  323   Tue May 18 06:50:53 2021 OH, PPTuesday 18th May 08:00 - 16:0008:00 OH Takes over

      Statistics still look good from yesterday.
 6x 
  412   Wed Apr 6 10:09:21 2022 OH, NH, TDWednesday 6 AprilDSSSD bias OFF. DAQ STOPped

Attachment 6 FEE64 temps OK
 6x 
  413   Thu Apr 7 12:42:14 2022 OH, NH, TDThursday 7 April
Re-assembled triple snout re-installed on
the AIDA stand - DSSSD ribbon cables and
 8x 
  428   Wed May 11 07:04:13 2022 OH, NH, TDWednesday 11th May08:00 Overnight at some point it appears that
aida14 has stopped producing any ASIC data
      It is currently sending data pause
 9x 
  92   Tue Nov 12 13:22:19 2019 OH, NH, CAAIDA09 ReplacementASIC 1 on FEE9 was not producing signals.

A new HDMI cable was installed but still
 FEE-SerialNumber.txt 
  390   Wed Oct 27 15:12:50 2021 OH, NHNoise tests - 27th October Began by installing the triple.
Only the upstream detector was connected
to the FEEs the downstream detector cables
 6x 
  397   Tue Mar 1 08:29:19 2022 OH, NHFindings from the upgrade to centos7 from SL6Required packages not included as default


csh
(For running MIDAS scripts)
xinetd
(Runs the rdate server for the FEEs)
Telnet
 TapeServer.desktopScreenshot_from_2022-03-01_09-40-18.png 
  400   Wed Mar 2 16:00:01 2022 OH, NHNoise tests - 2nd MarchAn interesting find with the new sum inverter
is that with the pulser at default settings
the pulser peak on the n+n side is above
  
  401   Thu Mar 3 08:45:03 2022 OH, NHAIDA Noise and grounding tests 3rd MarchPulser spectra


Changes
to the nn pulser circuit yesterday have improved
the peak widths on the p+n side
p+n
 8x 
  402   Fri Mar 4 08:40:36 2022 OH, NHAIDA Noise and grounding tests 3rd March - ResultsGrounding implemented


Each
FEE given direct connection to heavy duty
earth bar via adaptor board lemo ground
Earth
 9x 
  403   Sat Mar 5 10:43:45 2022 OH, NHGrounding and noise tests 4th-5th March SummaryTests performed


After
leaving overnight noticed the pulser was
not fully inserted into aida09

Little
 13x 
  414   Fri Apr 8 08:59:42 2022 OH, NHFriday 8th April09:59 Noticed that the right hand ribbon cable
for aida07 was offset vertically by 1. i.e.
Only 1 of the 2 rows of pins in. Unbiassed
 11x 
  482   Sat Jun 18 09:46:57 2022 OH, NHFriday 17th JuneSummary of the day:
Small improvements were made throughout the
day but by far the biggest change to the
 23x 
  502   Sun Jun 26 08:51:20 2022 OH, NHSunday 26 June 08:00-24:0009:51 Taken over from Tom following the night
shift
      Experiment is still running smoothly
 27x 
  508   Tue Jun 28 10:11:35 2022 OH, NHMIDAS Data Aq V1011:11 Rebooted FEEs and changed aidacommon
in /MIDAS/linux-ppc_4xx/startup to point
to the new V10 DataAq that Patrick produced
 220628_1117_Rollover0xE.png220628_1119_Merger_Stats_0x7.pngNewMerger_Dump.txt 
  229   Fri Apr 16 07:19:00 2021 OH, MAFriday 16th April 08:00-16:0008:19 System wide checks all ok
      Baselines reset on WR and FPGA checks
for the start of the day
 14x 
  175   Sat Mar 6 06:52:06 2021 OH, LSSaturday 6th March07:50 Pulser settings - attachment 1

07:52 System wide checks all ok
 30x 
  187   Wed Mar 10 07:16:02 2021 OH, LSWednesday 10th March 08:00-24:0008:16 System wide checks all ok
      Statistics - attachment 1
      Temperatures - attachment 2
 39x 
  189   Thu Mar 11 07:09:25 2021 OH, LSThursday 11th of March08:00 System wide checks all ok *exctept aida07
and 10 on ADC calibration
      N.B. wrong date given to the screenshots
 29x 
  144   Thu Mar 12 08:04:24 2020 OH, CA, TDThursday 12th March 08:00-16:00ASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
 14x 