Entry  Sat Jun 8 06:13:21 2024, CB, Run 47/48/49 - target issues & tests Screenshot_from_2024-06-08_07-15-27.pngScreenshot_from_2024-06-08_07-15-33.pngScreenshot_from_2024-06-08_10-13-16.pngScreenshot_from_2024-06-08_10-13-23.pngScreenshot_from_2024-06-08_10-13-26.png
07:00

After putting the target back, we observe strong periodic (5 s) fluctuations going from 3E11 to 5E12. The reason is unclear. One may warm up
the target to solve this, but will ask Nikos later instead.
Entry  Sat Jun 8 00:14:39 2024, LB, Run 46 - background with beam 22x
RUN 46- started at 00:50

Horizontal beam position = 4.0 mm, vertical beam position = -5.0 mm.

Detectors are Left arm OUT = 36.64, right arm IN =  64.60 mm
Entry  Fri Jun 7 22:33:13 2024, LB, Run 45 - tests on beam-target overlap Screenshot_from_2024-06-07_23-11-06.pngScreenshot_from_2024-06-07_23-12-17.pngScreenshot_from_2024-06-07_23-32-22.pngScreenshot_from_2024-06-07_23-43-43.pngScreenshot_from_2024-06-07_23-50-54.png
Tried to double check beam-target overlap by changing beam horizontal coordinate.

In the tablethe counts in the 4000-5200 keV region in each of the detectors are recorded. Counts were taken for a total time of 5 minutes per
beam position. Attached are the xy plots.
Entry  Thu Jun 6 16:23:10 2024, LB CB JM, Run 39 - Run 40 15N 15x
Started run 39.

 

We have the 15N+ beam with 426 keV/nucleon. We see a peak in detector top left (mostly) and bottom right, at 4600 keV. We think it is the beam
    Reply  Fri Jun 7 15:53:35 2024, TD, DSSD leakage current increase - temperature increase in CRYRING hall Capture.PNG
Re-increase in DSSSD leakage current c. 14-15.00 6.6.24 

There was a significant temperature spike in the CRYRING hall on the afternoon of 6.6.24 which has, partly, recovered - see attachment 1




Quote:


Entry  Fri Jun 7 14:09:04 2024, JM, CB, DR, CN, LB, Run 44 - 15N Data Taking 
15:35

Electron cooler voltage set point = 244.3 V

Electron cooler voltage readout = 243.75 V
Entry  Fri Jun 7 10:05:40 2024, CB, Run 41/42/43 - 15N data taking start 8x
11:05

Confirmed overlap is at 4 mm under new settings.

For unclear reasons, the bottom-left detector is not seeing the halo anymore since around 10:00. Rutherford still visible and if the left arm
Entry  Thu Jun 6 05:44:45 2024, DR YL DB LB CB JM, Run 38 - 15N Tests 8x
06:45

All system checks OK

Target density 3.4e11
Entry  Wed Jun 5 13:34:02 2024, JM, Run 37 - Change in thresholds Screenshot_from_2024-06-05_14-36-44.png
14:20

Target nozzle currently being replaced. No beam

We have decided to switch to 15N beam from now on.
Entry  Wed Jun 5 13:21:45 2024, JM, CB, Run 36 - pulser walkthrough Screenshot_from_2024-06-05_14-20-18.pngScreenshot_from_2024-06-05_14-21-26.pngScreenshot_from_2024-06-05_14-27-43.pngScreenshot_from_2024-06-05_14-25-44.png
14:00

Access to the cave as Nikos and Andreas have begun work on the target.

Run 36 started - pulser walkthrough.
Entry  Wed Jun 5 08:34:04 2024, JM. DB, PC, Target nozzle change 
09:30

Target density has not improved despite efforts last night. Mid 10 - low 11 density range. We will try to change the nozzle.

Target nozzle moved to the out position.
Entry  Tue Jun 4 19:19:26 2024, TD, [How To] Recover DAQ when one FEE64 stops sending data 
1) STOP DAQ [workspace 2, display 1, browser tab 'Run Control']
   all FEE64s should change status from 'going' to 'stopped' *except* whichever FEE64(s) have a problem - typically their status is 'going' or 'error'
Entry  Tue Jun 4 18:08:04 2024, Boudefla Dounia - CB - LB - SD, Run 34 19x
19:08

Beam energy = 3 MeV.

Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Entry  Tue Jun 4 15:25:36 2024, BD US CB, Run 33 Screenshot_from_2024-06-04_18-33-23.pngScreenshot_from_2024-06-04_18-33-38.pngScreenshot_from_2024-06-04_18-35-26.pngScreenshot_from_2024-06-04_18-36-55.png
16:26

Merger OK, Tape server OK

ADC data item statistics looks as before. OK
Entry  Tue Jun 4 14:13:17 2024, JM, CB, DB, US, Run 32- beam only background 
15:15

Run 32 started - Beam, no target

Beam energy = 3 MeV.
Entry  Tue Jun 4 06:56:02 2024, DFF, PC, LB, JM,NP,AB, Run 31 contd Screenshot_from_2024-06-04_10-53-58.pngScreenshot_from_2024-06-04_10-58-02.png
8:13

Since 6:40 the target density dramatically dropped to 10^9 since then it has been unstable and did not recover. Currently it is around 8e8.

09:00
Entry  Tue Jun 4 00:04:39 2024, DR, EH, Run 31 
Beam energy = 3 MeV

Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.

Beam intensity at inj ~ 2.5e7
Entry  Mon Jun 3 21:37:20 2024, CN, EM, CB, Run30 Screenshot_from_2024-06-03_23-15-37.pngScreenshot_from_2024-06-03_23-16-18.pngScreenshot_from_2024-06-03_23-17-16.png
Beam energy = 3 MeV

Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.

Beam intensity at inj ~ 2.5e7
Entry  Mon Jun 3 15:17:41 2024, CN, EM, CB, Run29  Screenshot_from_2024-06-03_18-04-47.pngScreenshot_from_2024-06-03_18-05-11.pngScreenshot_from_2024-06-03_18-06-09.pngScreenshot_from_2024-06-03_18-06-40.pngScreenshot_from_2024-06-03_20-35-00.png
16:15

In the previous run while working on the target it was discovered that the valve was closed! Probaly this happened around 10 am, we are not sure.

The gas target inlet valve is open again, working on the target.
Entry  Mon Jun 3 15:10:12 2024, CN, EM, CB, Run28 Screenshot_from_2024-06-03_16-12-44.pngScreenshot_from_2024-06-03_16-13-11.pngScreenshot_from_2024-06-03_16-14-11.pngScreenshot_from_2024-06-03_16-16-37.png
16:10

We start a new run after doing some test with the motor. Injection time is now a 6s, moving of the motors is working fine.

Merger OK, Tape server OK
Entry  Mon Jun 3 11:46:07 2024, SD, SHB, JM, CN, EM, Run 27 12x
12:46 (attachments 1-4)

Run 27 started - Beam no target

Beam energy = 3 MeV