ID Date Authordown Subject
  209   Fri Feb 18 11:07:52 2022 RSS, ML, CBAlpha background run46

12:00

 

Check Leakage current: (see attachment 4)

Check NewMerger tab: (see attachment 2)

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 9)

                                 ADC coincidence-info #8 (see attachment 8)

                                 Good events (see attachment 7)

 Check Spectrum Browser tab: (see attachment 10)                 

Check the following plots:

                                         LowEnergyXYTotalDSSD0 (see attachment 11)

                                         LowEnergyExTotal (see attachment 5)

                                         LowEnergyEyTotal (see attachment 6)

                                        

                                       

Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 3)

Attachment 1: temp-2022-02-18_12-01-21.png
temp-2022-02-18_12-01-21.png
Attachment 2: merger-2022-02-18_12-00-10.png
merger-2022-02-18_12-00-10.png
Attachment 3: system-2022-02-18_12-01-52.png
system-2022-02-18_12-01-52.png
Attachment 4: leakage-2022-02-18_12-00-43.png
leakage-2022-02-18_12-00-43.png
Attachment 5: energy-ex-2022-02-18_12-07-07.png
energy-ex-2022-02-18_12-07-07.png
Attachment 6: energy-ey-2022-02-18_12-05-29.png
energy-ey-2022-02-18_12-05-29.png
Attachment 7: good-event-2022-02-18_12-02-49.png
good-event-2022-02-18_12-02-49.png
Attachment 8: correlation-2022-02-18_12-03-19.png
correlation-2022-02-18_12-03-19.png
Attachment 9: adc-data-item2022-02-18_12-02-25.png
adc-data-item2022-02-18_12-02-25.png
Attachment 10: spectrum_browser-2022-02-18_12-03-55.png
spectrum_browser-2022-02-18_12-03-55.png
Attachment 11: energy-xy-total-2022-02-18_12-14-29.png
energy-xy-total-2022-02-18_12-14-29.png
  210   Fri Feb 18 13:03:02 2022 RSS, ML, CBAlpha background run46

14:00

 

Check Leakage current: (see attachment 4)

Check NewMerger tab: (see attachment 2)

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 11)

                                 ADC coincidence-info #8 (see attachment 10)

                                 Good events (see attachment 9)

 Check Spectrum Browser tab: (see attachment 6)                 

Check the following plots:

                                         LowEnergyXYTotalDSSD0 (see attachment 7)

                                         LowEnergyExTotal (see attachment 8)

                                         LowEnergyEyTotal (see attachment 5)

                                        

                                       

Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 3)

Data taking was stopped at 14:04.

Attachment 1: temp-2022-02-18_13-59-30.png
temp-2022-02-18_13-59-30.png
Attachment 2: merger-2022-02-18_13-58-41.png
merger-2022-02-18_13-58-41.png
Attachment 3: system-2022-02-18_13-59-57.png
system-2022-02-18_13-59-57.png
Attachment 4: leakage-2022-02-18_13-59-02.png
leakage-2022-02-18_13-59-02.png
Attachment 5: ey-total-2022-02-18_13-57-46.png
ey-total-2022-02-18_13-57-46.png
Attachment 6: spectrum-2022-02-18_14-02-02.png
spectrum-2022-02-18_14-02-02.png
Attachment 7: xy-total-2022-02-18_14-02-23.png
xy-total-2022-02-18_14-02-23.png
Attachment 8: ex-energy-2022-02-18_13-56-32.png
ex-energy-2022-02-18_13-56-32.png
Attachment 9: good-event-2022-02-18_14-00-53.png
good-event-2022-02-18_14-00-53.png
Attachment 10: correlation-2022-02-18_14-00-27.png
correlation-2022-02-18_14-00-27.png
Attachment 11: adc-data-item-2022-02-18_14-01-17.png
adc-data-item-2022-02-18_14-01-17.png
  195   Tue Feb 15 10:46:37 2022 RSS, LV, CBAlpha background run37

11:30

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 2)

                                 Good events (see attachment 3)

                                  ADC coincidence-info #8 (see attachment 4)

Check NewMerger tab: (see attachment 5)

Check Leakage current: (see attachment 6)

Check the following plots: LowEnergyExTotal (see attachment 7)

                                         LowEnergyEyTotal (see attachment 8)

                                         LowEnergyXYTotalDSSD0 (see attachment 9)

Check Spectrum Browser tab: (see attachment 10)

Check system wide checks tab: all okay.

All is good.

Attachment 1: temp_2022-02-15_11-24-49.png
temp_2022-02-15_11-24-49.png
Attachment 2: stats_2022-02-15_11-26-15.png
stats_2022-02-15_11-26-15.png
Attachment 3: good_events_2022-02-15_11-29-02.png
good_events_2022-02-15_11-29-02.png
Attachment 4: correlation_8_2022-02-15_11-28-28.png
correlation_8_2022-02-15_11-28-28.png
Attachment 5: merger_2022-02-15_11-30-38.png
merger_2022-02-15_11-30-38.png
Attachment 6: leakage_current2022-02-15_11-30-57.png
leakage_current2022-02-15_11-30-57.png
Attachment 7: lowEnergyExTotal_2022-02-15_11-35-24.png
lowEnergyExTotal_2022-02-15_11-35-24.png
Attachment 8: lowEnergyEy_2022-02-15_11-38-00.png
lowEnergyEy_2022-02-15_11-38-00.png
Attachment 9: lowEnergyXYTotal_2022-02-15_11-41-42.png
lowEnergyXYTotal_2022-02-15_11-41-42.png
Attachment 10: spectrum_browser_2022-02-15_11-27-05.png
spectrum_browser_2022-02-15_11-27-05.png
  617   Tue Jun 11 12:26:07 2024 RSS, JS, JM, CBRun 62 - Beam optimization + Target change

Beam optimization and target change

  627   Thu Jun 13 23:01:07 2024 RSS, JS, EHRun 67 - Night shift

Run 67

00:01

      DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

      ADC data item stats OK - attachment 3

      per FEE64 Rate spectra OK - attachment 4

           Beam intensity 5.7E7 particles

           Target density - 4.98E11 atoms/cm2

 

02:01

      DSSSD bias & leakage current OK - attachment 5

      FEE64 temperatures OK - attachment 6

      ADC data item stats OK - attachment 7

      per FEE64 Rate spectra OK - attachment 8

           Beam intensity 5.8E7 particles

           Target density - 4.39E11 atoms/cm2

 

04:00

      DSSSD bias & leakage current OK - attachment 9

      FEE64 temperatures OK - attachment 10

      ADC data item stats OK - attachment 11

      per FEE64 Rate spectra OK - attachment 12

           Beam intensity 4.1E7 particles

           Target density - 3.57E11 atoms/cm2

 

06:00

      DSSSD bias & leakage current OK - attachment 13

      FEE64 temperatures OK - attachment 14

      ADC data item stats OK - attachment 15

      per FEE64 Rate spectra OK - attachment 16

           Beam intensity 3.7E7 particles

           Target density - 3.89E11 atoms/cm2

08:00

          The orbit adjustments started. The detectors moved out. One of these showed rates of about 20kHz. but after moving it in and out again it returned to normal.

11:00

      DSSSD bias & leakage current OK - attachment 17

      FEE64 temperatures OK - attachment 18

      ADC data item stats OK - attachment 19

      per FEE64 Rate spectra OK - attachment 20

           Beam intensity 4.9E7 particles

           Target density - 5.27E11 atoms/cm2

Attachment 1: Screenshot_from_2024-06-14_00-02-01.png
Screenshot_from_2024-06-14_00-02-01.png
Attachment 2: Screenshot_from_2024-06-14_00-02-20.png
Screenshot_from_2024-06-14_00-02-20.png
Attachment 3: Screenshot_from_2024-06-14_00-02-31.png
Screenshot_from_2024-06-14_00-02-31.png
Attachment 4: Screenshot_from_2024-06-14_00-02-40.png
Screenshot_from_2024-06-14_00-02-40.png
Attachment 5: Screenshot_from_2024-06-14_02-00-42.png
Screenshot_from_2024-06-14_02-00-42.png
Attachment 6: Screenshot_from_2024-06-14_02-00-58.png
Screenshot_from_2024-06-14_02-00-58.png
Attachment 7: Screenshot_from_2024-06-14_02-01-04.png
Screenshot_from_2024-06-14_02-01-04.png
Attachment 8: Screenshot_from_2024-06-14_02-01-13.png
Screenshot_from_2024-06-14_02-01-13.png
Attachment 9: Screenshot_from_2024-06-14_04-00-08.png
Screenshot_from_2024-06-14_04-00-08.png
Attachment 10: Screenshot_from_2024-06-14_04-00-26.png
Screenshot_from_2024-06-14_04-00-26.png
Attachment 11: Screenshot_from_2024-06-14_04-00-38.png
Screenshot_from_2024-06-14_04-00-38.png
Attachment 12: Screenshot_from_2024-06-14_04-00-52.png
Screenshot_from_2024-06-14_04-00-52.png
Attachment 13: Screenshot_from_2024-06-14_06-00-15.png
Screenshot_from_2024-06-14_06-00-15.png
Attachment 14: Screenshot_from_2024-06-14_06-00-31.png
Screenshot_from_2024-06-14_06-00-31.png
Attachment 15: Screenshot_from_2024-06-14_06-00-42.png
Screenshot_from_2024-06-14_06-00-42.png
Attachment 16: Screenshot_from_2024-06-14_06-00-51.png
Screenshot_from_2024-06-14_06-00-51.png
Attachment 17: Screenshot_from_2024-06-14_10-53-10.png
Screenshot_from_2024-06-14_10-53-10.png
Attachment 18: Screenshot_from_2024-06-14_10-53-54.png
Screenshot_from_2024-06-14_10-53-54.png
Attachment 19: Screenshot_from_2024-06-14_10-54-28.png
Screenshot_from_2024-06-14_10-54-28.png
Attachment 20: Screenshot_from_2024-06-14_10-55-05.png
Screenshot_from_2024-06-14_10-55-05.png
  215   Mon Feb 21 08:05:45 2022 RSS, JGAlpha background run50

Beam OFF. Run started 20/2/22 18:42

System checck OK, except white rabbit all fail

Temperatures OK

Leakage current 3.57 uA.

potentiometer = 20.28 mm

 

  216   Mon Feb 21 09:07:37 2022 RSS, JGAlpha background run50

Beam OFF. Run started 20/2/22 18:42

System checck OK, except white rabbit all fail

Temperatures OK

Leakage current 3.57 uA.

potentiometer = 20.28 mm

 

  217   Mon Feb 21 10:59:48 2022 RSS, JGAlpha background run50

Beam OFF. Run started 20/2/22 18:42

System checck OK, except white rabbit all fail

Temperatures OK

Leakage current 3.59 uA.

potentiometer = 20.28 mm

 

11:36 OH noticed a channel in aida03 was running hot. Did an asic load check and rate returned to normal.

          Online monitor also restarted.

 

  218   Mon Feb 21 12:10:47 2022 RSS, JGAlpha background run50

Beam OFF. Run started 20/2/22 18:42

System checck OK, except white rabbit all fail

Temperatures OK

Leakage current 3.59 uA.

potentiometer = 20.28 mm

 

11:36 OH noticed a channel in aida03 was running hot. Did an asic load check and rate returned to normal.

          Online monitor also restarted.

 

15:06 Investigating the high rate in aida03 ASIC01 channel 11.
          Looking at the waveforms it seems channel 11 is consistently different.
          Attachment 1 shows a typical waveform for it

 

Attachment 1: 220221_1506_aida03_1*W.png
220221_1506_aida03_1*W.png
  611   Mon Jun 10 12:49:56 2024 RSS, DB, CB, JM R58 Space Charge Test
13:53

      DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2

      ADC data item stats - attachment 3

      per FEE64 Rate spectra - attachment 4
      
      Beam intensity - ~ 5.0E7 pps

      Target density - off

         

Attachment 1: Screenshot_from_2024-06-10_13-52-45.png
Screenshot_from_2024-06-10_13-52-45.png
Attachment 2: Screenshot_from_2024-06-10_13-53-04.png
Screenshot_from_2024-06-10_13-53-04.png
Attachment 3: Screenshot_from_2024-06-10_13-53-17.png
Screenshot_from_2024-06-10_13-53-17.png
Attachment 4: Screenshot_from_2024-06-10_13-53-28.png
Screenshot_from_2024-06-10_13-53-28.png
  610   Mon Jun 10 07:40:47 2024 RSS, DBBeam

08:26: There is no beam and Gleb is informed.

08:46: Beam is back.

  634   Fri Jun 14 22:18:18 2024 RSS, CB, USRun 73

Beam is back.New run started.

 

Cooler voltage setpoint 247.3 V.

 

23:18

DSSSD bias & leakage current OK 

FEE64 temperatures OK 

ADC data item stats OK 

per FEE64 Rate spectra OK 

Beam intensity 6e+7 particles

Target density ~4E10 atoms/cm2

 

01:01

DSSSD bias & leakage current OK - attachment 1 & 5

FEE64 temperatures OK - attachment 2

ADC data item stats OK - attachment 3

per FEE64 Rate spectra OK - attachment 4

Beam intensity 7e+7 particles

Target density ~5E11 atoms/cm2

 

03:03

DSSSD bias & leakage current OK - attachment 6 & 7

FEE64 temperatures OK - attachment 8

ADC data item stats OK - attachment 9

per FEE64 Rate spectra OK - attachment 10

Beam intensity 7e+7 particles

Target density ~4E11 atoms/cm2

 

05:00

DSSSD bias & leakage current OK - attachment 11 & 15

FEE64 temperatures OK - attachment 12

ADC data item stats OK - attachment 13

per FEE64 Rate spectra OK - attachment 14

Beam intensity 7.4e+7 particles

Target density ~5E11 atoms/cm2

 

05:15

Turbo frequency went below 810 Hz. Set temperature increased from 38.8 K to 39.0 K.

 

06:50

DSSSD bias & leakage current OK - attachment 16 & 17

FEE64 temperatures OK - attachment 18

ADC data item stats OK - attachment 19

per FEE64 Rate spectra OK - attachment 20

Beam intensity 7.5e+7 particles

Target density ~2.3E11 atoms/cm2
Attachment 1: Screenshot_from_2024-06-15_00-59-40.png
Screenshot_from_2024-06-15_00-59-40.png
Attachment 2: Screenshot_from_2024-06-15_00-59-53.png
Screenshot_from_2024-06-15_00-59-53.png
Attachment 3: Screenshot_from_2024-06-15_01-00-03.png
Screenshot_from_2024-06-15_01-00-03.png
Attachment 4: Screenshot_from_2024-06-15_01-00-12.png
Screenshot_from_2024-06-15_01-00-12.png
Attachment 5: Screenshot_from_2024-06-15_01-00-20.png
Screenshot_from_2024-06-15_01-00-20.png
Attachment 6: Screenshot_from_2024-06-15_03-03-21.png
Screenshot_from_2024-06-15_03-03-21.png
Attachment 7: Screenshot_from_2024-06-15_03-03-41.png
Screenshot_from_2024-06-15_03-03-41.png
Attachment 8: Screenshot_from_2024-06-15_03-03-49.png
Screenshot_from_2024-06-15_03-03-49.png
Attachment 9: Screenshot_from_2024-06-15_03-04-00.png
Screenshot_from_2024-06-15_03-04-00.png
Attachment 10: Screenshot_from_2024-06-15_03-04-08.png
Screenshot_from_2024-06-15_03-04-08.png
Attachment 11: Screenshot_from_2024-06-15_05-00-41.png
Screenshot_from_2024-06-15_05-00-41.png
Attachment 12: Screenshot_from_2024-06-15_05-01-00.png
Screenshot_from_2024-06-15_05-01-00.png
Attachment 13: Screenshot_from_2024-06-15_05-01-14.png
Screenshot_from_2024-06-15_05-01-14.png
Attachment 14: Screenshot_from_2024-06-15_05-01-23.png
Screenshot_from_2024-06-15_05-01-23.png
Attachment 15: Screenshot_from_2024-06-15_05-01-34.png
Screenshot_from_2024-06-15_05-01-34.png
Attachment 16: Screenshot_from_2024-06-15_06-49-51.png
Screenshot_from_2024-06-15_06-49-51.png
Attachment 17: Screenshot_from_2024-06-15_06-49-57.png
Screenshot_from_2024-06-15_06-49-57.png
Attachment 18: Screenshot_from_2024-06-15_06-50-13.png
Screenshot_from_2024-06-15_06-50-13.png
Attachment 19: Screenshot_from_2024-06-15_06-50-25.png
Screenshot_from_2024-06-15_06-50-25.png
Attachment 20: Screenshot_from_2024-06-15_06-50-33.png
Screenshot_from_2024-06-15_06-50-33.png
  203   Thu Feb 17 08:31:07 2022 RSS, AGAlpha background run43

09:15

Check Leakage current: (see attachment 2)

Check NewMerger tab: (see attachment 5)

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 4)

                                 ADC coincidence-info #8 (see attachment 6)

                                 Good events (see attachment 7)

 Check Spectrum Browser tab: (see attachment 10)                 

Check the following plots:

                                         LowEnergyXYTotalDSSD0 (see attachment 3)

                                         LowEnergyExTotal (see attachment 8)

                                         LowEnergyEyTotal (see attachment 9)

                                        

                                       

Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 11)

 

Attachment 1: temp-2022-02-17_09-16-02.png
temp-2022-02-17_09-16-02.png
Attachment 2: leakage-2022-02-17_09-14-47.png
leakage-2022-02-17_09-14-47.png
Attachment 3: XY-Total-2022-02-17_09-30-30.png
XY-Total-2022-02-17_09-30-30.png
Attachment 4: data-items-2022-02-17_09-24-58.png
data-items-2022-02-17_09-24-58.png
Attachment 5: new-merger-2022-02-17_09-14-00.png
new-merger-2022-02-17_09-14-00.png
Attachment 6: correlation-2022-02-17_09-24-05.png
correlation-2022-02-17_09-24-05.png
Attachment 7: good-events-2022-02-17_09-21-48.png
good-events-2022-02-17_09-21-48.png
Attachment 8: lowEnergy-Ex-2022-02-17_09-26-36.png
lowEnergy-Ex-2022-02-17_09-26-36.png
Attachment 9: lowEnergy-Ey-2022-02-17_09-27-46.png
lowEnergy-Ey-2022-02-17_09-27-46.png
Attachment 10: spectrum-browser-2022-02-17_09-25-45.png
spectrum-browser-2022-02-17_09-25-45.png
Attachment 11: IMG_6932.JPG
IMG_6932.JPG
  204   Thu Feb 17 13:12:19 2022 RSS, AGAlpha background run43

14:00

 

Check Leakage current: (see attachment 1)

Check NewMerger tab: (see attachment 3)

Check Fee temperatures: all green (see attachment 5)

Check statistics tab: ADC data items (see attachment 2)

                                 ADC coincidence-info #8 (see attachment 6)

                                 Good events (see attachment 4)

 Check Spectrum Browser tab: (see attachment 10)                 

Check the following plots:

                                         LowEnergyXYTotalDSSD0 (see attachment 9)

                                         LowEnergyExTotal (see attachment 7)

                                         LowEnergyEyTotal (see attachment 8)

                                        

                                       

Check system wide checks tab: White Rabbit error counter test result: Passed 0, Failed 5 (see attachment 11)

Attachment 1: leakage_2022-02-17_13-58-44.png
leakage_2022-02-17_13-58-44.png
Attachment 2: data_item_2022-02-17_14-02-32.png
data_item_2022-02-17_14-02-32.png
Attachment 3: new-merger-2022-02-17_13-57-51.png
new-merger-2022-02-17_13-57-51.png
Attachment 4: good_events_2022-02-17_14-01-53.png
good_events_2022-02-17_14-01-53.png
Attachment 5: temperature_2022-02-17_13-59-30.png
temperature_2022-02-17_13-59-30.png
Attachment 6: correlation_8_2022-02-17_14-01-13.png
correlation_8_2022-02-17_14-01-13.png
Attachment 7: energy_ex_total_2022-02-17_14-06-46.png
energy_ex_total_2022-02-17_14-06-46.png
Attachment 8: energy_ey_total_2022-02-17_14-08-06.png
energy_ey_total_2022-02-17_14-08-06.png
Attachment 9: energy-xy-total-2022-02-17_14-11-42.png
energy-xy-total-2022-02-17_14-11-42.png
Attachment 10: spectrum_browser_2022-02-17_14-03-27.png
spectrum_browser_2022-02-17_14-03-27.png
Attachment 11: system_wide_checks_2022-02-17_14-00-31.png
system_wide_checks_2022-02-17_14-00-31.png
  116   Mon Oct 11 11:24:16 2021 RSS TD MLValve support and cable labeling

Split funnels were given to Oemer for cleaning. Have received them back after lunch.

Valve support is installed again (see picture 1).

Ion pump was connected but not activated. Michael will help in doing so. No vacuum support to help will RGA. Will proceed without it.

Neg and ion cables were labeled (see pictures 2 and 3).

Chamber was vented using nitrogen.

 

Attachment 1: IMG_4962.JPG
IMG_4962.JPG
Attachment 2: IMG_4969.JPG.svg
IMG_4969.JPG.svg
Attachment 3: IMG_4968.JPG.svg
IMG_4968.JPG.svg
  117   Tue Oct 12 09:22:37 2021 RSS TD + OG DRMotors problem solved

Neg and ion cables were taken off and were put in the box.

Top support was taken off.

Motors are rotating again. Have to be careful with the position of the limit switches.

Attachment 1: IMG_4971.JPG
IMG_4971.JPG
Attachment 2: IMG_4970.JPG
IMG_4970.JPG
  122   Wed Oct 13 15:28:22 2021 RSS TD + OGSplit funnels

Split funnels installed on 4 (of 8) 2x78 way D connector feed-throughs.

Attachment 1: IMG_5038.JPG
IMG_5038.JPG
Attachment 2: IMG_5039.JPG
IMG_5039.JPG
Attachment 3: IMG_5040.JPG
IMG_5040.JPG
Attachment 4: IMG_5041.JPG
IMG_5041.JPG
Attachment 5: IMG_5042.JPG
IMG_5042.JPG
Attachment 6: IMG_5043.JPG
IMG_5043.JPG
Attachment 7: IMG_5044.JPG
IMG_5044.JPG
  150   Wed Nov 10 18:38:16 2021 RSS TD + ML OG AK NKCARME wrapped in heating tape

Heating and electronic experts were in CRYRING and were unhappy with the damaged wire. Heaters were opened by OG, but no damage was found. It is suggested to replace the entire wire and then get it approved by the concerned authority.

To avoid further delays, ML and TD agreed on heating tapes/wires covering the chamber. OG helped in wrapping the heating wire around. Tent is to be built by tomorrow.

MG and RSS tried the magnetic power back off thing which eventually did not work.

AK and NK helped with the power and thermocouple of the heating wire. NK has also covered the pipe and bellows near the magnet with heating jackets.

 

Attachment 1: IMG_5514(1).JPG
IMG_5514(1).JPG
Attachment 2: IMG_5517(1).JPG
IMG_5517(1).JPG
Attachment 3: IMG_5518.JPG
IMG_5518.JPG
Attachment 4: IMG_5520.JPG
IMG_5520.JPG
Attachment 5: IMG_5521(1).JPG
IMG_5521(1).JPG
  124   Fri Oct 15 19:37:12 2021 RSS TD + DRFriday 15 October

Ring seal is out. See picture 1.

Bellow (towards CARME) was installed in the gas jet chamber. Attached are some pictures.

Attachment 1: IMG_5059.JPG
IMG_5059.JPG
Attachment 2: IMG_5060.JPG
IMG_5060.JPG
Attachment 3: IMG_5061.JPG
IMG_5061.JPG
Attachment 4: IMG_5062.JPG
IMG_5062.JPG
Attachment 5: IMG_5064.JPG
IMG_5064.JPG
Attachment 6: IMG_5068.JPG
IMG_5068.JPG
Attachment 7: IMG_5071.JPG
IMG_5071.JPG
Attachment 8: IMG_5073.JPG
IMG_5073.JPG
  42   Fri Aug 13 07:28:37 2021 RSS TDFriday 13-17 August
Pirani  IE514
mbar    mbar



13/8/21 08:00 0.0075 3.53e-7
13/8/21 12:00 0.0065 2.80e-7
13/8/21 15:20 0.0065 2.40e-7
13/8/21 16:30 0.0060 2.29e-7


---------------------------------


14/8/21 12:00 0.0046 1.25e-7
14/8/21 12:00 0.0044 1.14e-7


---------------------------------


15/8/21 09:00 0.0040 8.47e-8
15/8/21 12:30 0.0040 8.00e-8
15/8/21 15:30 0.0040 7.69e-8


---------------------------------


16/8/21 08:00 0.0038 6.36e-8
16/8/21 11:30 0.0036 6.14e-8
16/8/21 17:00 0.0036 5.82e-8


---------------------------------


17/8/21 08:00 0.0034 4.82e-8
17/8/21 17:00 0.0034 4.47e-8
Attachment 1: IMG_4196.JPG
IMG_4196.JPG
Attachment 2: IMG_4197.JPG
IMG_4197.JPG
Attachment 3: IMG_4198.JPG
IMG_4198.JPG
Attachment 4: scroll_pump_13.08.png
scroll_pump_13.08.png
Attachment 5: turbo_pump_13.08.png
turbo_pump_13.08.png
Attachment 6: IMG_4237.JPG
IMG_4237.JPG
Attachment 7: IMG_4238.JPG
IMG_4238.JPG
Attachment 8: turbo_pump_14.08.png
turbo_pump_14.08.png
Attachment 9: scroll_pump_14.08.png
scroll_pump_14.08.png
Attachment 10: IMG_4244.JPG
IMG_4244.JPG
Attachment 11: IMG_4245.JPG
IMG_4245.JPG
Attachment 12: turbo_pump_15.08.png
turbo_pump_15.08.png
Attachment 13: scroll_pump_15.08.png
scroll_pump_15.08.png
Attachment 14: IMG_4257.JPG
IMG_4257.JPG
Attachment 15: IMG_4258.JPG
IMG_4258.JPG
Attachment 16: turbo_pump_16.08.png
turbo_pump_16.08.png
Attachment 17: scroll_pump_16.08.png
scroll_pump_16.08.png
Attachment 18: IMG_4265.JPG
IMG_4265.JPG
Attachment 19: IMG_4266.JPG
IMG_4266.JPG
Attachment 20: turbo_pump_log_scale.png
turbo_pump_log_scale.png
Attachment 21: scroll_pump_17.08.png
scroll_pump_17.08.png
Attachment 22: turbo_pump_17.08.png
turbo_pump_17.08.png
Attachment 23: log_scale_17.08.png
log_scale_17.08.png