AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 3 of 34  ELOG logo
ID Date Author Subject Text Attachments
  627   Thu Jun 13 23:01:07 2024 RSS, JS, EHRun 67 - Night shiftRun 67

00:01


      DSSSD bias & leakage
 20x 
  626   Thu Jun 13 21:07:30 2024 LCS, USRun 67- beam on target22:05

The energy is changed to 247.4
V.
 7x 
  625   Thu Jun 13 14:46:17 2024 TDR66 beam overlap test
15.45 Start data file G22-201/R66 
      Beam/target overlap test
  
  624   Thu Jun 13 09:48:25 2024 TD, LCSRun 65 - beam on target10:47

The energy is changed to 247.4
V.
 14x 
  623   Thu Jun 13 06:21:53 2024 TD, LCSRun 64 - contd07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2

07.24 DSSSD bias & leakage current OK - attachment
 13x 
  622   Thu Jun 13 00:50:33 2024 JM, JSRun 64 - beam on target01:50

Right arm at 64.60 mm

Left arm IN at 36.54 mm
  
  621   Wed Jun 12 07:16:47 2024 RSS, YL, JM, TD, CBStatus07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given
 6x 
  620   Tue Jun 11 21:16:50 2024 TDRun 63 continuedRun 63 continued

22.06 DSSSD bias & leakage current OK - attachment
 17x 
  619   Tue Jun 11 20:10:25 2024 JMRun 63 - Beam only background21:00

Claude has achieved optimal cooling
parameters for the beam
  
  618   Tue Jun 11 19:44:48 2024 OF, SSTarget out and at HeTarget has been moved out and H2 switched
off. Changed to He.

Nikos will repair nozzle tomorrow
  
  617   Tue Jun 11 12:26:07 2024 RSS, JS, JM, CBRun 62 - Beam optimization + Target changeBeam optimization and target change   
  616   Tue Jun 11 08:34:50 2024 JM, RSS, JSRun 61 - beam on targetNew run 61

Right arm at 64.60 mm

Left arm IN at 36.54 mm
 Screenshot_from_2024-06-11_11-47-57.pngScreenshot_from_2024-06-11_11-48-20.pngScreenshot_from_2024-06-11_11-48-32.pngScreenshot_from_2024-06-11_11-48-44.png 
  615   Tue Jun 11 04:36:17 2024 CB, RSS, JSRun 60 - as 59, left servo in05:36

Run started.

Conditions as before, except left
 11x 
  614   Mon Jun 10 20:31:12 2024 JM, AK, EH, CBRun 59 Beam on target21:32

New run 59

Right arm at 64.60 mm
 18x 
  613   Mon Jun 10 18:22:47 2024 JMElectron cooler calculationsIon beam energy is calculated using Beamcalc
(https://web-docs.gsi.de/~lestinsk/beamcalc/electron.php)

Electron current is set to 4.3
 space-charge-2.pngspace-charge-1.pngBeamCalc.png 
  612   Mon Jun 10 14:26:52 2024 EH, AKRun 5815:30

Merger OK, Tape server OK

ADC data item statistics OK
 8x 
  611   Mon Jun 10 12:49:56 2024 RSS, DB, CB, JM R58 Space Charge Test
13:53

      DSSSD bias & leakage
current OK - attachment 1

      FEE64
temperatures OK - attachment 2

      ADC
 Screenshot_from_2024-06-10_13-52-45.pngScreenshot_from_2024-06-10_13-53-04.pngScreenshot_from_2024-06-10_13-53-17.pngScreenshot_from_2024-06-10_13-53-28.png 
  610   Mon Jun 10 07:40:47 2024 RSS, DBBeam08:26: There is no beam and Gleb is informed.

08:46: Beam is back.
  
  609   Mon Jun 10 05:24:49 2024 TD, RSS, DBR5706:45 New data file G22-201/R57

      Right arm at 64.60 mm
 16x 
  608   Sun Jun 9 22:14:23 2024 TD, PM, AGRun 56 - Data taking23:15 New run 56 with

      Right arm at 64.60 mm
 31x 
ELOG V3.1.4-unknown