AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 17 of 37  ELOG logo
Entry  Mon Mar 18 18:04:43 2024, NH, Preparation for pre-s100 dry run (and test beam???) 
Entry  Tue Jul 7 08:04:57 2020, NH, Power failure in Messhuette 
Entry  Mon Aug 28 12:47:56 2023, NH, Power Failure 24.08.2023 
Entry  Wed Jan 31 15:27:07 2024, TD, Photos of water flow & dew point sensor interlock box 20240131_160205.jpg20240131_145249.jpg20240131_145340.jpg20240131_160341.jpg
Entry  Thu Mar 12 23:44:48 2020, DK, PID Plots pid.pngpid.pngpid.pdf
Entry  Thu Apr 25 22:45:30 2024, Tom, Muneerah, Norah, Over night shift AIDA 26 Fri 9x
Entry  Thu Oct 6 16:51:49 2022, NH, Oscilloscope analysis 24x
Entry  Mon Jan 13 17:38:18 2025, TD, Offline analysis of S505 data files 10x
Entry  Mon Feb 26 13:17:51 2024, TD, Offline analysis of DEC23/R9_6 9x
Entry  Thu Apr 11 15:28:10 2019, CA, OH, CB, TD, Offline analysis of 290319 files R13 and R16 6x
Entry  Wed Jan 15 11:58:08 2025, TD, Offline analysis data files S505 R3_9 - R3_128 (207Hg setting) 27x
Entry  Wed Feb 12 10:46:01 2025, TD, Offline analysis data files S181 R4_351-396  25x
Entry  Sat Feb 22 12:35:38 2025, TD, Offline analysis data files R9_85-R9_199 (84Mo setting) 22x
Entry  Mon Jan 13 11:32:30 2025, TD, Offline analysis S505 data file R3_150 22x
Entry  Thu Dec 5 11:18:46 2024, TD, Offline analysis S100 data files R21_0-R21_99 23x
Entry  Sat Apr 20 11:40:38 2024, TD, Offline analysis R12 & R13 ( pulser walkthrough ) 17x
Entry  Fri Mar 13 15:48:11 2020, Friday 13th 16:00 - 24:00, OH, TD 11x
Entry  Thu May 12 16:30:47 2022, NH, OH, TD, Notes for mounting a second switch 
Entry  Wed Apr 14 15:14:55 2021, PJCS, Note Well 
Entry  Wed Mar 2 16:00:01 2022, OH, NH, Noise tests - 2nd March 
ELOG V3.1.3-7933898