ID |
Date |
Author |
Subject |
Text |
 |
115
|
Sat Oct 9 09:47:33 2021 |
CB | To do list for next week | 0. Give split-funnels to OG or Grossmontage
to clean. Mount back foot support for gate
valves. Critical when we split. |
|
447
|
Thu Sep 28 09:19:50 2023 |
TD | Thursday 28 September |
10.20 CARME IE514 8.6e-11 mbar
|
 |
546
|
Thu Apr 25 02:31:25 2024 |
TD | Thursday 25 April |
03.27 DAQ continues - file APR24/R1_7
|
39x |
20
|
Thu Sep 24 10:04:58 2020 |
JM, TD | Thursday 24 September |
Following overnight pumping by Leybold turbo
pump
|
 |
28
|
Thu Oct 22 10:39:40 2020 |
TD | Thursday 22 October |
10.40
|
19x |
475
|
Thu Jan 18 17:21:00 2024 |
TD | Thursday 18 January | Network ( dhcpd.conf ) and MIDAS startup.tcl/Options/ASIC
settings/rfs filesystems configured
|
|
541
|
Thu Apr 18 13:34:06 2024 |
TD, JG | Thursday 18 April |
14.30
|
13x |
123
|
Thu Oct 14 15:54:47 2021 |
TD RSS | Thursday 14 October | Attachment 1 - what is function of the 4x
c/s holes indicated?
|
 |
41
|
Thu Aug 12 09:16:42 2021 |
TD RSS | Thursday 12 August |
Attachment 1 - IE414/514 feedthrough wiring
diagram
|
13x |
8
|
Thu Sep 10 11:34:30 2020 |
TD, JM | Thursday 10 September | All neg feed-throughs have now been fully
installed, with ground tags
and power wires crimped and attached to the |
  |
672
|
Thu Apr 10 10:53:14 2025 |
TD | Thursday 10 April | 11.50 DAQ continues
Data file APR25/R6_13
|
8x |
383
|
Thu Dec 1 08:56:59 2022 |
AR TD | Thursday 1 December | Photos of noise observed at each of the
AIDA PSU outputs by digital oscillscope.
DAQ GOing with waveforms enabled. |
11x |
557
|
Wed May 29 09:49:35 2024 |
JM, CB | Threshold changes / D+ beam | 09:00
R4 alpha background continues,
currently R4_12 |
   |
430
|
Thu Jul 27 09:43:56 2023 |
RSS | Thermocouples connected -2 |
10:30 IE514 1.80e-08mbar
Most
of the CARME is covered by the baking tent.
The tent needs to be closed and a bit covered |
 |
425
|
Sat Jul 22 09:19:59 2023 |
RSS, TD | Thermocouples connected | 10.20 Pirani 1e-03mbar IE514 3.26e-08mbar
|
10x |
149
|
Wed Nov 10 18:24:12 2021 |
RSS | Thermocouple labelling | 1. Detector
2. Chamber back
3. Strain relief |
  |
128
|
Thu Oct 21 20:26:44 2021 |
JM TD | Thermocouple and Connector cables | NEG pump electrical connections tested
- all connections sound.
Detector carriers have been redrilled |
10x |
158
|
Thu Nov 18 13:50:51 2021 |
CB RSS | Thermocamera images | Used thermocamera provided by GSI beam
diagnostic division to take some pictures
of YR09. See attached. |
14x |
457
|
Thu Jan 4 13:15:10 2024 |
CB, JM | Tent removed - bias test | Removed tent, octagon, Neg cables.
Disconnected and removed Baking
Pi, TC08, thermocouples. |
|
87
|
Mon Sep 27 11:09:48 2021 |
CB (remotely) | Temperature vs Pressure plot | Attached. |
|