Wed Jan 10 10:22:41 2024, CB, JM, Some FEEs mounted - issues with Det#2 (bottom left) 
|
Started mounting some FEEs. We ran into some mechanical issues due to the new ERNI connectors on the new flexi-rigid adaptor PCBs. Davide skimmed 6.5
mm off the edge with the groove (the groove is gone). This is suffiicent to support the flexi-rigid and in spite of our earlier concerns, the flexi-rigid
can be mated/un-mated with the FEEs without major alignment issues. |
Tue Feb 22 12:23:23 2022, CB, Slow comparator thresholds lowered - test run
|
13:20 Stopped run.
Slow comp thresh 0x64 -> 0x32 on all FEEs
Checkload x2 |
Thu Jun 22 18:58:02 2023, JM, TD, Slide back onto ring  
|
The wire seal has been tightend further to 160 Nm. Open neg feed-through flange has also been fully tightend.
The CARME chamber was then slid back onto the aluminium frame on the ring. Two carriages were damaged during the sliding process, which have
now been replaced. Carriages were replaced by lifting one end of the upper frame section using the crane by only ~1mm. This was sufficient to slide out |
Wed Sep 8 17:03:07 2021, CB RSS + OG NB, Six feedthrough flanges mounted 23x
|
Continued to mount flanges as per previous ELOG entry.
Peter also remarked that the wires look a bit loose inside the holes, although this is how they were during
dirty tests in Edinburgh.
|
Tue Feb 20 14:12:32 2024, JM, Shutdown
|
CARME DAQ shutdown. FEEs turned OFF and all MIDAS server windows closed.
Detector bias turned OFF.
Final leakage current plot - attachment 1 |
Mon Feb 14 09:56:39 2022, CB, Shifters instructions 2022 10x
|
EMERGENCY SHUTDOWNS
1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)
2. Internal target: Q on keyboard while on workspace 3 of appc218, go to server room, press "CLOSE" button on DUMP. |
Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024
|
EMERGENCY SHUTDOWNS
1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)
2. Internal target: |
Sat May 17 11:19:06 2025, JM, Shifter intructions 2025
|
EMERGENCY SHUTDOWNS
1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)
2. Internal target: |
Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
|
Arrived at the control room to find we had lost connection to the power relay. We rebooted the nnrpi1 and re-connected according to the steps laid out
in elog 471 -> all okay
11:00 Restarted daq with no changes to the system from yesterday. Bias consistent with previous days. All pulser peaks are slightly improved |
Sat Jun 24 10:38:42 2023, JM, TD, Section 9 closed, begin pumping 
|
23/06/23
The CARME chamber and interaction chamber were connected and section 9 has been fully closed. New valves have been installed on the interaction
chamber, in addition to new diamond windows. A leak cart has been connected to the backing line of CARME. Before begining the pumpdown, the manual valve |
Mon Feb 21 21:04:08 2022, SHB, JM, CB, OH (remotely), Schottky RF view from the beam inside
|
|
Sat Apr 5 16:13:32 2025, TD, Saturday 5 April 7x
|
12.00 CARME IE514 ion gauge 4.2e-11 mbar
CARME IE514 OFF
|
Sat Sep 30 10:58:14 2023, TD, Saturday 30 September 9x
|
10.50 CARME IE514 7.14e-10 mbar, ambient temperature 20.8 deg C
CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
|
Fri Apr 26 23:41:16 2024, TD, Saturday 27 April 37x
|
00.34 DAQ continues data file R3_9
|
Sat Feb 26 04:36:38 2022, RSS TD, Saturday 26 February 07:00-15:00 27x
|
05:36 E4 pressure c. 1.7e-9mbar *not* 3e-10mbar as reported earlier
See attachments 1 & 2
E4 pressure not < 5e-10mbar - wait to startup gas jet target
|
Mon Jan 22 16:29:31 2024, TD, Saturday 20 January 30x
|
11.00 No WLAN/WiFi
came-gsi private LAN appears to be OK
|
Sat May 13 11:34:25 2023, TD, RSS, Saturday 13 May
|
12.34 DSSSD#3 bias -149.95V leakage current -6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
|
Tue Oct 5 11:44:11 2021, CB, TD , SAES manuals & cable drawings 8x
|
NEG power
SIP power
UHV1400 operating instructions |
Tue Aug 18 17:35:20 2020, TD, SAES UHV1400 pin assignment    
|
Using a digital multimeter confirmed continuity for SAES-supplied
power cable (Amphenol (circular) 6-pin plug to Han 05 plug) for
the following pins
|
Mon Jun 16 21:58:00 2025, CB AR, Runs 84-89
|
Found all Merger Links background black - inactive. Nontheless the tapeservice was working, the data rate to disk was normal, and the file was being
written and the histograms were being updated.
Decided to stop DAQ, stop Merger, restart merger. Links rest to green background - but no more writing to disk! |