mon Dec 7 14:29:12 2020 |
JM | CARME packing up | |
  |
|
369
|
Thu Mar 3 15:14:21 2022 |
JM, OH | CARME packing up | Pulser walkthrough taken for motor position
23.1mm and motor position 67.43mm.
Points taken at 30,50,70,90,110,130,150,170,190,210,230 |
|
|
118
|
Tue Oct 12 13:54:21 2021 |
RSS TD + OD DR | CARME opened | With the assistance of Oemer and Davide all
of the M22 bolts removed from the downstream
section of the CARME chamber. To separate |
20x |
|
139
|
Mon Nov 1 14:48:16 2021 |
CB + ML DR | CARME opened | Confirmed leak as per previous Elog.
Tightened to 100 Nm - no effects.
Tightened to 130 Nm - bottom leak |
|
|
391
|
Sat Apr 29 10:12:58 2023 |
CB, JM | CARME opened | (28 April)
Mounted rails on dolly. The rails
don't smoothly connect to those on the |
8x |
|
419
|
Fri Jul 14 08:27:17 2023 |
TD | CARME open - inspecting seal |
09.20 CARME chamber at atmospheric pressure
as expected.
|
|