  16   Wed Feb 28 18:42:54 2024 Jakub SkowronskiAnalysis and Shift StatusWe have acquired the profiles for the 991
keV, 1213 keV, 1587 keV and 1799 keV resonances.
The fits looks reasonably well (in the attachement).
 fit_991.pngfit_1213.pngfit_1587.pngfit_1799.pngcalib.png 
  15   Mon Feb 26 10:14:08 2024 RSS / Dan RobertsonBeam delivery (Full Week)26-Feb-2024


Proton beam on Quartz target.


27-Feb-2024
 trim.4B949AD4-6E9C-4F12-947C-3E36A061E383.MOV 
  14   Wed Feb 21 11:53:46 2024 RSS MA TD PB KLRun InfoDCF 2.5 MV Single ended accelerator 
-   https://docs.google.com/spreadsheets/d/1jks2Y5VR_BGf1YwUndlmW_C43jZDB7QyLkldrHH80Bg/edit#gid=0

DCF 5 MV Tandem accelerator -  
  
  13   Wed Feb 21 10:36:48 2024 RSS MA TD PB KLNatural background run    Natural_Background_21.02.2024.png 
  12   Tue Feb 20 16:16:31 2024 RSS MA TD PB22Na source and natural background runWe used a 22Na source for calibration.
Attached is the calibrated spectrum.
 calibration_22Na_source.pngNatural_Background.png 
  11   Tue Feb 20 13:17:12 2024 RSS MA TD PBMounting at DCFOn the ladder, Quartz was mounted on the
bottom position. The bottom position (Quartz)
is called target 1 at 0 mm, middle position (27Al
 7409CED3-B991-4CAD-AB47-60591C07DBE7.jpegC166146D-5A59-4C2F-A1D8-EF062DA672D4.jpegE0EDF9BB-23D9-4DAD-B0AB-684A07616DF1.jpeg8E092802-CABF-4207-89F6-775210CBA1E1.jpegE053DDE4-57F1-4F9D-BB13-6EC57A67E756.jpeg 
  10   Tue Feb 20 13:11:54 2024 RSS MA TD PBVacuum & Leakage currentLeakage current test for channel zero before
pumping down:

Voltage [V]            
  
  9   Mon Feb 19 18:26:23 2024 RSS MA TD PB Mounting at DCFComputer was attached to the network. Both
flanges were mounted to check the fit, and
everything was fine. Cooling hoses were connected
 10x 
  8   Wed Feb 14 11:43:46 2024 Peter RaganPacking listIT:

PC, monitor, mouse, keyboard. 75m
cat6  cable. 100m 2 pair fibre +
  
  7   Fri Feb 9 13:13:28 2024 MarialuisaExperimental Plan   DCF-experiment-plan.pdf 
  6   Fri Feb 9 13:12:44 2024 Konrad, PeterActuator control Image of the cabling for the actuator, code
base tested and functional. 
 20240209_130953.jpg 
  5   Thu Feb 8 16:24:50 2024 RaganDAQ ParametersHV for NaI = + 693 V

Preamplifier: ORTEC Model 113,
I/P Capacitor = 1000 pF
 IMG_3142.jpgIMG_3144.jpgIMG_3151.jpgplot.pdf 
  4   Wed Feb 7 13:11:54 2024 Ragan, Peter Vacuum testing of the actuator flangeThe entire setup was tested with aluminum
nitride wafers instead of Sapphirine.
 40035F22-595D-4006-BF2E-1A3F25A86384.jpegCEEA80C7-7739-4F70-ADCC-C5EA239FD06C.jpeg82C8286D-6397-479E-88BE-1987921C0F70.jpegD932C006-4582-4E17-9C68-D9BEEA3C5792.jpeg 
  3   Wed Feb 7 08:21:24 2024 Ragan, Peter Vacuum testing of the flange with water cooling Flange connected to the cooling system
was cleaned, hoses changed, and one Faraday
cup mounted and tested in vacuum. Sapphirine
 IMG_3114.jpgIMG_3116.jpgIMG_3117.jpgIMG_3120.jpgIMG_3124.jpg 
  2   Mon Feb 5 15:17:48 2024 Konrad, Ragan, PeterVacuum testing of the flange with water coolingConnected the flange with the cooling system
in place, attached pictures represent the
set up used. Currently testing for potential
 20240205_135233.jpg20240206_102014.jpg 
  1   Fri Jan 26 09:00:22 2024 RaganShiftplanhttps://docs.google.com/spreadsheets/d/148e5YV3PrkPvQTYykbtNmv3sZqCtmdoY-Ad0gs5dplc/edit#gid=0   