|
ID |
Date |
Author |
Subject |
Text |
 |
|
633
|
Fri Jun 14 19:59:14 2024 |
US, LC, CB | New run with name of 72 is started due to target issue | 21:00
Target is lost. Background run
is being collected. |
 |
|
632
|
Fri Jun 14 14:52:02 2024 |
JM | Beam-Target Overlap Scan | The orbit of the beam in the ring was re-configured
so that the beam position is more central.
With the target density at ~6e11 |
 |
|
631
|
Fri Jun 14 14:48:02 2024 |
CB NP ML | [How To] Change target pressure. EMERGENCY ONLY! | ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo
is below 820 Hz, pressure in E1 is above
2.5E-1 mbar and experts (Nikos, Andreas) |
 |
|
630
|
Fri Jun 14 14:46:54 2024 |
LC, JM, CB, TD, US | Run 71 - beam on target | 15:45
New run 71 - beam on target with
definite target overlap [coasting] |
   |
|
629
|
Fri Jun 14 13:45:21 2024 |
JM, JS, CB, TD, EH | Run 70 - beam on target | 14:45
New run 70 - beam on target with
definite target overlap |
7x |
|
628
|
Fri Jun 14 10:21:24 2024 |
JS, TD | Run 68 | Frank has been tuning the beam since 08:00
detectors moved fully out
11:20 |
9x |
|
627
|
Thu Jun 13 23:01:07 2024 |
RSS, JS, EH | Run 67 - Night shift | Run 67
00:01
DSSSD bias & leakage |
20x |
|
626
|
Thu Jun 13 21:07:30 2024 |
LCS, US | Run 67- beam on target | 22:05
The energy is changed to 247.4
V. |
7x |
|
625
|
Thu Jun 13 14:46:17 2024 |
TD | R66 beam overlap test |
15.45 Start data file G22-201/R66
Beam/target overlap test |
|
|
624
|
Thu Jun 13 09:48:25 2024 |
TD, LCS | Run 65 - beam on target | 10:47
The energy is changed to 247.4
V. |
14x |
|
623
|
Thu Jun 13 06:21:53 2024 |
TD, LCS | Run 64 - contd | 07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment |
13x |
|
622
|
Thu Jun 13 00:50:33 2024 |
JM, JS | Run 64 - beam on target | 01:50
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
|
|
621
|
Wed Jun 12 07:16:47 2024 |
RSS, YL, JM, TD, CB | Status | 07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given |
6x |
|
620
|
Tue Jun 11 21:16:50 2024 |
TD | Run 63 continued | Run 63 continued
22.06 DSSSD bias & leakage current OK - attachment |
17x |
|
619
|
Tue Jun 11 20:10:25 2024 |
JM | Run 63 - Beam only background | 21:00
Claude has achieved optimal cooling
parameters for the beam |
|
|
618
|
Tue Jun 11 19:44:48 2024 |
OF, SS | Target out and at He | Target has been moved out and H2 switched
off. Changed to He.
Nikos will repair nozzle tomorrow |
|
|
617
|
Tue Jun 11 12:26:07 2024 |
RSS, JS, JM, CB | Run 62 - Beam optimization + Target change | Beam optimization and target change |
|
|
616
|
Tue Jun 11 08:34:50 2024 |
JM, RSS, JS | Run 61 - beam on target | New run 61
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
   |
|
615
|
Tue Jun 11 04:36:17 2024 |
CB, RSS, JS | Run 60 - as 59, left servo in | 05:36
Run started.
Conditions as before, except left |
11x |
|
614
|
Mon Jun 10 20:31:12 2024 |
JM, AK, EH, CB | Run 59 Beam on target | 21:32
New run 59
Right arm at 64.60 mm |
18x |
|