AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 4 of 38  ELOG logo
Entry  Thu May 29 18:04:47 2025, LB, CB, PMH, JM, Run 32,33,34 7x
Oven temperature increased, current up to 3.5E7 pps.

Found beam-target overlap setting horizontal bump in RO9 to -2.5mm.

Target T1 30.5K, density increasing to 2.6E11 at/cm2.
Entry  Thu May 29 14:39:52 2025, CB LB PMH, Run 31 9x
15:40

Waiting for Serge to come in to change beam energy.

Remaining at the same beam energy and settings as before, except RIGHT arm now moving.
Entry  Wed May 28 16:40:48 2025, EH, SN, LB, OF, EBM, CB, Run 28/29/30 - 1.88 MeV/A 37x
We start a new run with real data taking condititon: beam is ok, target density is 1e12 cm-2, detectors are moving in-out periodically.

 

Cooler voltage setpoint 1066.6 V. Read value 1068 V.
Entry  Wed May 28 10:54:14 2025, LB, Run 27 Screenshot_from_2025-05-28_15-45-13.pngScreenshot_from_2025-05-28_15-46-07.pngScreenshot_from_2025-05-28_15-48-27.pngScreenshot_from_2025-05-28_15-48-38.pngScreenshot_from_2025-05-28_15-49-09.png
Run 27 running

28/05/2025

(ignore 26 - in-between run)
Entry  Tue May 27 22:20:11 2025, CB, LB,PW, Run 25 - 1.99/2.02 MeV/A 27x
23:20

JM thinks we cannot see 7Be locus on run 24. Possibly the right arm cannot get close enough.

Stopped moving right arm
Entry  Tue May 27 15:18:46 2025, JG, CN, JM, run 24 7x
Run 24 running

27/05/2025

We start a new run with real data taking condititon: beam is ok, target density is 5e11 cm-2, detectors are moving in-out periodically.
Entry  Tue May 27 12:49:48 2025, ML, Ion beam / electron beam settings so far. 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt
Screenshots and ParamModi settings export attached.
Entry  Tue May 27 08:38:29 2025, TD, [How To] Recover DAQ when one FEE64 stops sending data - short(er) version  
1) Select 'No Storage' [workspace 4, display 1, browser tab 'TapeServer']
    If already in 'No Storage' mode please ignore this step
Entry  Tue May 27 05:24:05 2025, LB,SN, L. Cs. P. J. W., Run 22, 23 - 1.95 MeV/A 8x
27/05/2025 ca. 6:00

We start a new run: beam is ok, target density ok, detectors are moving in-out periodically.

Cooler voltage setpoint  1105.7 V
Entry  Tue May 27 05:03:41 2025, JM, DAQ restart 7x
06:00

FEE modules power cycled.

No issues on power cycle restart.
Entry  Mon May 26 18:37:17 2025, LC, AG, LB, SN, Run 21 12x
Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data taking condititon: beam is ok, target density is 1.1e12 cm-2, detectors are moving in-out periodically.
Entry  Mon May 26 08:56:56 2025, EM,LB, Run20 8x
Run 20 running

We start a new run since the laser guys will do some measurements.

Zoran will increase the beam intensity
Entry  Sat May 24 18:27:55 2025, EM, LC, Background runs continued R17-R19 36x
Summary: Target not running. Background runs written to disk, some with beam some without.

19:27 Data file R17  running

      DSSSD positions out. Nikos will work on the target.
Entry  Sat May 24 08:28:14 2025, TD, EM, Background runs R13-R16 29x
Summary: Target not running. Some background files written to disk, some with beam some without. 

09.27 DAQ going
Entry  Fri May 23 09:19:40 2025, SN, TD, Target wait, switch lithium oven 18x

10.12 DAQ, Merger & Tape Server running OK - no storage mode 
Entry  Thu May 22 06:41:10 2025, JG, TD, R6 - R11 scrapers test / pulser walk 33x
07.00 

JG found target off (target data stopped c. 02.30 this morning) and beam off (not re-enabled from previous CRYRNG area entry - target related?) JG re-enables
Entry  Wed May 21 14:38:22 2025, JM, TD, R4 and R5 - background 7x
15:30

Waiting for the target to cool down. ETA is 16:30 for cooling to be finished and then we need to try and make target.

While waiting we havve been running a background (R3). I noticed the rates on aida10 had increased (300k) and aida09 were slowlly creeping up
Entry  Tue May 20 19:38:36 2025, JM, CARME restart 6x
19:00

Arrived at GSI.

We have 6Li1+ beam in the ring at 2 MeV/u. Injection is about 2.5e7 pps and lifetime with no target is about 40 seconds. We have injection every
Entry  Sat May 17 11:19:06 2025, JM, Shifter intructions 2025 
EMERGENCY SHUTDOWNS

1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)

2. Internal target:
Entry  Tue May 13 15:07:42 2025, JM, Online monitoring code Screenshot_from_2025-05-13_15-14-12.pngScreenshot_from_2025-05-13_15-14-38.pngScreenshot_from_2025-05-13_15-28-48.png
CARME_Sort histogramming has been updated to aid our understanding online.

> XY plots have been updated to reflect the true position of the beam relative to each detector. Online we will be able to layout in a grid
to reflect looking downstream in YR09 (see attachment 1)
ELOG V3.1.4-unknown