AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 17 of 37  ELOG logo
ID Date Author Subjectdown Text Attachments
  540   Mon Mar 18 18:04:43 2024 NHPreparation for pre-s100 dry run (and test beam???)In preparation for the dry run the following
*temporary* changes to the FEE numbering
have been prepared
  
  159   Tue Jul 7 08:04:57 2020 NHPower failure in MesshuetteLast week there was a power failure in Messhuette
(FRS control room) - AIDA-3 and MBS were
affected.
  
  519   Mon Aug 28 12:47:56 2023 NHPower Failure 24.08.2023There was a power failure in the morning of
24.08.2023 in the Rhein-Main area affecting
GSI
  
  524   Wed Jan 31 15:27:07 2024 TDPhotos of water flow & dew point sensor interlock boxAttachment 1 - 4 socket input connectors (
from sensor to interlock box )
 20240131_160205.jpg20240131_145249.jpg20240131_145340.jpg20240131_160341.jpg 
  147   Thu Mar 12 23:44:48 2020 DKPID PlotsLabelled PID plots.  Note that the A/Q calibration
is shifted by +0.02 units, and Z calibration
is offset by about +5.
 pid.pngpid.pngpid.pdf 
  607   Thu Apr 25 22:45:30 2024 Tom, Muneerah, NorahOver night shift AIDA 26 Fri 

01:02

Aida04 was zero not reading had
 9x 
  515   Thu Oct 6 16:51:49 2022 NHOscilloscope analysisInvestigating AIDA noise with a TA041 differential
probe and oscilloscope 
 24x 
  693   Mon Jan 13 17:38:18 2025 TDOffline analysis of S505 data files
First timestamp of R2_105 0x16FAEC5E54AABF6C
 10x 
  525   Mon Feb 26 13:17:51 2024 TDOffline analysis of DEC23/R9_6
First pass analysis of data file /TapeData/DEC23/R9_6
 9x 
  49   Thu Apr 11 15:28:10 2019 CA, OH, CB, TDOffline analysis of 290319 files R13 and R16X projection of high energy channel ADC hits
from R13 (attachment 1)
 6x 
  694   Wed Jan 15 11:58:08 2025 TDOffline analysis data files S505 R3_9 - R3_128 (207Hg setting)
Aanlysis data files R3_9 - R3_128 (207Hg
setting)
 27x 
  698   Wed Feb 12 10:46:01 2025 TDOffline analysis data files S181 R4_351-396 Analysis data files R4_351-396

 25x 
  700   Sat Feb 22 12:35:38 2025 TDOffline analysis data files R9_85-R9_199 (84Mo setting)
Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
 22x 
  692   Mon Jan 13 11:32:30 2025 TDOffline analysis S505 data file R3_150Offline analysis of S505 data files R3_150

first WR ts
 22x 
  673   Thu Dec 5 11:18:46 2024 TDOffline analysis S100 data files R21_0-R21_99Offline analysis of S100 data files R21_0
- R21_99 (162Eu setting)
 23x 
  582   Sat Apr 20 11:40:38 2024 TDOffline analysis R12 & R13 ( pulser walkthrough )
S100 ADC offsets using pulser walkthrough
data from data files R12 & R13
 17x 
  149   Fri Mar 13 15:48:11 2020 Friday 13th 16:00 - 24:00OH, TDASIC settings 2019Oct31-13.24.23
     slow comparator 0xa
 11x 
  433   Thu May 12 16:30:47 2022 NH, OH, TDNotes for mounting a second switchUpdate DHCPD as expected
Make sure new ethernet device is trusted
in firewall
  
  221   Wed Apr 14 15:14:55 2021 PJCSNote WellPlease note that for the forseeable future
the system function in the menu on the System
Wide Checks browser page labelled as 
  
  400   Wed Mar 2 16:00:01 2022 OH, NHNoise tests - 2nd MarchAn interesting find with the new sum inverter
is that with the pulser at default settings
the pulser peak on the n+n side is above
  
ELOG V3.1.3-7933898