AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 5 of 34  ELOG logo
ID Date Author Subjectdown Text Attachments
  115   Sat Oct 9 09:47:33 2021 CBTo do list for next week0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split.
 Capture.PNG 
  447   Thu Sep 28 09:19:50 2023 TDThursday 28 September
10.20 CARME IE514 8.6e-11 mbar
 1000007142.jpg1000007143.jpg 
  546   Thu Apr 25 02:31:25 2024 TDThursday 25 April
03.27 DAQ continues - file APR24/R1_7
 39x 
  20   Thu Sep 24 10:04:58 2020 JM, TDThursday 24 September
Following overnight pumping by Leybold turbo
pump
 20200924_152852.jpgPhotos.zip 
  28   Thu Oct 22 10:39:40 2020 TDThursday 22 October
10.40
 19x 
  475   Thu Jan 18 17:21:00 2024 TDThursday 18 JanuaryNetwork ( dhcpd.conf ) and MIDAS startup.tcl/Options/ASIC
settings/rfs filesystems configured
 Capture.PNG 
  541   Thu Apr 18 13:34:06 2024 TD, JGThursday 18 April
14.30 
 13x 
  123   Thu Oct 14 15:54:47 2021 TD RSSThursday 14 OctoberAttachment 1 - what is function of the 4x
c/s holes indicated?
 IMG_5056.JPG.jpgIMG_5053.JPG 
  41   Thu Aug 12 09:16:42 2021 TD RSSThursday 12 August
Attachment 1 - IE414/514 feedthrough wiring
diagram
 13x 
  8   Thu Sep 10 11:34:30 2020 TD, JMThursday 10 September All neg feed-throughs have now been fully
installed, with ground tags 
and power wires crimped and attached to the
 20200910_112152.jpg20200910_112211.jpgPhotos_(1).zip 
  672   Thu Apr 10 10:53:14 2025 TDThursday 10 April11.50 DAQ continues
      Data file APR25/R6_13
 8x 
  383   Thu Dec 1 08:56:59 2022 AR TDThursday 1 December Photos of noise observed at each of the
AIDA PSU outputs by digital oscillscope.

DAQ GOing with waveforms enabled.
 11x 
  557   Wed May 29 09:49:35 2024 JM, CBThreshold changes / D+ beam09:00

R4 alpha background continues,
currently R4_12
 Screenshot_from_2024-05-29_11-00-20.pngScreenshot_from_2024-05-29_11-01-30.pngScreenshot_from_2024-05-29_11-01-47.pngScreenshot_from_2024-05-29_11-02-03.png 
  430   Thu Jul 27 09:43:56 2023 RSSThermocouples connected -2
10:30  IE514 1.80e-08mbar

Most
of the CARME is covered by the baking tent.
The tent needs to be closed and a bit covered
 IMG_9920.jpgIMG_9919.jpg 
  425   Sat Jul 22 09:19:59 2023 RSS, TDThermocouples connected10.20 Pirani 1e-03mbar IE514 3.26e-08mbar

 10x 
  149   Wed Nov 10 18:24:12 2021 RSSThermocouple labelling1. Detector

2. Chamber back

3. Strain relief
 labeling.JPG.svgLabelling.svgIMG_5512.JPG 
  128   Thu Oct 21 20:26:44 2021 JM TDThermocouple and Connector cablesNEG pump electrical connections tested
- all connections sound. 

Detector carriers have been redrilled
 10x 
  158   Thu Nov 18 13:50:51 2021 CB RSSThermocamera imagesUsed thermocamera provided by GSI beam
diagnostic division to take some pictures
of YR09. See attached.
 14x 
  457   Thu Jan 4 13:15:10 2024 CB, JMTent removed - bias testRemoved tent, octagon, Neg cables.

Disconnected and removed Baking
Pi, TC08, thermocouples.
 Bias.png 
  87   Mon Sep 27 11:09:48 2021 CB (remotely)Temperature vs Pressure plotAttached.  Temps.pdf 
ELOG V3.1.4-unknown