AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 32 of 34  ELOG logo
Entry  Sat Sep 12 08:38:52 2020, CB (remotely), Baking over the weekend 20200912_0839_ctrl.png20200912_0839_plot.png
Entry  Sun Sep 13 08:06:25 2020, CB (remotely), Baking over the weekend -2 20201309_0806_ctrl.png20201309_0806_plot.png
Entry  Wed Sep 16 08:52:03 2020, CB (remotely), Baking status 16-17 September 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png
Entry  Wed Sep 30 08:10:36 2020, CB (remotely), First bake of CARME with pumps 19x
Entry  Thu Oct 22 22:15:00 2020, CB (remotely), Cooling down after first NEG activation 7x
Entry  Sun Sep 19 09:11:34 2021, CB (remotely), Baking RasPi status 
Entry  Wed Sep 22 08:30:08 2021, CB (remotely), CARME pressure during first XHV test 
Entry  Thu Sep 23 14:19:27 2021, CB (remotely), Checking baking remotely - instructions Temp.png
Entry  Fri Sep 24 15:36:34 2021, CB (remotely), CARME baking status Temp.pngTemps.png
Entry  Sat Sep 25 07:23:06 2021, CB (remotely), CARME baking status -2 temp_plot.pngtemps.png
Entry  Sat Sep 25 19:01:50 2021, CB (remotely), CARME baking status -3 Temps.PNG
Entry  Sun Sep 26 07:41:00 2021, CB (remotely), CARME baking status -4 Temps.pngScreen.png
Entry  Mon Sep 27 11:09:48 2021, CB (remotely), Temperature vs Pressure plot Temps.pdf
Entry  Mon Sep 27 21:33:50 2021, CB (remotely), CARME baking status -7 Temps.pngScreen.png
Entry  Fri Oct 1 21:47:51 2021, CB (remotely), CARME baking status -16 screen.pngTemps.png
Entry  Sun Nov 28 15:57:45 2021, CB (remotely), Nov 2021 temperatures 211128164424_temperatures.zip
Entry  Tue Dec 7 09:39:59 2021, CB (remotely), Gate valves closed 
Entry  Thu Apr 10 07:02:12 2025, CB (remotely), Current logging enabled - sort of 
Entry  Tue Aug 31 18:56:35 2021, CB, CARME status 9x
Entry  Sat Oct 9 09:47:33 2021, CB, To do list for next week Capture.PNG
ELOG V3.1.4-unknown