Tue Jun 11 21:16:50 2024, TD, Run 63 continued 17x
|
Run 63 continued
22.06 DSSSD bias & leakage current OK - attachment 1
|
Tue Jun 11 20:10:25 2024, JM, Run 63 - Beam only background
|
21:00
Claude has achieved optimal cooling parameters for the beam
No target and internal work inside the cave tomorrow is required |
Tue Jun 11 19:44:48 2024, OF, SS, Target out and at He
|
Target has been moved out and H2 switched off. Changed to He.
Nikos will repair nozzle tomorrow morning. Remote checks until then. |
Tue Jun 11 12:26:07 2024, RSS, JS, JM, CB, Run 62 - Beam optimization + Target change
|
Beam optimization and target change |
Tue Jun 11 08:34:50 2024, JM, RSS, JS, Run 61 - beam on target   
|
New run 61
Right arm at 64.60 mm
Left arm IN at 36.54 mm |
Tue Jun 11 04:36:17 2024, CB, RSS, JS, Run 60 - as 59, left servo in 11x
|
05:36
Run started.
Conditions as before, except left servo now really in. |
Mon Jun 10 20:31:12 2024, JM, AK, EH, CB, Run 59 Beam on target 18x
|
21:32
New run 59
Right arm at 64.60 mm |
Mon Jun 10 18:22:47 2024, JM, Electron cooler calculations  
|
Ion beam energy is calculated using Beamcalc (https://web-docs.gsi.de/~lestinsk/beamcalc/electron.php)
Electron current is set to 4.3 mA and can be taken from Grafana
Alpha factor is 50 |
Mon Jun 10 14:26:52 2024, EH, AK, Run 58 8x
|
15:30
Merger OK, Tape server OK
ADC data item statistics OK |
Mon Jun 10 12:49:56 2024, RSS, DB, CB, JM, R58 Space Charge Test   
|
13:53
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment
3
per FEE64 Rate spectra - attachment 4
Beam intensity - ~ 5.0E7 pps
Target density - off
|
Mon Jun 10 07:40:47 2024, RSS, DB, Beam
|
08:26: There is no beam and Gleb is informed.
08:46: Beam is back. |
Mon Jun 10 05:24:49 2024, TD, RSS, DB, R57 16x
|
06:45 New data file G22-201/R57
Right arm at 64.60 mm
|
Sun Jun 9 22:14:23 2024, TD, PM, AG, Run 56 - Data taking 31x
|
23:15 New run 56 with
Right arm at 64.60 mm
|
Sun Jun 9 13:45:24 2024, CB PMH AG, Run 55 - Data taking 18x
|
14:45
New run 55 with:
Right arm at 64.60 mm |
Sun Jun 9 09:45:27 2024, JM, CB, Beam-Target Overlap
|
Target density this morning had stabalised at 7e11 at/cm2
This is sufficient to test the beam/target overlap using the lifetime of the beam in the ring.
Previous attempt at this method was done at 1.5e11 at/cm2 where lifetime from residual gas and target are essentially the same. |
Sun Jun 9 08:30:49 2024, JM, CB, Run 54 - beam on target 7x
|
09:30
New run 54 with:
Electron cooler setpoint 244.1 V |
Sat Jun 8 20:32:17 2024, LB, JM, Run 52 - beam on target    
|
New run 52 with:
Electron cooler setpoint 244.2 V
Electron cooler read 243.66 V |
Sat Jun 8 17:46:12 2024, TD, [How To] Cycle Left DSSSDs
|
Interactive Motion Program [workspace 6, display 2]
|
Sat Jun 8 14:49:14 2024, TD, R51 - contd 30x
|
15.40 DSSSD bias & leakage current OK - attachments 1-2
log shows variations due to ambient temperature changes in CRYRING hall
|
Sat Jun 8 10:13:52 2024, CB, JM, TD, Run 50/51 - data taking 8x
|
11:13
ML enabled ring signals remotely.
Used FakeMotion.dat (read FakeMotion.dat from InteractiveMotion.x). |