  ID Date Author Subjectdown Text Attachments
  522   Sat Feb 17 13:21:44 2024 JM, CBBeam on target - motors tests14:01

Run 36 started.

We put both detectors to the fully
 Screenshot_from_2024-02-17_14-33-51.pngScreenshot_from_2024-02-17_14-36-27.pngScreenshot_from_2024-02-17_14-39-38.png 
  270   Thu Feb 24 14:31:25 2022 JM, ML, CNBeam Tuning Run 7615:30

1.5 MeV/u beam currently being
tuned
 6x 
  226   Tue Feb 22 04:09:28 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 - first event at 10MeV !05:00

Beam ON ~2E6 pps, still fluctates
between 2e6 and 6e6 (like a step function)
 11x 
  228   Tue Feb 22 05:47:18 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 - 2 events at 10MeV!06:47

Beam ON ~2.0E6 pps, still fluctates
between 1e6 and 6e6 (like a step function)
 11x 
  223   Tue Feb 22 00:32:35 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 01:30

Beam ON ~6E6 pps

Target ON and open to the ring
 2022-02-22_01-38-53-Ex-histogram.png2022-02-22_01-38-17-XYtotal.png 
  224   Tue Feb 22 02:02:11 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 03:00

Beam ON ~7E6 pps

Target ON and open to the ring
 10x 
  225   Tue Feb 22 03:05:06 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 04:00

Beam ON ~5.5E6 pps, but it fluctates
between 2e6 and 6e6 (like a step function)
 9x 
  227   Tue Feb 22 05:12:38 2022 JM, CB, LV, PM, AKBeam ON, Target ON Run 54 06:00

Beam ON ~1.5E6 pps, still fluctates
between 1e6 and 6e6 (like a step function)
 11x 
  219   Mon Feb 21 17:26:19 2022 JM, CB, SHB, OH (remotely)Beam ON run 5321/2/22 16:00

Call from main control room, beam
is ON, probably has been for several hours
 9x 
  213   Sat Feb 19 20:08:43 2022 JM, CBBeam ON run 49Run started 19/2/22 21:05. Beam ON

Temperatures OK

System wide checks OK - white rabbit
 6x 
  359   Tue Mar 1 23:43:15 2022 David, GeorgeBeam Intensity Drop00:38
Intensity in the ring dropped by 2
orders of magnitude to 5e5 on injection
  
  610   Mon Jun 10 07:40:47 2024 RSS, DBBeam08:26: There is no beam and Gleb is informed.

08:46: Beam is back.
  
  167   Mon Jan 10 20:52:53 2022 JM, TD, OHBaking tent removed, VI testsBaking tent, frame and trays fully
removed from CARME chamber. Removal of baking
frame required removing air lines from upper
 20220110_175547.jpg20220110_175811.jpgvi-curve.png 
  424   Fri Jul 21 08:21:54 2023 TD, RSSBaking tent manual09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar

      Today - install TCs, connect to Pico
 CARME-baking-guide_(1).pdf 
  431   Thu Aug 10 07:51:43 2023 JMBaking tent and heater testing09/08/23

Attached is the current pumpdown
plot taken from grafana. 
 8x 
  13   Wed Sep 16 08:52:03 2020 CB (remotely)Baking status 16-17 September16 September

08:50
 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png 
  11   Mon Sep 14 12:07:40 2020 JM, CB (remotely)Baking statusMon 14 Sep 09:50

Jordan moved the TC08 picolog 2 away from
 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png 
  16   Fri Sep 18 10:28:57 2020 JM, CB(remotely)Baking status10:28
Reducing temperature in steps. System cooling
down. See attached.
 20200918_1029_temps.png 
  22   Sat Sep 26 09:31:46 2020 JM, CB (both remotely)Baking over weekendSat 26 Sep

09:15 Baking started automatic
mode
 temps.pngtemps2.pngHeaters.jpg20200927_1732_temps.png 
  10   Sun Sep 13 08:06:25 2020 CB (remotely)Baking over the weekend -2Sun 13 Sep 08:06

Baking reached 93 C yesterday afternoon at
 20201309_0806_ctrl.png20201309_0806_plot.png 