ID |
Date |
Author |
Subject |
Text |
|
16
|
Wed Feb 28 18:42:54 2024 |
Jakub Skowronski | Analysis and Shift Status | We have acquired the profiles for the 991
keV, 1213 keV, 1587 keV and 1799 keV resonances.
The fits looks reasonably well (in the attachement). |
|
15
|
Mon Feb 26 10:14:08 2024 |
RSS / Dan Robertson | Beam delivery (Full Week) | 26-Feb-2024
Proton beam on Quartz target.
27-Feb-2024 |
|
14
|
Wed Feb 21 11:53:46 2024 |
RSS MA TD PB KL | Run Info | DCF 2.5 MV Single ended accelerator
- https://docs.google.com/spreadsheets/d/1jks2Y5VR_BGf1YwUndlmW_C43jZDB7QyLkldrHH80Bg/edit#gid=0
DCF 5 MV Tandem accelerator - |
|
13
|
Wed Feb 21 10:36:48 2024 |
RSS MA TD PB KL | Natural background run | |
|
12
|
Tue Feb 20 16:16:31 2024 |
RSS MA TD PB | 22Na source and natural background run | We used a 22Na source for calibration.
Attached is the calibrated spectrum. |
|
11
|
Tue Feb 20 13:17:12 2024 |
RSS MA TD PB | Mounting at DCF | On the ladder, Quartz was mounted on the
bottom position. The bottom position (Quartz)
is called target 1 at 0 mm, middle position (27Al |
|
10
|
Tue Feb 20 13:11:54 2024 |
RSS MA TD PB | Vacuum & Leakage current | Leakage current test for channel zero before
pumping down:
Voltage [V] |
|
9
|
Mon Feb 19 18:26:23 2024 |
RSS MA TD PB | Mounting at DCF | Computer was attached to the network. Both
flanges were mounted to check the fit, and
everything was fine. Cooling hoses were connected |
10x |
8
|
Wed Feb 14 11:43:46 2024 |
Peter Ragan | Packing list | IT:
PC, monitor, mouse, keyboard. 75m
cat6 cable. 100m 2 pair fibre + |
|
7
|
Fri Feb 9 13:13:28 2024 |
Marialuisa | Experimental Plan | |
|
6
|
Fri Feb 9 13:12:44 2024 |
Konrad, Peter | Actuator control | Image of the cabling for the actuator, code
base tested and functional. |
|
5
|
Thu Feb 8 16:24:50 2024 |
Ragan | DAQ Parameters | HV for NaI = + 693 V
Preamplifier: ORTEC Model 113,
I/P Capacitor = 1000 pF |
|
4
|
Wed Feb 7 13:11:54 2024 |
Ragan, Peter | Vacuum testing of the actuator flange | The entire setup was tested with aluminum
nitride wafers instead of Sapphirine. |
|
3
|
Wed Feb 7 08:21:24 2024 |
Ragan, Peter | Vacuum testing of the flange with water cooling | Flange connected to the cooling system
was cleaned, hoses changed, and one Faraday
cup mounted and tested in vacuum. Sapphirine |
|
2
|
Mon Feb 5 15:17:48 2024 |
Konrad, Ragan, Peter | Vacuum testing of the flange with water cooling | Connected the flange with the cooling system
in place, attached pictures represent the
set up used. Currently testing for potential |
|
1
|
Fri Jan 26 09:00:22 2024 |
Ragan | Shiftplan | https://docs.google.com/spreadsheets/d/148e5YV3PrkPvQTYykbtNmv3sZqCtmdoY-Ad0gs5dplc/edit#gid=0 |
|