ID |
Date |
Author |
Subject |
Text |
 |
612
|
Mon Jun 10 14:26:52 2024 |
EH, AK | Run 58 | 15:30
Merger OK, Tape server OK
ADC data item statistics OK |
8x |
611
|
Mon Jun 10 12:49:56 2024 |
RSS, DB, CB, JM | R58 Space Charge Test |
13:53
DSSSD bias & leakage
current OK - attachment 1
FEE64
temperatures OK - attachment 2
ADC |
   |
610
|
Mon Jun 10 07:40:47 2024 |
RSS, DB | Beam | 08:26: There is no beam and Gleb is informed.
08:46: Beam is back. |
|
609
|
Mon Jun 10 05:24:49 2024 |
TD, RSS, DB | R57 | 06:45 New data file G22-201/R57
Right arm at 64.60 mm
|
16x |
608
|
Sun Jun 9 22:14:23 2024 |
TD, PM, AG | Run 56 - Data taking | 23:15 New run 56 with
Right arm at 64.60 mm
|
31x |
607
|
Sun Jun 9 13:45:24 2024 |
CB PMH AG | Run 55 - Data taking | 14:45
New run 55 with:
Right arm at 64.60 mm |
18x |
606
|
Sun Jun 9 09:45:27 2024 |
JM, CB | Beam-Target Overlap | Target density this morning had stabalised
at 7e11 at/cm2
This is sufficient to test the |
|
605
|
Sun Jun 9 08:30:49 2024 |
JM, CB | Run 54 - beam on target | 09:30
New run 54 with:
Electron cooler setpoint |
7x |
604
|
Sat Jun 8 20:32:17 2024 |
LB, JM | Run 52 - beam on target | New run 52 with:
Electron cooler setpoint
244.2 V |
    |
603
|
Sat Jun 8 17:46:12 2024 |
TD | [How To] Cycle Left DSSSDs |
Interactive Motion Program [workspace 6,
display 2]
|
|
602
|
Sat Jun 8 14:49:14 2024 |
TD | R51 - contd |
15.40 DSSSD bias & leakage current OK - attachments
1-2
|
30x |
601
|
Sat Jun 8 10:13:52 2024 |
CB, JM, TD | Run 50/51 - data taking | 11:13
ML enabled ring signals remotely.
Used FakeMotion.dat (read FakeMotion.dat |
8x |
600
|
Sat Jun 8 06:13:21 2024 |
CB | Run 47/48/49 - target issues & tests | 07:00
After putting the target back,
we observe strong periodic (5 s) fluctuations |
    |
599
|
Sat Jun 8 00:14:39 2024 |
LB | Run 46 - background with beam | RUN 46- started at 00:50
Horizontal beam position = 4.0
mm, vertical beam position = -5.0 mm. |
22x |
598
|
Fri Jun 7 22:33:13 2024 |
LB | Run 45 - tests on beam-target overlap | Tried to double check beam-target overlap
by changing beam horizontal coordinate.
In the tablethe counts in the 4000-5200 |
    |
597
|
Fri Jun 7 15:53:35 2024 |
TD | DSSD leakage current increase - temperature increase in CRYRING hall | Re-increase in DSSSD leakage current c.
14-15.00 6.6.24
There was a significant temperature |
|
596
|
Fri Jun 7 14:09:04 2024 |
JM, CB, DR, CN, LB | Run 44 - 15N Data Taking | 15:35
Electron cooler voltage set point
= 244.3 V |
|
595
|
Fri Jun 7 10:05:40 2024 |
CB | Run 41/42/43 - 15N data taking start | 11:05
Confirmed overlap is at 4 mm under
new settings. |
8x |
594
|
Thu Jun 6 16:23:10 2024 |
LB CB JM | Run 39 - Run 40 15N | Started run 39.
We have the 15N+ beam with 426 |
15x |
593
|
Thu Jun 6 05:44:45 2024 |
DR YL DB LB CB JM | Run 38 - 15N Tests | 06:45
All system checks OK
Target density 3.4e11 |
8x |