AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 3 of 34  ELOG logo
  ID Date Author Subject Text Attachments
  633   Fri Jun 14 19:59:14 2024 US, LC, CBNew run with name of 72 is started due to target issue21:00

Target is lost. Background run
is being collected.
 Screenshot_from_2024-06-14_21-08-22.pngScreenshot_from_2024-06-14_21-08-22.png 
  632   Fri Jun 14 14:52:02 2024 JMBeam-Target Overlap ScanThe orbit of the beam in the ring was re-configured
so that the beam position is more central.

With the target density at ~6e11
 20240614_153532.jpgBeam-overlap-updated.png 
  631   Fri Jun 14 14:48:02 2024 CB NP ML[How To] Change target pressure. EMERGENCY ONLY!ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo
is below 820 Hz, pressure in E1 is above
2.5E-1 mbar and experts (Nikos, Andreas)
 20240614_142435.jpg20240614_142440.jpg 
  630   Fri Jun 14 14:46:54 2024 LC, JM, CB, TD, USRun 71 - beam on target 15:45

New run 71 - beam on target with
definite target overlap [coasting]
 Screenshot_from_2024-06-14_16-35-44.pngScreenshot_from_2024-06-14_16-36-06.pngScreenshot_from_2024-06-14_16-36-28.pngScreenshot_from_2024-06-14_19-49-02.png 
  629   Fri Jun 14 13:45:21 2024 JM, JS, CB, TD, EHRun 70 - beam on target14:45

New run 70 - beam on target with
definite target overlap
 7x 
  628   Fri Jun 14 10:21:24 2024 JS, TDRun 68Frank has been tuning the beam since 08:00

detectors moved fully out

11:20
 9x 
  627   Thu Jun 13 23:01:07 2024 RSS, JS, EHRun 67 - Night shiftRun 67

00:01


      DSSSD bias & leakage
 20x 
  626   Thu Jun 13 21:07:30 2024 LCS, USRun 67- beam on target22:05

The energy is changed to 247.4
V.
 7x 
  625   Thu Jun 13 14:46:17 2024 TDR66 beam overlap test
15.45 Start data file G22-201/R66 
      Beam/target overlap test
  
  624   Thu Jun 13 09:48:25 2024 TD, LCSRun 65 - beam on target10:47

The energy is changed to 247.4
V.
 14x 
  623   Thu Jun 13 06:21:53 2024 TD, LCSRun 64 - contd07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2

07.24 DSSSD bias & leakage current OK - attachment
 13x 
  622   Thu Jun 13 00:50:33 2024 JM, JSRun 64 - beam on target01:50

Right arm at 64.60 mm

Left arm IN at 36.54 mm
  
  621   Wed Jun 12 07:16:47 2024 RSS, YL, JM, TD, CBStatus07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given
 6x 
  620   Tue Jun 11 21:16:50 2024 TDRun 63 continuedRun 63 continued

22.06 DSSSD bias & leakage current OK - attachment
 17x 
  619   Tue Jun 11 20:10:25 2024 JMRun 63 - Beam only background21:00

Claude has achieved optimal cooling
parameters for the beam
  
  618   Tue Jun 11 19:44:48 2024 OF, SSTarget out and at HeTarget has been moved out and H2 switched
off. Changed to He.

Nikos will repair nozzle tomorrow
  
  617   Tue Jun 11 12:26:07 2024 RSS, JS, JM, CBRun 62 - Beam optimization + Target changeBeam optimization and target change   
  616   Tue Jun 11 08:34:50 2024 JM, RSS, JSRun 61 - beam on targetNew run 61

Right arm at 64.60 mm

Left arm IN at 36.54 mm
 Screenshot_from_2024-06-11_11-47-57.pngScreenshot_from_2024-06-11_11-48-20.pngScreenshot_from_2024-06-11_11-48-32.pngScreenshot_from_2024-06-11_11-48-44.png 
  615   Tue Jun 11 04:36:17 2024 CB, RSS, JSRun 60 - as 59, left servo in05:36

Run started.

Conditions as before, except left
 11x 
  614   Mon Jun 10 20:31:12 2024 JM, AK, EH, CBRun 59 Beam on target21:32

New run 59

Right arm at 64.60 mm
 18x 
ELOG V3.1.4-unknown