ID |
Date |
Author |
Subject |
Text |
 |
760
|
Sun Jul 6 11:35:28 2025 |
CB | Anydesk version updated | Updated anydesk to 6.3.2 CentOS7 release.
Works now. |
|
762
|
Thu Jul 17 07:07:56 2025 |
CB | CARME off | 08:07 CEST
Temperatures ok - attached
DSSDs on. Leakage currents still |
   |
588
|
Tue Jun 4 18:08:04 2024 |
Boudefla Dounia - CB - LB - SD | Run 34 | 19:08
Beam energy = 3 MeV.
Horizontal beam position = 4.0 |
19x |
587
|
Tue Jun 4 15:25:36 2024 |
BD US CB | Run 33 | 16:26
Merger OK, Tape server OK
ADC data item statistics looks |
   |
723
|
Fri Jun 6 17:27:03 2025 |
AY, ST, JM, EM, DB | Run 53 | Run 53 started at 18:25 (started already
earlier but since then data is taken). Everything
is running again. We started at 3E12 at/cm2. |
11x |
527
|
Sun Feb 18 13:58:33 2024 |
AR, OF, JM | Run 42 - cooled beam on target | Run 42 - 15:00
Detectors IN (left arm pot =36.54
mm, right arm pot = 70.49 mm). Stationary. |
27x |
501
|
Fri Feb 9 07:57:38 2024 |
AR, CB, AB, JM | Run10 - First cool beam on target | 8:58
System wide checks okay, except
|
27x |
380
|
Mon Nov 28 13:14:33 2022 |
AR TD | Monday 28 November | |
12x |
382
|
Wed Nov 30 08:52:59 2022 |
AR TD | Wednesday 30 November | 9:40
DSSD bias and leakage current values:
-99.99 V |
26x |
383
|
Thu Dec 1 08:56:59 2022 |
AR TD | Thursday 1 December | Photos of noise observed at each of the
AIDA PSU outputs by digital oscillscope.
DAQ GOing with waveforms enabled. |
11x |
504
|
Sat Feb 10 10:00:44 2024 |
AR RSS JM CB | Run 13, 14 | System checks: all ok
Attatchment 1: Rates ok
Attatchment 2: Temperatures ok |
23x |
153
|
Thu Nov 11 14:01:00 2021 |
AK, ML | Heater channel layouts | Schematic layout of heaters and channel
assignment attached. Table kindly provided
by AK. I hope the conversion from excel to |
|
118
|
Tue Oct 12 13:54:21 2021 |
RSS TD + OD DR | CARME opened | With the assistance of Oemer and Davide all
of the M22 bolts removed from the downstream
section of the CARME chamber. To separate |
20x |
626
|
Thu Jun 13 21:07:30 2024 |
LCS, US | Run 67- beam on target | 22:05
The energy is changed to 247.4
V. |
7x |
690
|
Sat May 24 18:27:55 2025 |
EM, LC | Background runs continued R17-R19 | Summary: Target not running. Background
runs written to disk, some with beam some
without. |
36x |
381
|
Tue Nov 29 14:37:56 2022 |
AR TD | Tuesday 29 November | 16:20
DSSD bias and leakage current values:
-99.99 V |
22x |