Entry  Tue Jun 11 21:16:50 2024, TD, Run 63 continued 17x
Run 63 continued

22.06 DSSSD bias & leakage current OK - attachment 1
Entry  Tue Jun 11 20:10:25 2024, JM, Run 63 - Beam only background 
21:00

Claude has achieved optimal cooling parameters for the beam

No target and internal work inside the cave tomorrow is required
Entry  Tue Jun 11 19:44:48 2024, OF, SS, Target out and at He 
Target has been moved out and H2 switched off. Changed to He.

Nikos will repair nozzle tomorrow morning. Remote checks until then.
Entry  Tue Jun 11 12:26:07 2024, RSS, JS, JM, CB, Run 62 - Beam optimization + Target change 
Beam optimization and target change
Entry  Tue Jun 11 08:34:50 2024, JM, RSS, JS, Run 61 - beam on target Screenshot_from_2024-06-11_11-47-57.pngScreenshot_from_2024-06-11_11-48-20.pngScreenshot_from_2024-06-11_11-48-32.pngScreenshot_from_2024-06-11_11-48-44.png
New run 61

Right arm at 64.60 mm

Left arm IN at 36.54 mm
Entry  Tue Jun 11 04:36:17 2024, CB, RSS, JS, Run 60 - as 59, left servo in 11x
05:36

Run started.

Conditions as before, except left servo now really in.
Entry  Mon Jun 10 20:31:12 2024, JM, AK, EH, CB, Run 59 Beam on target 18x
21:32

New run 59

Right arm at 64.60 mm
Entry  Mon Jun 10 18:22:47 2024, JM, Electron cooler calculations space-charge-2.pngspace-charge-1.pngBeamCalc.png
Ion beam energy is calculated using Beamcalc (https://web-docs.gsi.de/~lestinsk/beamcalc/electron.php)

Electron current is set to 4.3 mA and can be taken from Grafana

Alpha factor is 50
Entry  Mon Jun 10 14:26:52 2024, EH, AK, Run 58 8x
15:30

Merger OK, Tape server OK

ADC data item statistics OK
Entry  Mon Jun 10 12:49:56 2024, RSS, DB, CB, JM, R58 Space Charge Test Screenshot_from_2024-06-10_13-52-45.pngScreenshot_from_2024-06-10_13-53-04.pngScreenshot_from_2024-06-10_13-53-17.pngScreenshot_from_2024-06-10_13-53-28.png

13:53

      DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

      ADC data item stats - attachment
3

      per FEE64 Rate spectra - attachment 4
      
      Beam intensity - ~ 5.0E7 pps

      Target density - off

         
Entry  Mon Jun 10 07:40:47 2024, RSS, DB, Beam 
08:26: There is no beam and Gleb is informed.

08:46: Beam is back.
Entry  Mon Jun 10 05:24:49 2024, TD, RSS, DB, R57 16x
06:45 New data file G22-201/R57

      Right arm at 64.60 mm
Entry  Sun Jun 9 22:14:23 2024, TD, PM, AG, Run 56 - Data taking 31x
23:15 New run 56 with

      Right arm at 64.60 mm
Entry  Sun Jun 9 13:45:24 2024, CB PMH AG, Run 55 - Data taking 18x
14:45

New run 55 with:

Right arm at 64.60 mm
Entry  Sun Jun 9 09:45:27 2024, JM, CB, Beam-Target Overlap Beam-overlap.png
Target density this morning had stabalised at 7e11 at/cm2

This is sufficient to test the beam/target overlap using the lifetime of the beam in the ring.

Previous attempt at this method was done at 1.5e11 at/cm2 where lifetime from residual gas and target are essentially the same.
Entry  Sun Jun 9 08:30:49 2024, JM, CB, Run 54 - beam on target 7x
09:30

New run 54 with:

Electron cooler setpoint 244.1 V
Entry  Sat Jun 8 20:32:17 2024, LB, JM, Run 52 - beam on target Screenshot_from_2024-06-08_22-56-26.pngScreenshot_from_2024-06-09_00-17-44.pngScreenshot_from_2024-06-09_00-18-46.pngScreenshot_from_2024-06-09_01-50-54.pngScreenshot_from_2024-06-09_01-51-27.png
New run 52 with:

Electron cooler setpoint 244.2 V

Electron cooler read 243.66 V
Entry  Sat Jun 8 17:46:12 2024, TD, [How To] Cycle Left DSSSDs 

Interactive Motion Program [workspace 6, display 2]
Entry  Sat Jun 8 14:49:14 2024, TD, R51 - contd 30x

15.40 DSSSD bias & leakage current OK - attachments 1-2
       log shows variations due to ambient temperature changes in CRYRING hall
Entry  Sat Jun 8 10:13:52 2024, CB, JM, TD, Run 50/51 - data taking 8x
11:13

ML enabled ring signals remotely.

Used FakeMotion.dat (read FakeMotion.dat from InteractiveMotion.x).