AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 3 of 38  ELOG logo
Entry  Sun Apr 6 14:21:53 2025, TD, [How To] Startup CARME 

- water flow/interlock checks
   check water flow to/from inflow/outflow manifolds
Entry  Sat Feb 3 15:05:10 2024, CB, TD, [How To] Restart Anydesk 
1. Check Proxy server is correct

localhost : 8080

incoming connections 7070
Entry  Tue May 27 08:38:29 2025, TD, [How To] Recover DAQ when one FEE64 stops sending data - short(er) version  
1) Select 'No Storage' [workspace 4, display 1, browser tab 'TapeServer']
    If already in 'No Storage' mode please ignore this step
Entry  Tue Jun 4 19:19:26 2024, TD, [How To] Recover DAQ when one FEE64 stops sending data 
1) STOP DAQ [workspace 2, display 1, browser tab 'Run Control']
   all FEE64s should change status from 'going' to 'stopped' *except* whichever FEE64(s) have a problem - typically their status is 'going' or 'error'
Entry  Sat Jun 8 17:46:12 2024, TD, [How To] Cycle Left DSSSDs 

Interactive Motion Program [workspace 6, display 2]
Entry  Fri Jun 14 14:48:02 2024, CB NP ML, [How To] Change target pressure. EMERGENCY ONLY! 20240614_142435.jpg20240614_142440.jpg
ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo is below 820 Hz, pressure in E1 is above 2.5E-1 mbar and experts (Nikos, Andreas) cannot be reached.

 

Go to the red cabinet under the stairs.
Entry  Wed Nov 10 14:41:12 2021, TD RSS + CB (remotely), Wrapping CARME in heating tape 
ML reports that baking of the upstream section (gas jet interaction chamber plus e-target) has commenced - initially to 50 deg C to check thermocouples.
If OK baking 
temperature will be ramped slowly (which I think means c. 10 deg C per h) to limits established for specific components by the e-target.
Entry  Sun Oct 31 07:41:20 2021, CB JM + RSS, Wires plugged in DSSDs  8x
(Wed 27 October)

Started with top-most flange. Attemptedto plug in MACOR lead in DSSD plug in preparation for jacking in. Realised that extender plate thickness
causes plug to be rasied with respect to nominal position, which results in plug non entering straight. Removed extension plate.
Entry  Tue Aug 18 11:26:26 2020, JM, Week ending Friday 14/08/20 Photo.zip
Week ending friday 14/08/20

CARME chamber securely mounted upon aluminium frame and support skis. Neg-ion pumps and right angled flanges installed. Neg pumps installed in
the wall detector section of the chamber. Neg pumps continuity checked and are electically isolated from the chamber. 
Entry  Wed Apr 9 02:40:04 2025, TD, Wednesday 9 April 11x
03.37 DAQ continues
      Data file APR25/R5_8
Entry  Wed Mar 6 10:47:11 2024, JG, TD, Wednesday 6 March - PEXARIA5 WR test temps.PNGstats_1.PNGstats_2.PNGwr_0949.PNG

Courtesy Nik Kurz, JG has installed a PEXARIA5 PCIe card adjacent to CARME - BuTIS single-mode fibre input
and HDMI output to root MACB input for distribution to the other MACBs and FEE64s.
Entry  Wed Nov 30 08:52:59 2022, AR TD, Wednesday 30 November 26x
9:40

DSSD bias and leakage current values:

-99.99 V
Entry  Wed Oct 28 10:41:57 2020, TD, Wednesday 28 October 6x

10.32
Entry  Wed Sep 27 15:56:41 2023, TD, Wednesday 27 September 1000007129.jpg1000007127.jpg1000007128.jpg

16.55 CARME IE514 8.2e-11 mbar
Entry  Wed Nov 25 10:39:37 2020, TD, Wednesday 25 November 7x

10.39
Entry  Wed Apr 24 12:48:35 2024, TD, Wednesday 24 April 21x

      Replace AIDA ASIC mezzanine of aida01
Entry  Wed Sep 23 13:34:32 2020, JM, TD, Wednesday 23 September 20200923_170441.jpg20200923_170455.jpg20200923_170415.jpg20200923_161415.jpg20200923_161402.jpg

Connected Leybold Ionivac IE514 to Leybold Combivac CM52 Vacuum Gauge Controller
Entry  Wed Feb 23 18:58:12 2022, TD CN, Wednesday 23 February 15.00-23.00 shift 6x


Assorted screenshots of the CARME, CRYRING and gas jet target control systems in operation
Entry  Wed Jan 17 19:15:47 2024, TD, Wednesday 17 January 

CAEN N1419ET remote control via carme-gsi and nnrpi1 - see https://elog.ph.ed.ac.uk/CARME/472
Entry  Wed Aug 11 12:30:40 2021, TD RSS, Wednesday 11 August  8x

Attachments 1 & 2 - 2x SAES D-2000 re-fitted to side ports
                    all 4x SAES D-2000 now re-fitted to chamber
ELOG V3.1.4-unknown