Entry  Sat Apr 10 12:15:54 2021, OH, TD, Saturday 10 April 16x
12:37 DAQ found crashed. Had crashed at some time following 7:50am following previous statistics update
      Unable to recover the FEEs so forced to power cycle
      Following power cycle statistics much improved from yesterday.
Entry  Tue May 4 13:53:22 2021, OH, TD, Tuesday 4 May 7x

NH has re-checked alignment of AIDA adaptor PCBs cf. Elog:290
Entry  Fri May 21 07:03:50 2021, OH, TD, Friday 21 May 08:00-16:00 9x
08:00 OH and TD take over
      Current settings p+n sides at 0xc
      DSSD1 n+n sides 0x20 on ASICs 1-3 and 0x64 on ASIC 4
Entry  Wed Jun 2 14:53:05 2021, OH, TD, Merger/Tapeserver issues after reboot of aida-3 6x
On 01/06/21 aida-3 was rebooted as the graphical user interface had frozen.
We were also unable to connected to MIDAS via ssh port forwarding.
Entry  Fri May 13 07:36:18 2022, OH, TD, Friday 13 May 35x
08:36 DAQ Still running smoothly
      Currently on run R1_328
      At current data rates we have just over 4 days of space left on the current disk
Entry  Mon Jun 20 09:26:23 2022, OH, TD, Monday 20 June 11x
10:26 MACB HDMI for AIDA03 and AIDA04 reseated.
      Merger and DAQ restarted - All happily sending data
      Has been running for 10 minutes with no WR errors.
Entry  Wed May 12 06:59:55 2021, OH, RDP, Wed 12 May 08:00-16:00 1dImplants.png1dImplants2.png512.png513.png
08:00 While the rates appeared to have quietened around 7am they are back to their previous rate now.

      They still seem to be working on the setting. Implant rate in AIDA about 8 per spill. Thick degrader is still in place
Entry  Tue May 18 06:50:53 2021, OH, PP, Tuesday 18th May 08:00 - 16:00 6x
08:00 OH Takes over

      Statistics still look good from yesterday. Rate is still down.
Entry  Wed Apr 6 10:09:21 2022, OH, NH, TD, Wednesday 6 April 6x
DSSSD bias OFF. DAQ STOPped

Attachment 6 FEE64 temps OK
Entry  Thu Apr 7 12:42:14 2022, OH, NH, TD, Thursday 7 April 8x

Re-assembled triple snout re-installed on the AIDA stand - DSSSD ribbon cables and grounds re-connected.
FEE64 adaptor PCB LKs per https://elog.ph.ed.ac.uk/DESPEC/409
Entry  Wed May 11 07:04:13 2022, OH, NH, TD, Wednesday 11th May 9x
08:00 Overnight at some point it appears that aida14 has stopped producing any ASIC data
      It is currently sending data pause requests and data push requests but nothing else - attachment 1
      telnet into aida14 and run top to see what the current state of the FEE is. AIDAExec currently using 0% CPU usage.
Entry  Tue Nov 12 13:22:19 2019, OH, NH, CA, AIDA09 Replacement FEE-SerialNumber.txt
ASIC 1 on FEE9 was not producing signals.

A new HDMI cable was installed but still no signals.
Entry  Wed Oct 27 15:12:50 2021, OH, NH, Noise tests - 27th October 6x
 Began by installing the triple.
Only the upstream detector was connected to the FEEs the downstream detector cables were left loose. The two detectors are isotolated though.
Entry  Tue Mar 1 08:29:19 2022, OH, NH, Findings from the upgrade to centos7 from SL6 TapeServer.desktopScreenshot_from_2022-03-01_09-40-18.png
Required packages not included as default


csh (For running MIDAS scripts)
xinetd (Runs the rdate server for the FEEs)
Telnet
(Communication with the FEEs)
dhcp


Configuration changes


FEEs uses NFS2 which is no longer enabled by
default

Must edit config in /etc/nfs.conf to uncomment the following lines:

[nfsd]
vers2=y




/etc/xinetd.d/time-stream
Entry  Wed Mar 2 16:00:01 2022, OH, NH, Noise tests - 2nd March 
An interesting find with the new sum inverter is that with the pulser at default settings the pulser peak on the n+n side is above the range of the ADC.
We have checked signals from the sum inverter and pulser and both are equal in magnitude.
We therefor determine it is over range as the charge is spread over 4 FEEs vs 12 on the p+n side.
Entry  Thu Mar 3 08:45:03 2022, OH, NH, AIDA Noise and grounding tests 3rd March 8x
Pulser spectra


Changes to the nn pulser circuit yesterday have improved the peak widths on the p+n side
p+n peak widths
averact around 100 channels
n+n around 1000 at 0xa threshold
n+n 1.8.L spectra - attachment 1
p+n 1.8.L spectra attachment
2


p+n peak widths




Entry  Fri Mar 4 08:40:36 2022, OH, NH, AIDA Noise and grounding tests 3rd March - Results 9x
Grounding implemented


Each FEE given direct connection to heavy duty earth bar via adaptor board lemo ground
Earth bars
are then connected to platform ground on AIDA frame
Photo of grounding - attachment 1
Improvements not as large as expected from
previous experience though

Particularly in the n+n side where widths still appear awful


While implementing the
Entry  Sat Mar 5 10:43:45 2022, OH, NH, Grounding and noise tests 4th-5th March Summary 13x
Tests performed


After leaving overnight noticed the pulser was not fully inserted into aida09

Little change in rates
observed in 9 but otherwise nothing else


Connected bias of aida02 (n+n ground) to aida06 (n+n ground) and likewise 4-8

No
change observed in rates


Also tested covering the snout in light tight material

No Changes


Unplugged
Entry  Fri Apr 8 08:59:42 2022, OH, NH, Friday 8th April 11x
09:59 Noticed that the right hand ribbon cable for aida07 was offset vertically by 1. i.e. Only 1 of the 2 rows of pins in. Unbiassed detectors and reconnected.
      Rebiassed detectors - leakage current on DSSD2 increased to 9.96uA - Attachment 1
Entry  Sat Jun 18 09:46:57 2022, OH, NH, Friday 17th June 23x
Summary of the day:
Small improvements were made throughout the day but by far the biggest change to the rate in the FEEs came from disabling the waveforms
This was done by setting ADC con