Entry  Sat Jan 13 14:25:05 2024, CB, JM, Bias tests with all FEEs connected Screenshot_2024-01-13_15-24-40.png20240113_150158.jpg
Connected all FEEs.

The two top fees corresponding to the bottom right detector are connected to damaged flexi rigid PCBs. The top one is missing an pin that should
not be connected to anything, while the bottom one has a slightly cracked connector and is missing the top left pin. Spares should be in Edinburgh.
Entry  Sat Jan 13 14:32:21 2024, CB, JM, Leaky manifold and cable management 20240112_111838.jpg20240112_105936.jpg20240113_183019.jpg
Found two leaks in the welding of the manifolds, marked them in tape. Manifold to be repaired on Monday. Remember to re-install missing hoses, which
are  in a bucket in the cave.

See attached how it is supposed to look like.
Entry  Wed Feb 7 10:09:14 2024, CB, JG, EM, Morning Shift  Screenshot_from_2024-02-07_11-10-08.pngScreenshot_from_2024-02-07_11-10-59.pngScreenshot_from_2024-02-07_11-15-53.pngScreenshot_from_2024-02-07_11-20-38.png
11:00

Changed slow comp threshold to 0x32 (500 keV). Checkloaded.

 
Entry  Fri May 31 19:12:01 2024, CB, EM, Run 13 - test with beam Screenshot_from_2024-05-31_20-13-46.pngScreenshot_from_2024-05-31_20-27-58.pngScreenshot_from_2024-05-31_20-32-59.png
20:00

The beam is set at the correct energy, operators cross-checked it again. What we see  at 750 is due to the molecular beam.  The operotors
are trying to optimize and get rid of this in the next 30min.
Entry  Fri May 31 21:03:21 2024, CB, EM, Run14 Screenshot_from_2024-05-31_22-05-57.pngScreenshot_from_2024-05-31_22-07-01.pngScreenshot_from_2024-05-31_22-07-49.png
22:03

Before this run we checked quickly  beam with the target on but it does not make sense with the current status of the beam.

We removed target and starte Run14
Entry  Thu Feb 8 17:11:50 2024, CB, EH, Pulser walkthrough 4.png3.png

17:30 File G22-88/R8

Pulser walkthrough

EGG Ortec 448 Pulser

Amplitide 90,000-10,000 @ 10,000 step
Normalise 5.0
Attenuators x5 IN
t_r
100ns
Tau_d 50us
Frequency Int Osc 50Hz
Polarity + ( - polarity via Cooknell SA1 Sum & Invert Amp )



18:10 Moved to new run R9

Pulser off. Overnight background.
Entry  Wed Feb 23 16:57:35 2022, CB, CN, Optimising motor motion 
Optimised motor motion during run R58

Moved 2 mm in (20.3 potentiometer)

29.47 potentiometer
Entry  Fri Jun 6 16:49:59 2025, CB, AY, ST, Beam overlap results for 200keV and 250keV 2025_06_06_17_46_56_Greenshot.png
For 200keV the optimal horizontal position is -5mm.
For 250keV the optimal horizontal position is -2mm.

Both values are already given to the operators, so tomorrow we can just switch to 200keV and go on :)
Entry  Mon Jun 16 22:06:00 2025, CB, AR, EW, RUN 90-91 14x
23:00 DAQ restored and data now being written okay. Checks all okay, see screenshots below. Histograms reset. 40 bars in bottle @ 23:45 - should last
30 hours.

12:00 Checks all ok. No problems with aidas or writing to disk.
Entry  Sun Jun 2 06:41:00 2024, CB, AG, Run 21 - tests 10x
07:41

Switching to bunched beam to check D vs H content.

8:24
Entry  Sun Jun 2 08:47:01 2024, CB, AG, Run 22 - longer rung with 20 min storage Screenshot_from_2024-06-02_09-47-53.pngScreenshot_from_2024-06-02_09-48-06.pngScreenshot_from_2024-06-02_11-21-59.pngScreenshot_from_2024-06-02_11-22-27.pngScreenshot_from_2024-06-02_13-02-31.png
09:47

12 seconds pre acc

200x cycles
Entry  Sat Jun 1 07:16:15 2024, CB, AB, EM, JM, Run 19 - beam target overlap 19x
Morning shift

08:16 - as run 18, target off

9:00 Increased storage time to 5 minutes. Aquired data after initial beam loss. Attach 1 &2. Far less H2+ vs D.
Entry  Sat Feb 3 00:13:03 2024, CB TD, Run1 end - R3 start 50x

01.07 DAQ continues file G22-88/R1_46
      background alpha
Entry  Sun Feb 4 08:40:04 2024, CB TD, Run3 - contd 22x
09.30 DAQ continues file G22-88/R3_17

      DSSSD bias OK - attachment 1
Entry  Mon Feb 5 05:45:26 2024, CB TD, Run3 - end 47x
06.40 DAQ continues file G22-88/R3_42

      DSSSD bias OK - attachment 1
Entry  Mon Feb 5 12:48:50 2024, CB TD, Pulser walkthough - Run4 Screenshot_from_2024-02-05_14-04-33.pngScreenshot_from_2024-02-05_14-05-16.png

13.41 DAQ start - file G22-88/R4
Entry  Thu Sep 2 21:04:26 2021, CB RSS ML + DR OG, Gate valves mounted + pump down 6x
Mounted both gate valves and support. Gate 
valves could not be installed one bolt 
rotated from 90 degrees as per drawings 
Entry  Fri Sep 10 10:50:55 2021, CB RSS ML, Pressure after overnight pump down 20210910_101131.jpg
Pressure found in 10-7 mbar range.

Decided to leak test anyway for safety.
Entry  Fri Sep 10 18:09:14 2021, CB RSS ML, Leak test + baking system test 
Leak tested CARME via He leak tester + He 
bottle. No leaks could be found. Some 
indication of potential leak close to 
Entry  Wed Sep 8 17:03:07 2021, CB RSS + OG NB, Six feedthrough flanges mounted 23x
Continued to mount flanges as per previous ELOG entry.
Peter also remarked that the wires look a bit loose inside the holes, although this is how they were during
dirty tests in Edinburgh.