Entry  Wed Feb 28 18:42:54 2024, Jakub Skowronski, Analysis and Shift Status fit_991.pngfit_1213.pngfit_1587.pngfit_1799.pngcalib.png
We have acquired the profiles for the 991 keV, 1213 keV, 1587 keV and 1799 keV resonances. The fits looks reasonably well (in the attachement). We also
get a preliminary (but very good) calibration curve (in attachment).

The beam spread from the fits seems to be close to 200 eV. The only problem we see is the stability of the beam energy: it tends to drift a bit
Entry  Mon Feb 26 10:14:08 2024, RSS / Dan Robertson, Beam delivery (Full Week) trim.4B949AD4-6E9C-4F12-947C-3E36A061E383.MOV
26-Feb-2024


Proton beam on Quartz target.


27-Feb-2024


 


28-Feb-2024
Entry  Wed Feb 21 11:53:46 2024, RSS MA TD PB KL, Run Info 
DCF 2.5 MV Single ended accelerator  -   https://docs.google.com/spreadsheets/d/1jks2Y5VR_BGf1YwUndlmW_C43jZDB7QyLkldrHH80Bg/edit#gid=0

DCF 5 MV Tandem accelerator -   https://docs.google.com/spreadsheets/d/1t1edlHz1Ib8VLhuYZccxvRvof_44Y1LJ6sL3j_olk2I/edit#gid=0
Entry  Wed Feb 21 10:36:48 2024, RSS MA TD PB KL, Natural background run  Natural_Background_21.02.2024.png
 
Entry  Tue Feb 20 16:16:31 2024, RSS MA TD PB, 22Na source and natural background run calibration_22Na_source.pngNatural_Background.png
We used a 22Na source for calibration. Attached is the calibrated spectrum.
Entry  Tue Feb 20 13:17:12 2024, RSS MA TD PB, Mounting at DCF 7409CED3-B991-4CAD-AB47-60591C07DBE7.jpegC166146D-5A59-4C2F-A1D8-EF062DA672D4.jpegE0EDF9BB-23D9-4DAD-B0AB-684A07616DF1.jpeg8E092802-CABF-4207-89F6-775210CBA1E1.jpegE053DDE4-57F1-4F9D-BB13-6EC57A67E756.jpeg
On the ladder, Quartz was mounted on the bottom position. The bottom position (Quartz) is called target 1 at 0 mm, middle position (27Al target
on Ta backing) is called target 2 at 50 mm, and top position (27Al target on Ta backing) is called target 3 at 100 mm.

On HV supply, Channel 0 is connected to Suppressor and Channel 1 is connected to Target.
Entry  Tue Feb 20 13:11:54 2024, RSS MA TD PB, Vacuum & Leakage current 
Leakage current test for channel zero before pumping down:

Voltage [V]             Current [nA]

500                        
Entry  Mon Feb 19 18:26:23 2024, RSS MA TD PB , Mounting at DCF 10x
Computer was attached to the network. Both flanges were mounted to check the fit, and everything was fine. Cooling hoses were connected and water cooling
was checked by turning on the chiller, with no leak. On the actuator flange, two Al targets were mounted on the top and the middle position of the ladder
and Quartz crystal will be mounted on the bottom position tomorrow.
Entry  Wed Feb 14 11:43:46 2024, Peter Ragan, Packing list 
IT:

PC, monitor, mouse, keyboard. 75m cat6  cable. 100m 2 pair fibre + 2 media converters. 2 cat5 patch leads. USB webcam. USB cables.
3x USB extensions. Spare motor driver. Extension leads
Entry  Fri Feb 9 13:13:28 2024, Marialuisa, Experimental Plan DCF-experiment-plan.pdf
 
Entry  Fri Feb 9 13:12:44 2024, Konrad, Peter, Actuator control  20240209_130953.jpg
Image of the cabling for the actuator, code base tested and functional. 
Entry  Thu Feb 8 16:24:50 2024, Ragan, DAQ Parameters IMG_3142.jpgIMG_3144.jpgIMG_3151.jpgplot.pdf
HV for NaI = + 693 V

Preamplifier: ORTEC Model 113, I/P Capacitor = 1000 pF

Amplifier: ORTEC 572, internal jumpers = x1, Gain = x1, Coarse Gain = x200, Shaping Time = 0.5 us, I/P polarity: negative, O/P: Unipolar
Entry  Wed Feb 7 13:11:54 2024, Ragan, Peter, Vacuum testing of the actuator flange 40035F22-595D-4006-BF2E-1A3F25A86384.jpegCEEA80C7-7739-4F70-ADCC-C5EA239FD06C.jpeg82C8286D-6397-479E-88BE-1987921C0F70.jpegD932C006-4582-4E17-9C68-D9BEEA3C5792.jpeg
The entire setup was tested with aluminum nitride wafers instead of Sapphirine.
Entry  Wed Feb 7 08:21:24 2024, Ragan, Peter, Vacuum testing of the flange with water cooling  IMG_3114.jpgIMG_3116.jpgIMG_3117.jpgIMG_3120.jpgIMG_3124.jpg
Flange connected to the cooling system was cleaned, hoses changed, and one Faraday cup mounted and tested in vacuum. Sapphirine chip was used as an insulator.
A vacuum of 3.1E-6 mbar is achieved.

 
Entry  Mon Feb 5 15:17:48 2024, Konrad, Ragan, Peter, Vacuum testing of the flange with water cooling 20240205_135233.jpg20240206_102014.jpg
Connected the flange with the cooling system in place, attached pictures represent the set up used. Currently testing for potential leaks as minimum
pressure achived is 4.0e-5 mbar




Pressure (mbar)
Entry  Fri Jan 26 09:00:22 2024, Ragan, Shiftplan 
https://docs.google.com/spreadsheets/d/148e5YV3PrkPvQTYykbtNmv3sZqCtmdoY-Ad0gs5dplc/edit#gid=0