Entry  Wed Jan 10 10:22:41 2024, CB, JM, Some FEEs mounted - issues with Det#2 (bottom left) Screenshot_2024-01-10_11-59-39.pngScreenshot_2024-01-10_12-56-36.png
Started mounting some FEEs. We ran into some mechanical issues due to the new ERNI connectors on the new flexi-rigid adaptor PCBs. Davide skimmed 6.5
mm off the edge with the groove (the groove is gone). This is suffiicent to support the flexi-rigid and in spite of our earlier concerns, the flexi-rigid
can be mated/un-mated with the FEEs without major alignment issues.
Entry  Tue Feb 22 12:23:23 2022, CB, Slow comparator thresholds lowered - test run 
13:20 Stopped run.

Slow comp thresh 0x64 -> 0x32 on all FEEs

Checkload x2
Entry  Thu Jun 22 18:58:02 2023, JM, TD, Slide back onto ring 20230622_112534.jpg20230622_112827.jpg20230622_120307.jpg
The wire seal has been tightend further to 160 Nm. Open neg feed-through flange has also been fully tightend. 

The CARME chamber was then slid back onto the aluminium frame on the ring. Two carriages were damaged during the sliding process, which have
now been replaced. Carriages were replaced by lifting one end of the upper frame section using the crane by only ~1mm. This was sufficient to slide out
Entry  Wed Sep 8 17:03:07 2021, CB RSS + OG NB, Six feedthrough flanges mounted 23x
Continued to mount flanges as per previous ELOG entry.
Peter also remarked that the wires look a bit loose inside the holes, although this is how they were during
dirty tests in Edinburgh.
Entry  Tue Feb 20 14:12:32 2024, JM, Shutdown Screenshot_from_2024-02-20_15-11-40.png
CARME DAQ shutdown. FEEs turned OFF and all MIDAS server windows closed.

Detector bias turned OFF.

Final leakage current plot - attachment 1
Entry  Mon Feb 14 09:56:39 2022, CB, Shifters instructions 2022 10x
EMERGENCY SHUTDOWNS

1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)

2. Internal target: Q on keyboard while on workspace 3 of appc218, go to server room, press "CLOSE" button on DUMP.
Entry  Thu Feb 8 11:22:28 2024, JM, Shifters instruction 2024 
EMERGENCY SHUTDOWNS

1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)

2. Internal target:
Entry  Sat May 17 11:19:06 2025, JM, Shifter intructions 2025 
EMERGENCY SHUTDOWNS

1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)

2. Internal target:
Entry  Thu Feb 1 10:04:11 2024, JM, CB, Shaping time testing 31x
Arrived at the control room to find we had lost connection to the power relay. We rebooted the nnrpi1 and re-connected according to the steps laid out
in elog 471 -> all okay

11:00 Restarted daq with no changes to the system from yesterday. Bias consistent with previous days. All pulser peaks are slightly improved
Entry  Sat Jun 24 10:38:42 2023, JM, TD, Section 9 closed, begin pumping  23-06-23-VI.png24-06-23-VI.png
23/06/23

The CARME chamber and interaction chamber were connected and section 9 has been fully closed. New valves have been installed on the interaction
chamber, in addition to new diamond windows. A leak cart has been connected to the backing line of CARME. Before begining the pumpdown, the manual valve
Entry  Mon Feb 21 21:04:08 2022, SHB, JM, CB, OH (remotely), Schottky RF view from the beam inside pio-2022.02.21.21.54.46.895.PNG
 
Entry  Sat Apr 5 16:13:32 2025, TD, Saturday 5 April 7x

12.00 CARME IE514 ion gauge 4.2e-11 mbar
      CARME IE514 OFF
Entry  Sat Sep 30 10:58:14 2023, TD, Saturday 30 September 9x
10.50 CARME IE514 7.14e-10 mbar, ambient temperature 20.8 deg C

      CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
Entry  Fri Apr 26 23:41:16 2024, TD, Saturday 27 April 37x

00.34 DAQ continues data file R3_9
Entry  Sat Feb 26 04:36:38 2022, RSS TD, Saturday 26 February 07:00-15:00 27x
05:36 E4 pressure c. 1.7e-9mbar *not* 3e-10mbar as reported earlier
      See attachments 1 & 2
      E4 pressure not < 5e-10mbar - wait to startup gas jet target
Entry  Mon Jan 22 16:29:31 2024, TD, Saturday 20 January 30x
11.00 No WLAN/WiFi
      came-gsi private LAN appears to be OK
Entry  Sat May 13 11:34:25 2023, TD, RSS, Saturday 13 May 

12.34 DSSSD#3 bias -149.95V leakage current -6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )
Entry  Tue Oct 5 11:44:11 2021, CB, TD , SAES manuals & cable drawings 8x
NEG power
SIP power
UHV1400 operating instructions
Entry  Tue Aug 18 17:35:20 2020, TD, SAES UHV1400 pin assignment NEG_POWER_user_manual.pdf20200813_121944_(1).jpg20200813_134548.jpgRFKIT9904220_(2).pdfRFKIT9905220_(2).pdf
Using a digital multimeter confirmed continuity for SAES-supplied 
power cable (Amphenol (circular) 6-pin plug to Han 05 plug) for
the following pins
Entry  Mon Jun 16 21:58:00 2025, CB AR, Runs 84-89 
Found all Merger Links background black - inactive. Nontheless the tapeservice was working, the data rate to disk was normal, and the file was being
written and the histograms were being updated.

Decided to stop DAQ, stop Merger, restart merger. Links rest to green background - but no more writing to disk!