|
ID |
Date |
Author |
Subject |
Text |
 |
|
462
|
Wed Jan 10 10:22:41 2024 |
CB, JM | Some FEEs mounted - issues with Det#2 (bottom left) | Started mounting some FEEs. We ran into
some mechanical issues due to the new ERNI
connectors on the new flexi-rigid adaptor |
 |
|
236
|
Tue Feb 22 12:23:23 2022 |
CB | Slow comparator thresholds lowered - test run | 13:20 Stopped run.
Slow comp thresh 0x64 -> 0x32
on all FEEs |
|
|
407
|
Thu Jun 22 18:58:02 2023 |
JM, TD | Slide back onto ring | The wire seal has been tightend further
to 160 Nm. Open neg feed-through flange has
also been fully tightend. |
  |
|
64
|
Wed Sep 8 17:03:07 2021 |
CB RSS + OG NB | Six feedthrough flanges mounted | Continued to mount flanges as per previous
ELOG entry.
Peter also remarked that the wires look a |
23x |
|
538
|
Tue Feb 20 14:12:32 2024 |
JM | Shutdown | CARME DAQ shutdown. FEEs turned OFF and
all MIDAS server windows closed.
Detector bias turned OFF. |
|
|
194
|
Mon Feb 14 09:56:39 2022 |
CB | Shifters instructions 2022 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
10x |
|
498
|
Thu Feb 8 11:22:28 2024 |
JM | Shifters instruction 2024 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
|
|
684
|
Sat May 17 11:19:06 2025 |
JM | Shifter intructions 2025 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
|
|
484
|
Thu Feb 1 10:04:11 2024 |
JM, CB | Shaping time testing | Arrived at the control room to find we
had lost connection to the power relay. We
rebooted the nnrpi1 and re-connected according |
31x |
|
408
|
Sat Jun 24 10:38:42 2023 |
JM, TD | Section 9 closed, begin pumping | 23/06/23
The CARME chamber and interaction
chamber were connected and section 9 has |
 |
|
222
|
Mon Feb 21 21:04:08 2022 |
SHB, JM, CB, OH (remotely) | Schottky RF view from the beam inside | |
|
|
662
|
Sat Apr 5 16:13:32 2025 |
TD | Saturday 5 April |
12.00 CARME IE514 ion gauge 4.2e-11 mbar
CARME IE514 OFF
|
7x |
|
449
|
Sat Sep 30 10:58:14 2023 |
TD | Saturday 30 September | 10.50 CARME IE514 7.14e-10 mbar, ambient temperature
20.8 deg C
|
9x |
|
548
|
Fri Apr 26 23:41:16 2024 |
TD | Saturday 27 April |
00.34 DAQ continues data file R3_9
|
37x |
|
287
|
Sat Feb 26 04:36:38 2022 |
RSS TD | Saturday 26 February 07:00-15:00 | 05:36 E4 pressure c. 1.7e-9mbar *not* 3e-10mbar
as reported earlier
See attachments 1 & 2
|
27x |
|
477
|
Mon Jan 22 16:29:31 2024 |
TD | Saturday 20 January | 11.00 No WLAN/WiFi
came-gsi private LAN appears to be
OK
|
30x |
|
399
|
Sat May 13 11:34:25 2023 |
TD, RSS | Saturday 13 May |
12.34 DSSSD#3 bias -149.95V leakage current
-6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php |
|
|
107
|
Tue Oct 5 11:44:11 2021 |
CB, TD | SAES manuals & cable drawings | NEG power
SIP power
UHV1400 operating instructions |
8x |
|
3
|
Tue Aug 18 17:35:20 2020 |
TD | SAES UHV1400 pin assignment | Using a digital multimeter confirmed continuity
for SAES-supplied
power cable (Amphenol (circular) 6-pin plug |
    |
|
751
|
Mon Jun 16 21:58:00 2025 |
CB AR | Runs 84-89 | Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal, |
|