AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  CARME, Page 4 of 38  ELOG logo
Entry  Sat May 31 10:46:42 2025, TD, Run 38 - remote monitoring 21x

11.40 DAQ continues
      File G22-205/R38
Entry  Sat May 31 09:58:21 2025, JM, Run 38 10x
10:56

Run 38 started.

D+ beam deuterium target. D+ beam energy is 1.5 MeV/u. (beam calc calculation is 1.5160 MeV/u)
Entry  Fri May 30 21:49:08 2025, JM, NP, CB, Run 37 Screenshot_from_2025-05-31_00-56-32.pngScreenshot_from_2025-05-31_00-58-40.pngScreenshot_from_2025-05-31_06-16-50.png
22:49

Run 37 started.

D+ beam deuterium target. D+ beam energy is 2 MeV/u. (beam calc calculation is 1.9211 MeV/u)
Entry  Fri May 30 20:47:47 2025, JM, CB, NP, Run 36 Screenshot_from_2025-05-30_22-45-48.pngScreenshot_from_2025-05-30_22-46-48.png
21:47

Run 36 started.

D+ beam deuterium target. D+ beam energy is 2 MeV/u.
Entry  Fri May 30 20:06:48 2025, JM, CB, NP, Run35 8x
21:00

Run 35 started.

D+ beam deuterium target. D+ beam energy is 2 MeV/u. (beam calc calculation is 1.9211 MeV/u -> may be wrong cooler voltage, need to check
Entry  Fri May 30 07:27:41 2025, CB LB JM NP EM, Waiting for deuterium 8x
08:27

No run going.

Temperatures OK - attach
Entry  Thu May 29 18:04:47 2025, LB, CB, PMH, JM, Run 32,33,34 7x
Oven temperature increased, current up to 3.5E7 pps.

Found beam-target overlap setting horizontal bump in RO9 to -2.5mm.

Target T1 30.5K, density increasing to 2.6E11 at/cm2.
Entry  Thu May 29 14:39:52 2025, CB LB PMH, Run 31 9x
15:40

Waiting for Serge to come in to change beam energy.

Remaining at the same beam energy and settings as before, except RIGHT arm now moving.
Entry  Wed May 28 16:40:48 2025, EH, SN, LB, OF, EBM, CB, Run 28/29/30 - 1.88 MeV/A 37x
We start a new run with real data taking condititon: beam is ok, target density is 1e12 cm-2, detectors are moving in-out periodically.

 

Cooler voltage setpoint 1066.6 V. Read value 1068 V.
Entry  Wed May 28 10:54:14 2025, LB, Run 27 Screenshot_from_2025-05-28_15-45-13.pngScreenshot_from_2025-05-28_15-46-07.pngScreenshot_from_2025-05-28_15-48-27.pngScreenshot_from_2025-05-28_15-48-38.pngScreenshot_from_2025-05-28_15-49-09.png
Run 27 running

28/05/2025

(ignore 26 - in-between run)
Entry  Tue May 27 22:20:11 2025, CB, LB,PW, Run 25 - 1.99/2.02 MeV/A 27x
23:20

JM thinks we cannot see 7Be locus on run 24. Possibly the right arm cannot get close enough.

Stopped moving right arm
Entry  Tue May 27 15:18:46 2025, JG, CN, JM, run 24 7x
Run 24 running

27/05/2025

We start a new run with real data taking condititon: beam is ok, target density is 5e11 cm-2, detectors are moving in-out periodically.
Entry  Tue May 27 12:49:48 2025, ML, Ion beam / electron beam settings so far. 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt
Screenshots and ParamModi settings export attached.
Entry  Tue May 27 08:38:29 2025, TD, [How To] Recover DAQ when one FEE64 stops sending data - short(er) version  
1) Select 'No Storage' [workspace 4, display 1, browser tab 'TapeServer']
    If already in 'No Storage' mode please ignore this step
Entry  Tue May 27 05:24:05 2025, LB,SN, L. Cs. P. J. W., Run 22, 23 - 1.95 MeV/A 8x
27/05/2025 ca. 6:00

We start a new run: beam is ok, target density ok, detectors are moving in-out periodically.

Cooler voltage setpoint  1105.7 V
Entry  Tue May 27 05:03:41 2025, JM, DAQ restart 7x
06:00

FEE modules power cycled.

No issues on power cycle restart.
Entry  Mon May 26 18:37:17 2025, LC, AG, LB, SN, Run 21 12x
Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data taking condititon: beam is ok, target density is 1.1e12 cm-2, detectors are moving in-out periodically.
Entry  Mon May 26 08:56:56 2025, EM,LB, Run20 8x
Run 20 running

We start a new run since the laser guys will do some measurements.

Zoran will increase the beam intensity
Entry  Sat May 24 18:27:55 2025, EM, LC, Background runs continued R17-R19 36x
Summary: Target not running. Background runs written to disk, some with beam some without.

19:27 Data file R17  running

      DSSSD positions out. Nikos will work on the target.
Entry  Sat May 24 08:28:14 2025, TD, EM, Background runs R13-R16 29x
Summary: Target not running. Some background files written to disk, some with beam some without. 

09.27 DAQ going
ELOG V3.1.3-7933898