  ID Date Author Subject Text Attachments
  698   Tue May 27 22:20:11 2025 CB, LB,PWRun 25 - 1.99/2.02 MeV/A23:20

JM thinks we cannot see 7Be locus
on run 24. Possibly the right arm cannot
 27x 
  697   Tue May 27 15:18:46 2025 JG, CN, JMrun 24Run 24 running

27/05/2025

We start a new run with real data
 7x 
  696   Tue May 27 12:49:48 2025 MLIon beam / electron beam settings so far.Screenshots and ParamModi settings export
attached.
 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt 
  695   Tue May 27 08:38:29 2025 TD[How To] Recover DAQ when one FEE64 stops sending data - short(er) version 1) Select 'No Storage' [workspace 4, display
1, browser tab 'TapeServer']
    If already in 'No Storage' mode please
  
  694   Tue May 27 05:24:05 2025 LB,SN, L. Cs. P. J. W.Run 22, 23 - 1.95 MeV/A27/05/2025 ca. 6:00

We start a new run: beam is ok,
target density ok, detectors are moving in-out
 8x 
  693   Tue May 27 05:03:41 2025 JMDAQ restart06:00

FEE modules power cycled.

No issues on power cycle restart.
 7x 
  692   Mon May 26 18:37:17 2025 LC, AG, LB, SNRun 21Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data
 12x 
  691   Mon May 26 08:56:56 2025 EM,LBRun20Run 20 running

We start a new run since the laser
guys will do some measurements.
 8x 
  690   Sat May 24 18:27:55 2025 EM, LCBackground runs continued R17-R19Summary: Target not running. Background
runs written to disk, some with beam some
without.
 36x 
  689   Sat May 24 08:28:14 2025 TD, EMBackground runs R13-R16Summary: Target not running. Some background
files written to disk, some with beam some
without. 
 29x 
  688   Fri May 23 09:19:40 2025 SN, TDTarget wait, switch lithium oven
10.12 DAQ, Merger & Tape Server running OK
- no storage mode 
 18x 
  687   Thu May 22 06:41:10 2025 JG, TDR6 - R11 scrapers test / pulser walk07.00 

JG found target off (target data stopped
 33x 
  686   Wed May 21 14:38:22 2025 JM, TDR4 and R5 - background15:30

Waiting for the target to cool
down. ETA is 16:30 for cooling to be finished
 7x 
  685   Tue May 20 19:38:36 2025 JMCARME restart19:00

Arrived at GSI.

We have 6Li1+ beam in the ring
 6x 
  684   Sat May 17 11:19:06 2025 JMShifter intructions 2025EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
  
  683   Tue May 13 15:07:42 2025 JMOnline monitoring codeCARME_Sort histogramming has been updated
to aid our understanding online.

> XY plots have been updated
 Screenshot_from_2025-05-13_15-14-12.pngScreenshot_from_2025-05-13_15-14-38.pngScreenshot_from_2025-05-13_15-28-48.png 
  682   Mon May 12 13:25:09 2025 JGtarget/ring DAQ - overviewAn MBS DAQ is running to collect two types
of data:
  
  681   Sat Apr 26 22:01:37 2025 CBProxy bridgeProxy bridge enabling anydesk and generic
Internet access dropped due to atppc025 being
rebooted. Found it dropped again late today.
  
  680   Wed Apr 23 11:08:34 2025 TD, JMBackground Run
12.08 DSSSD bias & leakage current - attachments
1-2
 11x 
  679   Tue Apr 22 06:44:02 2025 TDTuesday 22 April
07.40 DSSSD bias & leakage current - attachments
1-3
 Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png 