  517   Wed Jan 18 13:40:33 2023 PJCS TDMACB settings with either Emulator or VITARWhen using the VETAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3.
 macb_apr20.jedmacb_apr20.vhdzybo.jpgMACB.jpg 
  16   Wed Jan 23 09:25:55 2019 CA, TD, NH, VPMACB and setup pics 23.01.19Pictures of leaking cooling pipe

MACB switch settings
 11x 
  292   Tue May 4 14:05:48 2021 NHMACB CablesDuring the installation of the 4 new HDMI
cables for aidas13-16 the HDMI cables between
the MACB Root and the MACB leaves were looped
 macb_front.jpgmacb_side.jpg 
  435   Thu May 12 22:49:39 2022 BA, MALow RatesThe rate is very low in all aida, not sure
.
 RatesLow2022-05-12_23-48-01.png 
  441   Fri May 13 06:56:14 2022 OH, BA, MALow Rates 




  
  460   Mon May 16 14:07:06 2022 TDLost activity monitor   Screenshot_from_2022-05-16_15-04-56.png 
  539   Fri Mar 15 16:29:57 2024 NHLeakage currentsThe behaviour of the DSSSD leakage current
at low voltages and during biases is unusual
and varies depending on how the adapter boards
  
  686   Thu Jan 9 16:25:51 2025 TDLEC fast comparator threshold too low
LEC fast comparator has been set to 0x2 (200keV)
which is *very* low and means the fast comparator
 Screenshot_from_2025-01-09_17-28-45.png 
  687   Thu Jan 9 17:36:50 2025 TDLEC fast comparator threshold too low
> LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the
  
  688   Thu Jan 9 17:56:14 2025 TDLEC fast comparator threshold too low> > 
> > LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the
  
  689   Fri Jan 10 10:03:43 2025 TDLEC fast comparator threshold too low> > > 
> > > LEC fast comparator has been set to
0x2 (200keV) which is *very* low and means
  
  18   Thu Jan 24 10:21:26 2019 CA, TD, NH, VPJanuary 24th 201910.30 AIDA setup and DAQ start complete
      writing to file TapeData/NULL/R1
 7x 
  17   Wed Jan 23 17:03:08 2019 CA, TD, NH, VPJanuary 23rd 2019Post White Rabbit update

Attachment 1 - 1.8.W pulser waveform spectra
 6x 
  15   Wed Jan 23 08:12:01 2019 CA, TD, NH, VPJanuary 22nd 2019Attachment 1 - 1.8.W waveform spectra with
pulser signal
 220119_18W.png220119_pulserpeaks.png220119_stats.png220119_Temp.png 
  555   Tue Apr 2 12:36:25 2024 JB, CC, NHInstalling FEE64s of DSSSD2 cont.Some additional checks

- check 'top
hat' electrical isolators are correctly
  
  552   Wed Mar 27 14:22:35 2024 JB, NHInstalling FEE64s of DSSSD2Mounted on frame:

DSSD 1 (Upstream) :    
3208-2/3208-5/3208-8
 14x 
  553   Thu Mar 28 09:18:53 2024 TDInstalling FEE64s of DSSSD2Some additional checks

- check 'top hat' electrical
isolators are correctly installed at each
  
  106   Wed Dec 11 10:58:52 2019 NHInitital Dec. AnalysisFig 1: 2D hit pattern of each AIDA DSSD for
MBS run 24 (40Ar primary beam, centred)
 11x 
  227   Fri Apr 16 02:15:12 2021 NHImplants/PunchthroughRate with beam < 1000 Hz still

Not Uranium but some fragments possibly produced
 53_AM.png 
  7   Thu Sep 20 09:16:31 2018 TDImages of AIDA setup for DESPECAttachment 1 - detail of MSL type BB18(DS)-1000
p+n junction side strips, bias ring, multiple
guard rings, filed 
 9x 