AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 9 of 34  ELOG logo
ID Date Authordown Subject Text Attachments
  208   Fri Feb 18 08:58:08 2022 RSS, ML, CBAlpha background run4610:00

 

Check Leakage current: (see attachment
 11x 
  209   Fri Feb 18 11:07:52 2022 RSS, ML, CBAlpha background run4612:00

 

Check Leakage current: (see attachment
 11x 
  210   Fri Feb 18 13:03:02 2022 RSS, ML, CBAlpha background run4614:00

 

Check Leakage current: (see attachment
 11x 
  195   Tue Feb 15 10:46:37 2022 RSS, LV, CBAlpha background run3711:30

Check Fee temperatures: all green
(see attachment 1)
 10x 
  617   Tue Jun 11 12:26:07 2024 RSS, JS, JM, CBRun 62 - Beam optimization + Target changeBeam optimization and target change   
  627   Thu Jun 13 23:01:07 2024 RSS, JS, EHRun 67 - Night shiftRun 67

00:01


      DSSSD bias & leakage
 20x 
  215   Mon Feb 21 08:05:45 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
  
  216   Mon Feb 21 09:07:37 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
  
  217   Mon Feb 21 10:59:48 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
  
  218   Mon Feb 21 12:10:47 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
 220221_1506_aida03_1*W.png 
  611   Mon Jun 10 12:49:56 2024 RSS, DB, CB, JM R58 Space Charge Test
13:53

      DSSSD bias & leakage
current OK - attachment 1

      FEE64
temperatures OK - attachment 2

      ADC
 Screenshot_from_2024-06-10_13-52-45.pngScreenshot_from_2024-06-10_13-53-04.pngScreenshot_from_2024-06-10_13-53-17.pngScreenshot_from_2024-06-10_13-53-28.png 
  610   Mon Jun 10 07:40:47 2024 RSS, DBBeam08:26: There is no beam and Gleb is informed.

08:46: Beam is back.
  
  634   Fri Jun 14 22:18:18 2024 RSS, CB, USRun 73Beam is back.New run started.

 

Cooler voltage setpoint 247.3 V.
 20x 
  203   Thu Feb 17 08:31:07 2022 RSS, AGAlpha background run4309:15

Check Leakage current: (see attachment
2)
 11x 
  204   Thu Feb 17 13:12:19 2022 RSS, AGAlpha background run4314:00

 

Check Leakage current: (see attachment
 11x 
  116   Mon Oct 11 11:24:16 2021 RSS TD MLValve support and cable labelingSplit funnels were given to Oemer for cleaning.
Have received them back after lunch.

Valve support is installed again
 IMG_4962.JPGIMG_4969.JPG.svgIMG_4968.JPG.svg 
  117   Tue Oct 12 09:22:37 2021 RSS TD + OG DRMotors problem solvedNeg and ion cables were taken off and were
put in the box.

Top support was taken off.
 IMG_4971.JPGIMG_4970.JPG 
  122   Wed Oct 13 15:28:22 2021 RSS TD + OGSplit funnelsSplit funnels installed on 4 (of 8) 2x78
way D connector feed-throughs.
 7x 
  150   Wed Nov 10 18:38:16 2021 RSS TD + ML OG AK NKCARME wrapped in heating tapeHeating and electronic experts were in
CRYRING and were unhappy with the damaged
wire. Heaters were opened by OG, but no damage
 IMG_5514(1).JPGIMG_5517(1).JPGIMG_5518.JPGIMG_5520.JPGIMG_5521(1).JPG 
  124   Fri Oct 15 19:37:12 2021 RSS TD + DRFriday 15 OctoberRing seal is out. See picture 1.

Bellow (towards CARME) was installed
in the gas jet chamber. Attached are some
 8x 
ELOG V3.1.4-unknown