  471   Tue Jan 16 16:01:48 2024 TDChange CARMEraspberrypi to nnrpi1
Change RPi from CARMEraspberrypi to nnrpi1
to provide carme-gsi access to Rly16 to control
 Capture.PNG 
  33   Tue Nov 10 12:25:29 2020 JMCable harnessesThe length of the wire needed was estimated
with the aid of a scale image of the detectors
in the CARME chamber and foam model pieces.
 20201102_155336.jpgFigure_1.png20201102_154648.jpgPhotos.zip 
  635   Sat Jun 15 00:46:45 2024 TDCRYRING hall temperature transientCRYRING hall temperature transient - evening
of Friday 14 June
 Capture.PNG 
  150   Wed Nov 10 18:38:16 2021 RSS TD + ML OG AK NKCARME wrapped in heating tapeHeating and electronic experts were in
CRYRING and were unhappy with the damaged
wire. Heaters were opened by OG, but no damage
 IMG_5514(1).JPGIMG_5517(1).JPGIMG_5518.JPGIMG_5520.JPGIMG_5521(1).JPG 
  388   Tue Apr 25 13:22:19 2023 JMCARME venting CARME venting using nitrogen gas bottle. 

Coolant pipes dismounted from the
chamber
 20230425_134119.jpg20230425_132944.jpg 
  69   Thu Sep 16 15:24:29 2021 JM RSSCARME vented + thermocouple feedthroughChamber has been vented back to atmosphere. 

Motor was able to be pulled back
to insert bloacking pin once at atmosphere.
 1.jpg2.jpg3.jpg 
  412   Mon Jun 26 14:49:05 2023 JM, TDCARME vented26/06/23

This morning the pressure was 4e-7
mbar. The bolts on the windows and the large
  
  61   Tue Sep 7 12:40:43 2021 CB ML + RHCARME survey preparationRudi and survey group representative came

to CARME. 
  
  49   Tue Aug 31 18:56:35 2021 CBCARME status(ELOG does not allow more pictures to be added
to previous entry)
 9x 
  658   Wed Jun 19 12:11:22 2024 CB, RSSCARME statusDSSD off

FEEs off

Motors out, pin inserted, compressed
  
  761   Wed Jul 9 11:21:14 2025 EW, CBCARME restarted - long background R98---9 July---

11:00

Turned detectors on - all stable
 32x 
  685   Tue May 20 19:38:36 2025 JMCARME restart19:00

Arrived at GSI.

We have 6Li1+ beam in the ring
 6x 
  74   Wed Sep 22 08:30:08 2021 CB (remotely)CARME pressure during first XHV testCARME pressure moved to

https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
  
  32   Thu Oct 29 08:02:29 2020 CB, JM (remotely)CARME pressureAttached is the temperature plot for bakeout
period including tags for NEG activation
etc.
 20201029_080001.jpgBakeout_pump_down.png20201119_temps.png 
  37   Mon Dec 7 14:29:12 2020 JMCARME packing up   20201207_122353.jpg20201207_113905.jpg20201207_110714.jpg 
  369   Thu Mar 3 15:14:21 2022 JM, OHCARME packing upPulser walkthrough taken for motor position
23.1mm and motor position 67.43mm.

Points taken at 30,50,70,90,110,130,150,170,190,210,230
  
  118   Tue Oct 12 13:54:21 2021 RSS TD + OD DRCARME openedWith the assistance of Oemer and Davide all
of the M22 bolts removed from the downstream
section of the CARME chamber. To separate
 20x 
  139   Mon Nov 1 14:48:16 2021 CB + ML DRCARME openedConfirmed leak as per previous Elog.

Tightened to 100 Nm - no effects.

Tightened to 130 Nm - bottom leak
  
  391   Sat Apr 29 10:12:58 2023 CB, JMCARME opened(28 April)

Mounted rails on dolly. The rails
don't smoothly connect to those on the
 8x 
  419   Fri Jul 14 08:27:17 2023 TDCARME open - inspecting seal
09.20 CARME chamber at atmospheric pressure
as expected.
  