60
|
Mon Dec 3 15:51:11 2018 |
Thomas Chillery, Carlo Bruno, Tom Davinson, David Rapagni | Changing far S2 protective mylar foil, preparing for 3.0MeV 7Li and 7Be | On 26/11/2018, after 6.0MeV 7Be and 7Li
beam measurements:
At 11:15: |
|
65
|
Mon Dec 3 17:34:38 2018 |
Thomas Chillery, Carlo Bruno, Raffaele Buompane | 6Li(p,p): Test measurement of 1.5MeV 6Li 1+ on thin CH2 50 | On 27/11/2018:
After tuning beam (see previous
eLog entry # 64) |
 |
66
|
Mon Dec 3 17:40:51 2018 |
Thomas Chillery, Carlo Bruno, Raffaele Buompane | Lab background | On 27/11/2018:
Run # 181127200709
Run time: 46329s
Pulser |
 |
64
|
Mon Dec 3 17:02:48 2018 |
Thomas Chillery, Carlo Bruno, Lizeth Morales, Guiseppe Porzio, Raffaele Buompane | 6Li(p,p): Tuning 1.5MeV 6Li 1+ beam | On 27/11/2018:
Started tuning for 1.5MeV 6Li 1+.
Set ladder to position #2 - Blank 10mm. Far |
 |
63
|
Mon Dec 3 16:47:40 2018 |
Thomas Chillery, Carlo Bruno, Lizeth Morales | Finishing 3.0MeV 7Be measurements with CH2 XIX and natC III | On 27/11/2018:
At 8:40 Far S2 bias = -130.0V,
leak I = 1.74uA. Diode bias = -70.1V, leak |
    |
1
|
Tue Aug 1 12:26:13 2017 |
Thomas Chillery | 10th - 22nd July 2017 Summary Report | Attached is a report summarising work performed
on the electronics and target chamber in
CIRCE from the 10th to the 22nd July 2017. |
|
4
|
Thu Feb 15 20:45:27 2018 |
Thomas Chillery | Planning - Target Chamber CAD diagram | Find attached the latest CAD diagram of
the Target Chamber, drawn by Peter Black |
|
6
|
Fri Feb 16 18:21:17 2018 |
Thomas Chillery | Iris arm problems | After lunch we were still having problems
with the aperture hook, see first attached
image highlighting the arm is located in |
 |
8
|
Sat Feb 17 12:35:25 2018 |
Thomas Chillery | Setup - Electronic Cabling | Between 9:00 to 12:30 this morning Filipo
was working on the weekend 14C measurements,
allowing me to work in the lab during this |
   |
9
|
Sat Feb 17 13:00:51 2018 |
Thomas Chillery | Test - S2 Detector Bias | This morning whilst I was setting up the
ribbon cabling (see eLog entry #8) I was
considering collecting a voltage bias vs |
|
11
|
Tue Feb 20 16:57:49 2018 |
Thomas Chillery | Screenshots - ADC 2 and ADC 4 settings, and example pulser walkthrough | |
11x |
16
|
Thu Feb 22 14:55:09 2018 |
Thomas Chillery | ADC6 Settings | DAQ Settings for ADC6 settings attached.
ADC 6 has been used for the pin diode during
the week starting 19/02/2018 |
    |
40
|
Wed Jul 11 15:55:35 2018 |
Thomas Chillery | Electronics Channel Map | See attached for Electronics Channel Map
spreadsheet.
This is valid for the February |
|
74
|
Tue Dec 4 09:38:18 2018 |
Thomas Chillery | 181122 Electronics Map | See attached for S2 electronics map, following
channels from S2 outputs to ADC inputs
For the 19/11/2018 - 29/11/2018 |
 |
75
|
Tue Dec 4 09:40:31 2018 |
Thomas Chillery | Preliminary measurements of target activation using geiger counter | On 29/11/2018 at 17:40 a rough measurement
of the irradiated target activity was performed
using a geiger counter. |
|
76
|
Tue Dec 4 11:23:29 2018 |
Thomas Chillery | Chamber Dimensions | See attached pictures for measurements
of the 7Be(p,p) chamber dimensions.
The target ladder center - Far |
  |
77
|
Wed Sep 18 14:01:13 2019 |
Thomas Chillery | Logbook Spreadsheet | See attached for the logbook |
|
78
|
Tue Feb 18 14:39:26 2020 |
Thomas Chillery | Target Thicknesses | Excel spreadsheet showing CH2 and natC
target thicknesses attached |
|