AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 4 of 34  ELOG logo
ID Date Author Subject Text Attachments
  612   Mon Jun 10 14:26:52 2024 EH, AKRun 5815:30

Merger OK, Tape server OK

ADC data item statistics OK
 8x 
  611   Mon Jun 10 12:49:56 2024 RSS, DB, CB, JM R58 Space Charge Test
13:53

      DSSSD bias & leakage
current OK - attachment 1

      FEE64
temperatures OK - attachment 2

      ADC
 Screenshot_from_2024-06-10_13-52-45.pngScreenshot_from_2024-06-10_13-53-04.pngScreenshot_from_2024-06-10_13-53-17.pngScreenshot_from_2024-06-10_13-53-28.png 
  610   Mon Jun 10 07:40:47 2024 RSS, DBBeam08:26: There is no beam and Gleb is informed.

08:46: Beam is back.
  
  609   Mon Jun 10 05:24:49 2024 TD, RSS, DBR5706:45 New data file G22-201/R57

      Right arm at 64.60 mm
 16x 
  608   Sun Jun 9 22:14:23 2024 TD, PM, AGRun 56 - Data taking23:15 New run 56 with

      Right arm at 64.60 mm
 31x 
  607   Sun Jun 9 13:45:24 2024 CB PMH AGRun 55 - Data taking14:45

New run 55 with:

Right arm at 64.60 mm
 18x 
  606   Sun Jun 9 09:45:27 2024 JM, CBBeam-Target OverlapTarget density this morning had stabalised
at 7e11 at/cm2

This is sufficient to test the
 Beam-overlap.png 
  605   Sun Jun 9 08:30:49 2024 JM, CBRun 54 - beam on target09:30

New run 54 with:

Electron cooler setpoint
 7x 
  604   Sat Jun 8 20:32:17 2024 LB, JMRun 52 - beam on targetNew run 52 with:

Electron cooler setpoint
244.2 V
 Screenshot_from_2024-06-08_22-56-26.pngScreenshot_from_2024-06-09_00-17-44.pngScreenshot_from_2024-06-09_00-18-46.pngScreenshot_from_2024-06-09_01-50-54.pngScreenshot_from_2024-06-09_01-51-27.png 
  603   Sat Jun 8 17:46:12 2024 TD[How To] Cycle Left DSSSDs
Interactive Motion Program [workspace 6,
display 2]
  
  602   Sat Jun 8 14:49:14 2024 TDR51 - contd
15.40 DSSSD bias & leakage current OK - attachments
1-2
 30x 
  601   Sat Jun 8 10:13:52 2024 CB, JM, TDRun 50/51 - data taking11:13

ML enabled ring signals remotely.

Used FakeMotion.dat (read FakeMotion.dat
 8x 
  600   Sat Jun 8 06:13:21 2024 CBRun 47/48/49 - target issues & tests07:00

After putting the target back,
we observe strong periodic (5 s) fluctuations
 Screenshot_from_2024-06-08_07-15-27.pngScreenshot_from_2024-06-08_07-15-33.pngScreenshot_from_2024-06-08_10-13-16.pngScreenshot_from_2024-06-08_10-13-23.pngScreenshot_from_2024-06-08_10-13-26.png 
  599   Sat Jun 8 00:14:39 2024 LBRun 46 - background with beamRUN 46- started at 00:50

Horizontal beam position = 4.0
mm, vertical beam position = -5.0 mm.
 22x 
  598   Fri Jun 7 22:33:13 2024 LBRun 45 - tests on beam-target overlapTried to double check beam-target overlap
by changing beam horizontal coordinate.

In the tablethe counts in the 4000-5200
 Screenshot_from_2024-06-07_23-11-06.pngScreenshot_from_2024-06-07_23-12-17.pngScreenshot_from_2024-06-07_23-32-22.pngScreenshot_from_2024-06-07_23-43-43.pngScreenshot_from_2024-06-07_23-50-54.png 
  597   Fri Jun 7 15:53:35 2024 TDDSSD leakage current increase - temperature increase in CRYRING hallRe-increase in DSSSD leakage current c.
14-15.00 6.6.24 

There was a significant temperature
 Capture.PNG 
  596   Fri Jun 7 14:09:04 2024 JM, CB, DR, CN, LBRun 44 - 15N Data Taking15:35

Electron cooler voltage set point
= 244.3 V
  
  595   Fri Jun 7 10:05:40 2024 CBRun 41/42/43 - 15N data taking start11:05

Confirmed overlap is at 4 mm under
new settings.
 8x 
  594   Thu Jun 6 16:23:10 2024 LB CB JMRun 39 - Run 40 15NStarted run 39.

 

We have the 15N+ beam with 426
 15x 
  593   Thu Jun 6 05:44:45 2024 DR YL DB LB CB JMRun 38 - 15N Tests06:45

All system checks OK

Target density 3.4e11
 8x 
ELOG V3.1.4-unknown