ID |
Date |
Author |
Subject |
Text |
 |
574
|
Sun Jun 2 08:47:01 2024 |
CB, AG | Run 22 - longer rung with 20 min storage | 09:47
12 seconds pre acc
200x cycles |
    |
573
|
Sun Jun 2 06:41:00 2024 |
CB, AG | Run 21 - tests | 07:41
Switching to bunched beam to check
D vs H content. |
10x |
572
|
Sat Jun 1 21:56:17 2024 |
JM, EM, EM, TY, CB, AG | Run 20 | 22:56
Run 20 started - beam on target
Beam energy is 1.5 MeV. Horizontal |
18x |
571
|
Sat Jun 1 16:38:13 2024 |
TD | Offline analysis G22-201/R17 | Offline analysis data file G22-201/R17
Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
|
8x |
570
|
Sat Jun 1 13:33:50 2024 |
TD | Offline analysis APR24/R3 (alpha background) |
Offline analysis data file APR24/R3 (alpha
background)
|
9x |
569
|
Sat Jun 1 07:16:15 2024 |
CB, AB, EM, JM | Run 19 - beam target overlap | Morning shift
08:16 - as run 18, target off
9:00 Increased storage time to |
19x |
568
|
Fri May 31 21:53:20 2024 |
CB EM, JM,EM AB | Overnight beam tests | 22:53
Run 15 started
Beam tests. We increased the storage |
17x |
567
|
Fri May 31 21:03:21 2024 |
CB, EM | Run14 | 22:03
Before this run we checked quickly
beam with the target on but it does not make |
  |
566
|
Fri May 31 19:12:01 2024 |
CB, EM | Run 13 - test with beam | 20:00
The beam is set at the correct
energy, operators cross-checked it again. |
  |
565
|
Fri May 31 06:01:55 2024 |
JM, TY, PW, EM, CB | Run 12 - beam on target | 07:00
Run 12 started. D+ beam is incident
on the target at 1.5 MeV |
12x |
564
|
Thu May 30 13:31:01 2024 |
JM, CB, PW, YL | Run 11 - beam on target overlap | 14:30
Run 11 started. D+ beam in the
ring at 1.5 MeV. |
   |
563
|
Thu May 30 09:30:33 2024 |
CB, PW, YL, TD | Run 10 | 10:30
Merger OK, Tape server OK
ADC data item statistics looks |
13x |
562
|
Thu May 30 08:33:21 2024 |
CB, PW, YL | Run 8 & 9- detector motion tests | 09:34 - Moved to Run 9 in preparation of
moving detectors. No target yet. Beam in
the ring at 750 keV/A. |
7x |
561
|
Thu May 30 07:25:53 2024 |
Yuri, Phil, Nikos | Gas target | The cave is closed and beam is back
The d intensity is about half of
the intensity before the break |
|
560
|
Thu May 30 06:00:51 2024 |
Yuri Nikos ... | Open the cave | Nikos needs to enter the cave to work on
the target cooling.
|
|
559
|
Wed May 29 17:42:06 2024 |
TD | Offline analysis APR24/R2 (pulser walkthrough) | ADC offsets using pulser walkthrough data
from data file APR24/R2
|
17x |
558
|
Wed May 29 16:46:21 2024 |
NP, AB, PM | Run7 - Measurements only with ion beam. | 18:19 Start or run 7: In beam has been
optimzed up to now by Zoran and Claude. ~7E7
particles at injection. From now on, only |
 |
557
|
Wed May 29 09:49:35 2024 |
JM, CB | Threshold changes / D+ beam | 09:00
R4 alpha background continues,
currently R4_12 |
   |
556
|
Wed May 29 08:10:32 2024 |
JM | Run4 - alpha background | 09:00
R4 alpha background continues,
currently R4_12 |
|
555
|
Tue May 28 15:25:21 2024 |
TD, JM, CB | Pulser tests | R3 started
Pulser ON. Approx 2 kHZ.
1.8*w waveforms attachments 1+2 |
    |
|