AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 38 of 38  ELOG logo
ID Date Authordown Subject Text Attachments
  760   Sun Jul 6 11:35:28 2025 CBAnydesk version updatedUpdated anydesk to 6.3.2 CentOS7 release.

Works now.
  
  762   Thu Jul 17 07:07:56 2025 CBCARME off08:07 CEST

Temperatures ok - attached

DSSDs on. Leakage currents still
 Capture.PNG2.PNG3.PNGCapture.PNG 
  588   Tue Jun 4 18:08:04 2024 Boudefla Dounia - CB - LB - SDRun 3419:08

Beam energy = 3 MeV.

Horizontal beam position = 4.0
 19x 
  587   Tue Jun 4 15:25:36 2024 BD US CBRun 3316:26

Merger OK, Tape server OK

ADC data item statistics looks
 Screenshot_from_2024-06-04_18-33-23.pngScreenshot_from_2024-06-04_18-33-38.pngScreenshot_from_2024-06-04_18-35-26.pngScreenshot_from_2024-06-04_18-36-55.png 
  723   Fri Jun 6 17:27:03 2025 AY, ST, JM, EM, DBRun 53Run 53 started at 18:25 (started already
earlier but since then data is taken). Everything
is running again. We started at 3E12 at/cm2.
 11x 
  527   Sun Feb 18 13:58:33 2024 AR, OF, JMRun 42 - cooled beam on targetRun 42 - 15:00

Detectors IN (left arm pot =36.54
mm, right arm pot = 70.49 mm). Stationary.
 27x 
  501   Fri Feb 9 07:57:38 2024 AR, CB, AB, JMRun10 - First cool beam on target8:58

System wide checks okay, except

   
 27x 
  380   Mon Nov 28 13:14:33 2022 AR TDMonday 28 November   12x 
  382   Wed Nov 30 08:52:59 2022 AR TDWednesday 30 November9:40

DSSD bias and leakage current values:

-99.99 V
 26x 
  383   Thu Dec 1 08:56:59 2022 AR TDThursday 1 December Photos of noise observed at each of the
AIDA PSU outputs by digital oscillscope.

DAQ GOing with waveforms enabled.
 11x 
  504   Sat Feb 10 10:00:44 2024 AR RSS JM CBRun 13, 14System checks: all ok

Attatchment 1: Rates ok

Attatchment 2: Temperatures ok
 23x 
  153   Thu Nov 11 14:01:00 2021 AK, MLHeater channel layoutsSchematic layout of heaters and channel
assignment attached. Table kindly provided
by AK. I hope the conversion from excel to
 2020.11.05_Cryring-YR09-baking-layout.pdf 
  118   Tue Oct 12 13:54:21 2021 RSS TD + OD DRCARME openedWith the assistance of Oemer and Davide all
of the M22 bolts removed from the downstream
section of the CARME chamber. To separate
 20x 
  626   Thu Jun 13 21:07:30 2024 LCS, USRun 67- beam on target22:05

The energy is changed to 247.4
V.
 7x 
  690   Sat May 24 18:27:55 2025 EM, LCBackground runs continued R17-R19Summary: Target not running. Background
runs written to disk, some with beam some
without.
 36x 
  381   Tue Nov 29 14:37:56 2022 AR TDTuesday 29 November16:20

DSSD bias and leakage current values:

-99.99 V
 22x 
ELOG V3.1.4-unknown