  631   Fri Jun 14 14:48:02 2024 CB NP ML[How To] Change target pressure. EMERGENCY ONLY!

ONLY FOLLOW THESE INSTRUCTIONS if E1 turbo is below 820 Hz, pressure in E1 is above 2.5E-1 mbar and experts (Nikos, Andreas) cannot be reached.

 

Go to the red cabinet under the stairs.

Open rightmost door. See first photo. Do not press the button on the handle or the door will lock!

Turn down pressure regulator indicated in second photo by approximately 1 degree. Read regulator to know which way to turn to decrease. No immediate change should be obvious on the pressure regulator.

Check E1 pressure for 5 minutes. If no effect, turn pressure down again until an effect appears.

Attachment 1: 20240614_142435.jpg
20240614_142435.jpg
Attachment 2: 20240614_142440.jpg
20240614_142440.jpg
  147   Wed Nov 10 14:41:12 2021 TD RSS + CB (remotely)Wrapping CARME in heating tape
ML reports that baking of the upstream section (gas jet interaction chamber plus e-target) has commenced - initially to 50 deg C to check thermocouples. If OK baking 
temperature will be ramped slowly (which I think means c. 10 deg C per h) to limits established for specific components by the e-target.

Ragan and Oemer are currently threading a 10m heating tape helically around the CARME chamber.

16.20 ML reports baking of upstream section is proceeding OK - currently ramping to 100 deg C at 10 deg C / h.

16.25 RSS reports that he completed the install of the thermocouples this morning and will update the Elog with specific locations of each thermocuple and TC08 channel 
later today.

16:30 All CARME thermocouples <20 C. No temperature changes. Monitor.x left under screen. Please summon with screen -x and dismiss with CTRL+a d

17:40 One CARME thermocouple at 40C (CARME front)
  135   Sun Oct 31 07:41:20 2021 CB JM + RSSWires plugged in DSSDs

(Wed 27 October)

Started with top-most flange. Attemptedto plug in MACOR lead in DSSD plug in preparation for jacking in. Realised that extender plate thickness causes plug to be rasied with respect to nominal position, which results in plug non entering straight. Removed extension plate.

Plugged MACOR lead in. OK. Inserted M6 jacking bolts and gently turned by hand. No resistance until jacking action starts. Jacked plug in with spanner and even 1/4 turns. Removed bolts. All OK.

Attempted same with bottom-most cable harness. Due to strain from top-most wire harness the plate is now rotated on the rod. Rotated back. Jacked in. Removed bolts. No issues.

MACOR plugs show small gap in rear part. Gap seems due to harness strain and disappears depending on plate orientation. Will check but pins are obviously connected.

 

(Thu 28 October)

Attempted to plug in top-left MACOR lead. Dog leg conflicts with jacking screw! Only solution is to slacken bolt, rotate strut, fasten again with detectors still on plate. Result attached. No clear if design, manufacturing or mounting oversight.

Had to attemping plugging in a few times before jacking bolts went in straight (i.e. no resistance felt). Jacked in both leads. No further issues.

Gap appears less significant in newly plugged leads. probably as a result of lack of rotational freedom.

 

Attachment 1: 20211027_184502.jpg
20211027_184502.jpg
Attachment 2: 20211027_184527.jpg
20211027_184527.jpg
Attachment 3: 20211027_184535.jpg
20211027_184535.jpg
Attachment 4: 20211028_105802.jpg
20211028_105802.jpg
Attachment 5: 20211028_105919.jpg
20211028_105919.jpg
Attachment 6: 20211028_105711.jpg
20211028_105711.jpg
Attachment 7: 20211028_105728.jpg
20211028_105728.jpg
Attachment 8: 20211028_105734.jpg
20211028_105734.jpg
  2   Tue Aug 18 11:26:26 2020 JMWeek ending Friday 14/08/20

Week ending friday 14/08/20

CARME chamber securely mounted upon aluminium frame and support skis. Neg-ion pumps and right angled flanges installed. Neg pumps installed in the wall detector section of the chamber. Neg pumps continuity checked and are electically isolated from the chamber. 

Attachment 1: Photo.zip
  669   Wed Apr 9 02:40:04 2025 TDWednesday 9 April
03.37 DAQ continues
      Data file APR25/R5_8

      DSSSD bias & leakage current - attachment 1
      
      FEE64 temps OK - attachment 2

      ADC data item stats - attachment 3

      Merger & Tape Server - attachment 4-5

10.23 New run 
      Data file APR25/R6
      alpha background - pulser OFF
      all histograms & stats zero'd

      DSSSD bias & leakage current - attachment 6
      
      FEE64 temps OK - attachment 7

      ADC data item stats - attachment 8

      Merger & Tape Server - attachment 9-10

      WR timestamps OK - attachment 11
Attachment 1: Screenshot_from_2025-04-09_03-37-36.png
Screenshot_from_2025-04-09_03-37-36.png
Attachment 2: Screenshot_from_2025-04-09_03-38-05.png
Screenshot_from_2025-04-09_03-38-05.png
Attachment 3: Screenshot_from_2025-04-09_03-38-36.png
Screenshot_from_2025-04-09_03-38-36.png
Attachment 4: Screenshot_from_2025-04-09_03-38-59.png
Screenshot_from_2025-04-09_03-38-59.png
Attachment 5: Screenshot_from_2025-04-09_03-39-18.png
Screenshot_from_2025-04-09_03-39-18.png
Attachment 6: Screenshot_from_2025-04-09_10-24-34.png
Screenshot_from_2025-04-09_10-24-34.png
Attachment 7: Screenshot_from_2025-04-09_10-24-56.png
Screenshot_from_2025-04-09_10-24-56.png
Attachment 8: Screenshot_from_2025-04-09_10-25-49.png
Screenshot_from_2025-04-09_10-25-49.png
Attachment 9: Screenshot_from_2025-04-09_10-26-39.png
Screenshot_from_2025-04-09_10-26-39.png
Attachment 10: Screenshot_from_2025-04-09_10-26-53.png
Screenshot_from_2025-04-09_10-26-53.png
Attachment 11: Screenshot_from_2025-04-09_10-29-58.png
Screenshot_from_2025-04-09_10-29-58.png
  540   Wed Mar 6 10:47:11 2024 JG, TDWednesday 6 March - PEXARIA5 WR test
Courtesy Nik Kurz, JG has installed a PEXARIA5 PCIe card adjacent to CARME - BuTIS single-mode fibre input
and HDMI output to root MACB input for distribution to the other MACBs and FEE64s.

The PEXARIA5 card provides equivalent functionality to the VETAR2 VME module that we have used to date. 

Further information https://www.gsi.de/fileadmin/EE/Module/EXPLODER/pexaria5_14.pdf 

Cooling water ON 

Via Anydesk startup MIDAS and FEE64s

Power ON
DSSSD HV OFF ( not required for WR test )

FEE64 temperatures OK - attachment 1

All system wide checks OK

Info code 4 & 5 stats OK - attachments 2 & 3

10:48:46 WR timestamps OK - attachment 4

         Timestamp (ns) converted to (s) corresponds to 09.49.22 GMT 6.3.24 which appears to be correct

11.00 Power OFF
Attachment 1: temps.PNG
temps.PNG
Attachment 2: stats_1.PNG
stats_1.PNG
Attachment 3: stats_2.PNG
stats_2.PNG
Attachment 4: wr_0949.PNG
wr_0949.PNG
  382   Wed Nov 30 08:52:59 2022 AR TDWednesday 30 November

9:40

DSSD bias and leakage current values:

-99.99 V

-13.0960 uA

Pulsar peak widths (ch FWHM)

aida01 ~ 97

aida02 ~ 103

aida03 ~ 134

aida04 ~ 131

aida05 ~ 22

Pretty similar to what was found yesterday

 

15.30

Per Elog 375

Measured FEE64 voltages are as follows

@ISOL 4 AIDA PSU   @FEE64 aida05      nominal

(top-botttom)               (right-left)

+6.05V                        +5.26V                     +5V

+6.05V                        +5.26V                     +5V

+6.05V                        +5.26V                     +5V

-6.49V                         -6.26V                      -6V

+7.78V                        +7.46V                     +7V

 

Adjusted PowerStax PSU voltage pots of AIDA PSU ISOL 4

@ISOL 4 AIDA PSU   @FEE64 aida05      nominal

(top-botttom)               (right-left)

+5.79V                        +4.99V                     +5V

+5.79V                        +4.99V                     +5V

+5.79V                        +4.99V                     +5V

-6.23V                         -6.00V                      -6V

+7.32V                        +7.00V                     +7V

 

Attatchment 1-12 = BEFORE change

Attatchment 13+ = AFTER change

Pulsar peak widths (ch FWHM) AFTER CHANGE

aida01 ~ 100

aida02 ~ 96

aida03 ~ 130

aida04 ~ 130

aida05 ~ 22

Attachment 1: Screenshot_2022-11-30_at_10.11.36.png
Screenshot_2022-11-30_at_10.11.36.png
Attachment 2: Screenshot_2022-11-30_at_10.11.49.png
Screenshot_2022-11-30_at_10.11.49.png
Attachment 3: Screenshot_2022-11-30_at_10.12.21.png
Screenshot_2022-11-30_at_10.12.21.png
Attachment 4: Screenshot_2022-11-30_at_10.12.30.png
Screenshot_2022-11-30_at_10.12.30.png
Attachment 5: Screenshot_2022-11-30_at_10.12.36.png
Screenshot_2022-11-30_at_10.12.36.png
Attachment 6: Screenshot_2022-11-30_at_10.13.11.png
Screenshot_2022-11-30_at_10.13.11.png
Attachment 7: Screenshot_2022-11-30_at_10.13.18.png
Screenshot_2022-11-30_at_10.13.18.png
Attachment 8: Screenshot_2022-11-30_at_10.14.46.png
Screenshot_2022-11-30_at_10.14.46.png
Attachment 9: Screenshot_2022-11-30_at_10.15.14.png
Screenshot_2022-11-30_at_10.15.14.png
Attachment 10: Screenshot_2022-11-30_at_10.33.38.png
Screenshot_2022-11-30_at_10.33.38.png
Attachment 11: Screenshot_2022-11-30_at_10.34.34.png
Screenshot_2022-11-30_at_10.34.34.png
Attachment 12: Screenshot_2022-11-30_at_10.35.01.png
Screenshot_2022-11-30_at_10.35.01.png
Attachment 13: Screenshot_2022-11-30_at_15.13.50.png
Screenshot_2022-11-30_at_15.13.50.png
Attachment 14: Screenshot_2022-11-30_at_15.14.05.png
Screenshot_2022-11-30_at_15.14.05.png
Attachment 15: Screenshot_2022-11-30_at_15.14.35.png
Screenshot_2022-11-30_at_15.14.35.png
Attachment 16: Screenshot_2022-11-30_at_15.14.41.png
Screenshot_2022-11-30_at_15.14.41.png
Attachment 17: Screenshot_2022-11-30_at_15.14.48.png
Screenshot_2022-11-30_at_15.14.48.png
Attachment 18: Screenshot_2022-11-30_at_15.14.53.png
Screenshot_2022-11-30_at_15.14.53.png
Attachment 19: Screenshot_2022-11-30_at_15.15.00.png
Screenshot_2022-11-30_at_15.15.00.png
Attachment 20: Screenshot_2022-11-30_at_15.16.28.png
Screenshot_2022-11-30_at_15.16.28.png
Attachment 21: Screenshot_2022-11-30_at_15.16.38.png
Screenshot_2022-11-30_at_15.16.38.png
Attachment 22: Screenshot_2022-11-30_at_15.39.31.png
Screenshot_2022-11-30_at_15.39.31.png
Attachment 23: Screenshot_2022-11-30_at_15.40.43.png
Screenshot_2022-11-30_at_15.40.43.png
Attachment 24: Screenshot_2022-11-30_at_15.41.33.png
Screenshot_2022-11-30_at_15.41.33.png
Attachment 25: Screenshot_2022-11-30_at_15.42.01.png
Screenshot_2022-11-30_at_15.42.01.png
Attachment 26: Screenshot_2022-11-30_at_15.46.29.png
Screenshot_2022-11-30_at_15.46.29.png
  31   Wed Oct 28 10:41:57 2020 TDWednesday 28 October
10.32

CARME chamber 5.8e-12mbar (see attachment 1)
Backing 1.6e-08mbar (Edwards vacuum cart w/RGA)

CARME temps - see attachment 2

All SAES D2000-10 & UHV1400 NEG power OFF
All SAES D2000-10 ion pump OFF
Gate valve open

11.01

All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012/5019  4-8e-11
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

11.04

CARME chamber 5.7e-12mbar
Backing 1.7e-08mbar (Edwards vacuum cart w/RGA)

12.12

CARME chamber 5.3e-12mbar
Backing 1.7e-08mbar (Edwards vacuum cart w/RGA)

All SAES D2000-10 & UHV1400 NEG power OFF
Gate valve open
All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

All ion pumps now stabilising wrt V/I/pressure

log (pressure) versus time - see attachment 3

16.00

CARME chamber 4.9e-12mbar - see attachment 4
Backing 1.7e-08mbar (Edwards vacuum cart w/RGA)

All SAES D2000-10 & UHV1400 NEG power OFF
Gate valve open
All SAES D2000-10 ion pump ON - see attachment 5

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

All ion pumps now stabilising wrt V/I/pressure

CARME temps - see attachment 6

Observing pressure transients from 5e-12mbar to c. 6-7e-12mbar which recover in c. 5-10 minutes 

21.00 CARME chamber 4.7e-12mbar
Attachment 1: 20201028_103204.jpg
20201028_103204.jpg
Attachment 2: 20201028_103638.jpg
20201028_103638.jpg
Attachment 3: 28102020_pump_down.png
28102020_pump_down.png
Attachment 4: 20201028_161049.jpg
20201028_161049.jpg
Attachment 5: 20201028_155823.jpg
20201028_155823.jpg
Attachment 6: 20201028_155940.jpg
20201028_155940.jpg
  446   Wed Sep 27 15:56:41 2023 TDWednesday 27 September
16.55 CARME IE514 8.2e-11 mbar

      Vacuum pressure increased slowly overnight from c. 6e-11 mbar yesterday to c. 8e-11 mbar today following low power startup tests of the bakeout controller heating 
the CARME interaction and detector chambers yesterday and today.


Attachment 1 - bakeout controller config courtesy Anton Kalinin

Attachments 2 & 3 - bakeout controller summary displays and CARME bakeout monitor display c. 17.00 today

The 3x CARME heaters are connected to controller #4 zones # 1-3, i.e. lower right display, zones 1-3, mains fuses F9-F11

17.30 3x ( of 4x ) SAES D-2000 ion pump controllers ( SIP modules ) switched off. Fourth controller was already switched off and SHV cable disconnected from rear panel of 
SIP module.
Attachment 1: 1000007129.jpg
1000007129.jpg
Attachment 2: 1000007127.jpg
1000007127.jpg
Attachment 3: 1000007128.jpg
1000007128.jpg
  35   Wed Nov 25 10:39:37 2020 TDWednesday 25 November
10.39

CARME XHV chamber pressure 6.0e-12mbar
Backing 2.1e-08mbar (Edwards vacuum cart w/RGA)

CARME temps - heaters OFF - chamber at ambient 
temperature

All SAES D2000-10 & UHV1400 NEG power OFF
All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

Gate valve open

attachment 1 - analog RGA scan (as found this am)

attachment 2 - scan mode 

c. 11.15

AH partially closes gate valve using c. 2 bar air pressure

VCARME XHV chamber pressure increases c. 7e-9mbar immediately

attachment 3 - RGA scan - no obvious change in RGA trends!

attachments 4 & 5 - VAT valve indicators - upper (partially open/closed) and lower (closed)

11.33 CARME XHV chamber pressure 6.6e-9mbar
Backing 2.2e-08mbar (Edwards vacuum cart w/RGA)

All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

All SAES D2000-10 ion pump OFF

11.40 CARME XHV chamber pressure 5.64e-9mbar

11.46 CARME XHV chamber pressure 5.01e-9mbar
No change in RGA trends!

12.01 CARME XHV chamber pressure 3.78e-9mbar
No change in RGA trends!

12.11 CARME XHV chamber pressure 3.10e-9mbar

12.42 CARME XHV chamber pressure 1.81e-9mbar
Backing 2.4e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

13.20 CARME XHV chamber pressure 1.06e-9mbar
Backing 2.4e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

13.36 CARME XHV chamber pressure 8.93e-10mbar
Backing 2.4e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

13.59 CARME XHV chamber pressure 7.07e-10mbar
Backing 2.5e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

14.00 Leybold turbo OFF - decelerating

14.30 Leybold turbo OFF - decelerating - 466Hz
CARME XHV chamber pressure 5.62e-10mbar
Backing 2.1e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

14.40 1x SAES D2000-10 ion pump switched on briefly - settles in c. 10s - pressure < 8.9e-
12mbar
All 4x D2000-10 ion pumps OFF

15.01 Leybold turbo OFF - decelerating - 125Hz
CARME XHV chamber pressure 4.78e-10mbar
Backing 1.4e-08mbar (Edwards vacuum cart w/RGA)
No change in RGA trends!

15.10 Abrupt increase in RGA trends - see attachment 6
Leybold turbo OFF - decelerating - 60Hz
CARME XHV chamber pressure 4.53e-10mbar
Backing 2.6e-08mbar (Edwards vacuum cart w/RGA)

15.19 4x SAES D2000-10 ion pumps ON
RGA record 04.24.00 

15.24 see attachment 7 - RGA transient recovering - turbo stopped?

15.10 Leybold turbo OFF - stopped - 0Hz
CARME XHV chamber pressure 4.40e-10mbar
Backing 1.1e-08mbar (Edwards vacuum cart w/RGA)

All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12

16.10 VAT gate valve partially closed
Leybold turbo OFF - stopped - 0Hz
CARME XHV chamber pressure 3.88e-10mbar
Backing 9.8e-09mbar (Edwards vacuum cart w/RGA)
RGA traces recovered to pre-transient levels and stable

All SAES D2000-10 ion pump ON

#  V/V       presssure/mbar
1  5012      < 8.9e-12
2  5012      < 8.9e-12
3  5012      < 8.9e-12
4  5012      < 8.9e-12
Attachment 1: 20201125_104631.jpg
20201125_104631.jpg
Attachment 2: 20201125_110500.jpg
20201125_110500.jpg
Attachment 3: 20201125_111937.jpg
20201125_111937.jpg
Attachment 4: 20201125_111954.jpg
20201125_111954.jpg
Attachment 5: 20201125_112003.jpg
20201125_112003.jpg
Attachment 6: 20201125_151232.jpg
20201125_151232.jpg
Attachment 7: 20201125_152354.jpg
20201125_152354.jpg
  544   Wed Apr 24 12:48:35 2024 TDWednesday 24 April
      Replace AIDA ASIC mezzanine of aida01

13.43 DSSSD bias & leakage current OK - attachment 1
      ambient temperature 16.5 deg C

      FEE64 temperatures OK - attachment 2

      All system wide checks OK 

      WR timestamps OK - attachment 3

      ADC data item stats OK - attachment 4

      per FEE64 Rate spectra - attachment 5
       c. 10 strips (of 1024) not producing data
       most missing strips are from aida05 - misaligned or damaged adaptor PCB?

      per p+n FEE64 1.8.L spectra - attachment 6
       aida01 pulser peak width 75 ch FWHM
       common x/y scale => peak height proxy for peak width

      per n+n FEE64 1.8.L spectra - attachment 7
       aida01 pulser peak width 70 ch FWHM

      per FEE64 1.8.W spectra - 20us FSR - attachments 8-11

Summary

All FEE64s appear to be working (except aida05 which has c. 8 missing channels) with pulser - which 
validates the FEE64, ASICs and adaptor PCB.

Electronic noise c. 50keV FWHM for aida01 & aida03 - other FEE64s better/worse.

Preamplifier noise appears to be similar for all FEE64s which may suggest an issue with the test signal chain

Note
1) e-target is starting up
2) have identified some instances of poor CARME cable management/routing see https://elog.ph.ed.ac.uk/CARME/545



EG&G Ortec 448 Pulser
Amplitude 50,000
Normalise 5.00
x5 attenuator IN
t_r 100ns
tau_d 50us
Polarity +
Frequency relay line (50Hz)

Cooknell SA1 Summing Amplifier
inverted output to test - daisy chain

Current ASIC settings saved to 2024Apr24-14.14.03


14.48 Pulser OFF
 
      All histograms & stats zero'd

      LEC slow comparator 0x64 -> 0xff
      HEC fast comparator 0x2 -> 0x5

      background alpha run to validate signal path from DSSSD to FEE64 adaptor PCB

22.18 Start Merger & TapeServer - attachments 12-14

      DSSSD bias & leakage current OK - attachment 21
      ambient temperature 16.0 deg C


      FEE64 temperatures OK - attachment 15

      WR timestamps OK - attachment 16

      ADC data item stats OK - attachment 17

      per FEE64 Rate spectra - attachment 18

      per p+n FEE64 1.8.L spectra - attachments 19-20
Attachment 1: Screenshot_from_2024-04-24_13-43-29.png
Screenshot_from_2024-04-24_13-43-29.png
Attachment 2: Screenshot_from_2024-04-24_13-44-02.png
Screenshot_from_2024-04-24_13-44-02.png
Attachment 3: Screenshot_from_2024-04-24_13-45-01.png
Screenshot_from_2024-04-24_13-45-01.png
Attachment 4: Screenshot_from_2024-04-24_13-45-28.png
Screenshot_from_2024-04-24_13-45-28.png
Attachment 5: Screenshot_from_2024-04-24_13-45-46.png
Screenshot_from_2024-04-24_13-45-46.png
Attachment 6: Screenshot_from_2024-04-24_13-47-59.png
Screenshot_from_2024-04-24_13-47-59.png
Attachment 7: Screenshot_from_2024-04-24_13-52-50.png
Screenshot_from_2024-04-24_13-52-50.png
Attachment 8: Screenshot_from_2024-04-24_13-55-02.png
Screenshot_from_2024-04-24_13-55-02.png
Attachment 9: Screenshot_from_2024-04-24_13-55-32.png
Screenshot_from_2024-04-24_13-55-32.png
Attachment 10: Screenshot_from_2024-04-24_13-56-48.png
Screenshot_from_2024-04-24_13-56-48.png
Attachment 11: Screenshot_from_2024-04-24_13-55-59.png
Screenshot_from_2024-04-24_13-55-59.png
Attachment 12: Screenshot_from_2024-04-24_22-19-55.png
Screenshot_from_2024-04-24_22-19-55.png
Attachment 13: Screenshot_from_2024-04-24_22-20-16.png
Screenshot_from_2024-04-24_22-20-16.png
Attachment 14: Screenshot_from_2024-04-24_22-20-30.png
Screenshot_from_2024-04-24_22-20-30.png
Attachment 15: Screenshot_from_2024-04-24_22-21-58.png
Screenshot_from_2024-04-24_22-21-58.png
Attachment 16: Screenshot_from_2024-04-24_22-22-22.png
Screenshot_from_2024-04-24_22-22-22.png
Attachment 17: Screenshot_from_2024-04-24_22-22-57.png
Screenshot_from_2024-04-24_22-22-57.png
Attachment 18: Screenshot_from_2024-04-24_22-23-27.png
Screenshot_from_2024-04-24_22-23-27.png
Attachment 19: Screenshot_from_2024-04-24_22-24-37.png
Screenshot_from_2024-04-24_22-24-37.png
Attachment 20: Screenshot_from_2024-04-24_22-25-30.png
Screenshot_from_2024-04-24_22-25-30.png
Attachment 21: Screenshot_from_2024-04-24_22-27-58.png
Screenshot_from_2024-04-24_22-27-58.png
  19   Wed Sep 23 13:34:32 2020 JM, TDWednesday 23 September
Connected Leybold Ionivac IE514 to Leybold Combivac CM52 Vacuum Gauge Controller

Rear panel - power ON

POST checks OK

Change parameters by

select PARA

select <-> to display Sen

select PARA to display S-on

select <-> to display HAnd

select PARA and hold for 7s

select CH to select CH3

select -> hold for 2s 

With CARME gate valve closed for c. 24h CARME chamber pressure is 6.43e-5mbar @ 13.34, 6.52e-5mbar @ 14.15


15.45 CARME Leybold turbo restarted

16.06 1.58e-6mbar, 3.5e-5mbar (RGA station), leak rate 3.6e-10 mbar.l/s

16.27 9.44e-7mbar, 3.3e-5mbar (RGA station), leak rate 3.6e-10 mbar.l/s

16.39 7.67e-7mbar

17.00 5.85e-7mbar, 2.5e-5mbar (RGA station), leak rate 2.60e-10 mbar.l/s

17.20 4.83-7mbar, 2.3e-5mbar (RGA station), leak rate 2.17e-10 mbar.l/s

Baking octagon moved into position along with the bottom insulation and heaters
 
Attachment 1: 20200923_170441.jpg
20200923_170441.jpg
Attachment 2: 20200923_170455.jpg
20200923_170455.jpg
Attachment 3: 20200923_170415.jpg
20200923_170415.jpg
Attachment 4: 20200923_161415.jpg
20200923_161415.jpg
Attachment 5: 20200923_161402.jpg
20200923_161402.jpg
  258   Wed Feb 23 18:58:12 2022 TD CNWednesday 23 February 15.00-23.00 shift

Assorted screenshots of the CARME, CRYRING and gas jet target control systems in operation

Attachment 1 - detector motion controls

Attachment 2 - gas jet target pressures (blue proxy for target density, red proxy for gas load to CRYRING)

Attachment 3 - Schottky probe monitor of beam

Attachment 4 - CRYRING controls monitor

Attachment 5 - CRYRING vacuum pressures

Attachment 6 - CRYRING beam position and profile monitor 
Attachment 1: 20220223_195402.jpg
20220223_195402.jpg
Attachment 2: 20220223_195349.jpg
20220223_195349.jpg
Attachment 3: 20220223_195208.jpg
20220223_195208.jpg
Attachment 4: 20220223_195203.jpg
20220223_195203.jpg
Attachment 5: 20220223_195142.jpg
20220223_195142.jpg
Attachment 6: 20220223_195133.jpg
20220223_195133.jpg
  473   Wed Jan 17 19:15:47 2024 TDWednesday 17 January
CAEN N1419ET remote control via carme-gsi and nnrpi1 - see https://elog.ph.ed.ac.uk/CARME/472

15x ( of 16x ) AIDA power cables available, labelled #1 - #15, installed

16x ( of 16x ) RJ45 Cat 6 network cables available, 15x labelled #1 - #15

16x ( of 16x ) HDMI cables available, labelled #1 - #16
  40   Wed Aug 11 12:30:40 2021 TD RSSWednesday 11 August
Attachments 1 & 2 - 2x SAES D-2000 re-fitted to side ports
                    all 4x SAES D-2000 now re-fitted to chamber

Will now fit 1x turbo and blank (currently) unused turbo port.

Attachments 3 & 4 - centre 2x78 pin micro-D feedthrough has some pins slightly bent - can probably be safely bent back into position 

ALWAYS check 78-pin feedthroughs for bent/broken pins before fitting connectors/cabling

Attachment 5 - currently unused turbo port

Attachments 6 & 7 - turbo port from above and side

Attachment 8 - turbo + NW16/NW25 adaptor + NW25 s/s hose + scroll pump + turbo controller + CMS52 gauge controller

Note we currently do not have a vent valve or backing line vacuum gauge (both functions provided by leak detector at STFC DL).
Attachment 1: 20210811_132906.jpg
20210811_132906.jpg
Attachment 2: 20210811_132918.jpg
20210811_132918.jpg
Attachment 3: 20210811_132932.jpg
20210811_132932.jpg
Attachment 4: 20210811_132943.jpg
20210811_132943.jpg
Attachment 5: 20210811_142615.jpg
20210811_142615.jpg
Attachment 6: 20210811_142629.jpg
20210811_142629.jpg
Attachment 7: 20210811_142638.jpg
20210811_142638.jpg
Attachment 8: 20210811_153236.jpg
20210811_153236.jpg
  372   Wed Aug 10 10:30:04 2022 TD, JMWednesday 10 August
09.45 Found CARME electrical power off

      Reset power switch of distribution box to on
      Reset fuse of 19" rack extender board

      One of the SIP power modules may be faulty - others switch on OK


14.00 Checked coolant water flow OK

      Transferred Netgear 24 port Gbit switch from AIDA (S4) to CARME (YR09)

      Re-connected FEE64 RJ45 network cables
      Re-connected nnrpi1 RJ45 network cable
      Re-connected RJ45 network cable (yellow) to bottom left connector of YR09 patch panel 
      
      @CRYRING user control rooms

      Connected RJ45 netwwork cable (yellow) from bottom left connector of patch panel (labelled "1-2->YR10" and "3-4->YR10") to CARME server carme-gsi p4p1 port


Retarted HttpdTcl servers on nnrpi1 and carme-gsi.

Normal 5x FEE64 power up

All system wide checks OK

FEE64 temperatures OK - attachment 1

ASIC settings 
 slow comparator 0x64

Pulser running through aida01-05
Detectors not biased -> lot of noise aida01-04

AIDA stats - attachments 3 & 4

aida05 pulser width ~150 channels FWHM, normal settings, shaping time 8us - attachment 4

See attachments 2-4

Tried changing ADC control register to 0xf in local controls tab -> stops waveform producing data -> no effect on pulser width (slight increase to 160 chn)
fast comparator blanked off (enable disable mask in discriminator control) -> no effect on pulser width
aida05 was ungrounded -> grounded aida05 to the same ground as aida01-04 -> pulser width reduced to 46 chns
Set ADC control register back to 0x0 -> waveforms back -> pulser width reduced to 24 chns
Changed shaping time from 8ms to 1ms -> pulser width increased to 67 chns -> changed back to 8ms shaping time -> returns to 24 chn width
Changed shaping time from 8ms to 2ms -> pulser width increased to 52 chns
Changed shaping time from 2ms to 4ms -> pulser width decreased to 33 chns
Attachment 1: 4.PNG
4.PNG
Attachment 2: 3.PNG
3.PNG
Attachment 3: 2.png
2.png
Attachment 4: 1.png
1.png
  539   Wed Feb 21 07:38:32 2024 TDWedneday 21 February
10.54 23.2.24 Bias OFF
Attachment 1: Screenshot_from_2024-02-20_18-40-08.png
Screenshot_from_2024-02-20_18-40-08.png
Attachment 2: Screenshot_from_2024-02-20_21-30-08.png
Screenshot_from_2024-02-20_21-30-08.png
Attachment 3: Screenshot_from_2024-02-21_01-00-13.png
Screenshot_from_2024-02-21_01-00-13.png
Attachment 4: Screenshot_from_2024-02-21_05-10-07.png
Screenshot_from_2024-02-21_05-10-07.png
Attachment 5: Screenshot_from_2024-02-21_08-30-06.png
Screenshot_from_2024-02-21_08-30-06.png
Attachment 6: Screenshot_from_2024-02-21_20-45-58.png
Screenshot_from_2024-02-21_20-45-58.png
Attachment 7: Screenshot_from_2024-02-21_20-46-12.png
Screenshot_from_2024-02-21_20-46-12.png
Attachment 8: Screenshot_from_2024-02-22_00-51-21.png
Screenshot_from_2024-02-22_00-51-21.png
Attachment 9: Screenshot_from_2024-02-22_14-02-29.png
Screenshot_from_2024-02-22_14-02-29.png
Attachment 10: Screenshot_from_2024-02-22_14-02-44.png
Screenshot_from_2024-02-22_14-02-44.png
Attachment 11: Screenshot_from_2024-02-22_19-00-08.png
Screenshot_from_2024-02-22_19-00-08.png
Attachment 12: Screenshot_from_2024-02-22_19-00-31.png
Screenshot_from_2024-02-22_19-00-31.png
Attachment 13: Screenshot_from_2024-02-23_11-53-32.png
Screenshot_from_2024-02-23_11-53-32.png
Attachment 14: Screenshot_from_2024-02-23_11-53-45.png
Screenshot_from_2024-02-23_11-53-45.png
Attachment 15: Capture_10.55.PNG
Capture_10.55.PNG
Attachment 16: Capture_18.00.PNG
Capture_18.00.PNG
Attachment 17: Capture_13.04.PNG
Capture_13.04.PNG
Attachment 18: Capture_23.52.PNG
Capture_23.52.PNG
Attachment 19: Capture_19.46.PNG
Capture_19.46.PNG
Attachment 20: Capture_07.30.PNG
Capture_07.30.PNG
Attachment 21: Capture_04.10.PNG
Capture_04.10.PNG
Attachment 22: Capture_00.00.PNG
Capture_00.00.PNG
Attachment 23: Capture_20.30.PNG
Capture_20.30.PNG
Attachment 24: Capture_17.40.PNG
Capture_17.40.PNG
  175   Wed Jan 26 19:16:18 2022 JM, OHWater cooling, FEE MAC address

Water cooling has been connected to the FEE's. Flow meter installed to outlet manifold by way of two right angled pieces. No leaks observed rom any points in the coolant loop, loop will be bled using taps tomorrow. Water turned OFF overnight. 

FEE's powered up with the MAC addresses of each read. 1 is the very bottom FEE and 8 the very top. FEE's have also labelled with the MAC addresses.  

1. 0xd8 0x80 0x39 0x42 0x0d 0x0c  

2. d8:80:39:41:d8:2b

3. d8:80:39:41:d0:05

4. 0xd8 0x80 0x39 0x41 0xd7 0xc2  (Now AIDA 5 see elog 185)

5. 0xd8 0x80 0x39 0x41 0xb4 0x0b (Now AIDA 4 see elog 185)

6. d8:80:39:41:d8:20

7. 0xd8 0x80 0x39 0x41 0xb4 0x16

8 .0xd8 0x80 0x39 0x41 0xd7 0xcd  

MACB firmware has been updated by Nic

One ion pump showed the warning 'arcing' (see attached photo) and was subsequently turned OFF. Most likely cause is the cable was moved during installlation of the flow meter as the pump showed no error this morning. The pump was turned back ON, no error observed -> cable not damaged but sensitive to movement.   

Attachment 1: 20220126_162435.jpg
20220126_162435.jpg
Attachment 2: 20220126_162448.jpg
20220126_162448.jpg
Attachment 3: 20220126-142809.jpg
20220126-142809.jpg
  116   Mon Oct 11 11:24:16 2021 RSS TD MLValve support and cable labeling

Split funnels were given to Oemer for cleaning. Have received them back after lunch.

Valve support is installed again (see picture 1).

Ion pump was connected but not activated. Michael will help in doing so. No vacuum support to help will RGA. Will proceed without it.

Neg and ion cables were labeled (see pictures 2 and 3).

Chamber was vented using nitrogen.

 

Attachment 1: IMG_4962.JPG
IMG_4962.JPG
Attachment 2: IMG_4969.JPG.svg
IMG_4969.JPG.svg
Attachment 3: IMG_4968.JPG.svg
IMG_4968.JPG.svg
  240   Tue Feb 22 18:23:02 2022 David. YuryVacuum problem

At 19:10 the vacuum has increased suddenly everywhere in the ring, roughly a factor 1.5.

ELOG V3.1.4-unknown