AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 8 of 38  ELOG logo
  ID Date Author Subjectdown Text Attachments
  462   Wed Jan 10 10:22:41 2024 CB, JMSome FEEs mounted - issues with Det#2 (bottom left)Started mounting some FEEs. We ran into
some mechanical issues due to the new ERNI
connectors on the new flexi-rigid adaptor
 Screenshot_2024-01-10_11-59-39.pngScreenshot_2024-01-10_12-56-36.png 
  236   Tue Feb 22 12:23:23 2022 CBSlow comparator thresholds lowered - test run13:20 Stopped run.

Slow comp thresh 0x64 -> 0x32
on all FEEs
  
  407   Thu Jun 22 18:58:02 2023 JM, TDSlide back onto ringThe wire seal has been tightend further
to 160 Nm. Open neg feed-through flange has
also been fully tightend. 
 20230622_112534.jpg20230622_112827.jpg20230622_120307.jpg 
  64   Wed Sep 8 17:03:07 2021 CB RSS + OG NBSix feedthrough flanges mountedContinued to mount flanges as per previous
ELOG entry.
Peter also remarked that the wires look a
 23x 
  538   Tue Feb 20 14:12:32 2024 JMShutdownCARME DAQ shutdown. FEEs turned OFF and
all MIDAS server windows closed.

Detector bias turned OFF.
 Screenshot_from_2024-02-20_15-11-40.png 
  194   Mon Feb 14 09:56:39 2022 CBShifters instructions 2022EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
 10x 
  498   Thu Feb 8 11:22:28 2024 JMShifters instruction 2024EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
  
  684   Sat May 17 11:19:06 2025 JMShifter intructions 2025EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
  
  484   Thu Feb 1 10:04:11 2024 JM, CBShaping time testingArrived at the control room to find we
had lost connection to the power relay. We
rebooted the nnrpi1 and re-connected according
 31x 
  408   Sat Jun 24 10:38:42 2023 JM, TDSection 9 closed, begin pumping 23/06/23

The CARME chamber and interaction
chamber were connected and section 9 has
 23-06-23-VI.png24-06-23-VI.png 
  222   Mon Feb 21 21:04:08 2022 SHB, JM, CB, OH (remotely)Schottky RF view from the beam inside   pio-2022.02.21.21.54.46.895.PNG 
  662   Sat Apr 5 16:13:32 2025 TDSaturday 5 April
12.00 CARME IE514 ion gauge 4.2e-11 mbar
      CARME IE514 OFF
 7x 
  449   Sat Sep 30 10:58:14 2023 TDSaturday 30 September10.50 CARME IE514 7.14e-10 mbar, ambient temperature
20.8 deg C
 9x 
  548   Fri Apr 26 23:41:16 2024 TDSaturday 27 April
00.34 DAQ continues data file R3_9
 37x 
  287   Sat Feb 26 04:36:38 2022 RSS TDSaturday 26 February 07:00-15:0005:36 E4 pressure c. 1.7e-9mbar *not* 3e-10mbar
as reported earlier
      See attachments 1 & 2
 27x 
  477   Mon Jan 22 16:29:31 2024 TDSaturday 20 January11.00 No WLAN/WiFi
      came-gsi private LAN appears to be
OK
 30x 
  399   Sat May 13 11:34:25 2023 TD, RSSSaturday 13 May
12.34 DSSSD#3 bias -149.95V leakage current
-6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
  
  107   Tue Oct 5 11:44:11 2021 CB, TD SAES manuals & cable drawingsNEG power
SIP power
UHV1400 operating instructions
 8x 
  3   Tue Aug 18 17:35:20 2020 TDSAES UHV1400 pin assignmentUsing a digital multimeter confirmed continuity
for SAES-supplied 
power cable (Amphenol (circular) 6-pin plug
 NEG_POWER_user_manual.pdf20200813_121944_(1).jpg20200813_134548.jpgRFKIT9904220_(2).pdfRFKIT9905220_(2).pdf 
  751   Mon Jun 16 21:58:00 2025 CB ARRuns 84-89Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal,
  
ELOG V3.1.4-unknown