Entry  Sun Jul 6 11:35:28 2025, CB, Anydesk version updated 
Updated anydesk to 6.3.2 CentOS7 release.

Works now.
Entry  Thu Jul 17 07:07:56 2025, CB, CARME off Capture.PNG2.PNG3.PNGCapture.PNG
08:07 CEST

Temperatures ok - attached

DSSDs on. Leakage currents still high. - attached
Entry  Tue Jun 4 18:08:04 2024, Boudefla Dounia - CB - LB - SD, Run 34 19x
19:08

Beam energy = 3 MeV.

Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Entry  Tue Jun 4 15:25:36 2024, BD US CB, Run 33 Screenshot_from_2024-06-04_18-33-23.pngScreenshot_from_2024-06-04_18-33-38.pngScreenshot_from_2024-06-04_18-35-26.pngScreenshot_from_2024-06-04_18-36-55.png
16:26

Merger OK, Tape server OK

ADC data item statistics looks as before. OK
Entry  Fri Jun 6 17:27:03 2025, AY, ST, JM, EM, DB, Run 53 11x
Run 53 started at 18:25 (started already earlier but since then data is taken). Everything is running again. We started at 3E12 at/cm2.
Side comment: Gleb told us 1h ago that he will switch to coasted mode and call us back as soon as he is done. So far he didn't call back and
he is not in the office... So we decided to start data taking already. But: the software says that coasting mode is already on, but the graph looks like
Entry  Sun Feb 18 13:58:33 2024, AR, OF, JM, Run 42 - cooled beam on target 27x
Run 42 - 15:00

Detectors IN (left arm pot =36.54 mm, right arm pot = 70.49 mm). Stationary. Same as run 40

Electron cooler voltage 751.89 V this corresponds to 1.3444 MeV/u. This should be on the right of the peak of the resonance.
Entry  Fri Feb 9 07:57:38 2024, AR, CB, AB, JM, Run10 - First cool beam on target 27x
8:58

System wide checks okay, except

   
Entry  Mon Nov 28 13:14:33 2022, AR TD, Monday 28 November 12x
 
Entry  Wed Nov 30 08:52:59 2022, AR TD, Wednesday 30 November 26x
9:40

DSSD bias and leakage current values:

-99.99 V
Entry  Thu Dec 1 08:56:59 2022, AR TD, Thursday 1 December  11x
Photos of noise observed at each of the AIDA PSU outputs by digital oscillscope.

DAQ GOing with waveforms enabled.

Connection from AIDA PSU to scope by DMM test probes, twisted cabling, 3mm jack plug/BNC adaptor.
Entry  Sat Feb 10 10:00:44 2024, AR RSS JM CB, Run 13, 14 23x
System checks: all ok

Attatchment 1: Rates ok

Attatchment 2: Temperatures ok
    Reply  Thu Nov 11 14:01:00 2021, AK, ML, Heater channel layouts 2020.11.05_Cryring-YR09-baking-layout.pdf
Schematic layout of heaters and channel assignment attached. Table kindly provided by AK. I hope the conversion from excel to pdf didn't swallow
any important information.
Entry  Tue Oct 12 13:54:21 2021, RSS TD + OD DR, CARME opened 20x
With the assistance of Oemer and Davide all of the M22 bolts removed from the downstream section of the CARME chamber. To separate the downstream section
from the 
upstream sections it was necessary to use a lever between M10 bolts screwed into the lift points of adjacent sections of the CARME. The upstream sections
Entry  Thu Jun 13 21:07:30 2024, LCS, US, Run 67- beam on target 7x
22:05

The energy is changed to 247.4 V.

Read back value is 246.849 V.
Entry  Sat May 24 18:27:55 2025, EM, LC, Background runs continued R17-R19 36x
Summary: Target not running. Background runs written to disk, some with beam some without.

19:27 Data file R17  running

      DSSSD positions out. Nikos will work on the target.
Entry  Tue Nov 29 14:37:56 2022, AR TD, Tuesday 29 November 22x
16:20

DSSD bias and leakage current values:

-99.99 V