AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 26 of 37  ELOG logo
Entry  Sun Jul 16 09:32:57 2023, TD, Firefox browser proxy setting change 

Firefox browser proxy setting changed to 'Auto-detect proxy settings for this network' ( Firefox -> Edit -> Settings -> Network Settings -> Settings )
Entry  Tue Mar 1 08:29:19 2022, OH, NH, Findings from the upgrade to centos7 from SL6 TapeServer.desktopScreenshot_from_2022-03-01_09-40-18.png
Required packages not included as default


csh (For running MIDAS scripts)
xinetd (Runs the rdate server for the FEEs)
Telnet
(Communication with the FEEs)
dhcp


Configuration changes


FEEs uses NFS2 which is no longer enabled by
default

Must edit config in /etc/nfs.conf to uncomment the following lines:

[nfsd]
vers2=y




/etc/xinetd.d/time-stream
Entry  Thu Apr 15 12:23:22 2021, NH, Fast Discriminator Masks Image_Pasted_at_2021-4-14_18-57.png
It is possible to get good rates with the fast discriminators with a few hot channels mask in aida03 and aida10
Threshold is 0x20 = 3.2 MeV
Entry  Tue Jul 22 18:00:45 2025, CC, NK, MP, FWHM aida FEE Screenshot_from_2025-07-22_18-59-26.pngScreenshot_from_2025-07-22_18-59-45.png
AIDA05 completely disconnected, all the others FEEs64 are fully connected

Attachment 1: aida05, FWHM= 95 ch, 63 keV

Attachment 2: aida15, FWHM= 108 ch, 74 keV
Entry  Wed Jun 9 19:17:21 2021, TD, FEE64 system console logs  logs-090621.tar.gz
 
Entry  Thu Sep 6 15:42:53 2018, OH, TD, FEE64 system console logs logs.tar

Kernel panics during boot cab be observed in files ttyUSB1 and ttyUSB5
Entry  Sun Apr 7 13:08:52 2024, TD, FEE64 configuration AIDA_S100_WiringPlan.drawio.png
FEE64 configuration per https://elog.gsi.de/despec/S100/6

Configuration: Wide - 16 FEEs, 2 DSSD
Entry  Tue May 4 14:26:50 2021, NH, FEE64 Adapter wiring diagram and layout AIDA_Adapter_Configuration(1).png
A figure showing the FEE64 numbers (a previous diagram had 2/6 and 4/8 on the wrong side of the DSSD) and the wiring of pulser/HV
Also the jumpers connected to the boards
Entry  Thu Dec 19 14:45:42 2019, TD, FEE64 ASIC settings - different diode link settings 
[npg@aidas-gsi 2019Oct31-13.24.23]$ pwd
/MIDAS/DB/EXPERIMENTS/AIDA/2019Oct31-13.24.23
[npg@aidas-gsi 2019Oct31-13.24.23]$ /bin/csh
Entry  Thu Oct 21 16:18:51 2021, OH, FEE and Adaptor board groundings 
During investigations into the noise today by NH and OH a couple of findings were made on the grounding of the FEEs and Adaptor boards.

- The adaptor boards have no connection to the FEE ground over the ERNI connector
    Reply  Tue Oct 26 16:08:46 2021, NH, FEE and Adaptor board groundings 
> During investigations into the noise today by NH and OH a couple of findings were made on the grounding of the FEEs and Adaptor boards.

> - The adaptor boards have no connection to the FEE ground over the ERNI connector
Entry  Thu Mar 21 14:10:10 2019, NH, FEE Temperatures FEETemps.png
All 12 FEEs powered up, and temperatures are OK.

Passed ASIC checks and system wide checks - now checking cabling and to mount snout.
Entry  Sat Apr 24 05:17:51 2021, ML, End of beam 
Beam has now stopped (end of expriment) and background measurements starts.
Entry  Mon Mar 16 07:25:24 2020, NH, End of Experiment 
08:25 Beam Stopped, end of S480

Tape Server stopped at R12_2097

Started again in no storage mode
Entry  Fri Mar 22 15:44:20 2019, NH, End of 22.03.2019 
End of the day - Detector unbiased and FEE64s turned off for the weekend as they won't be monitored.

Water will remain on.
Entry  Tue Mar 19 10:17:30 2024, NH, Dry Run 2024 - 19th March 24 Screenshot_from_2024-03-19_13-44-34.pngScreenshot_from_2024-03-19_13-44-22.pngScreenshot_from_2024-03-19_13-44-04.pngScreenshot_from_2024-03-19_13-43-44.pngScreenshot_from_2024-03-19_13-43-24.png
AIDA has 8 FEEs and 1 DSSSD 

Aida08 (HDMI#12) had no WR again, I moved it to a different MACB and now it gets WR
Entry  Mon Oct 13 15:04:53 2025, JPB, NH, GB, MP, Dismount AIDA and realign the cables IMG_5778.jpegIMG_5779.jpeg
We have dismounted the AIDA stack and bPlast and realigned the cables so that they can fit into the adaptors.

The plan for the next couple days is the following:
Entry  Wed Oct 30 11:51:08 2019, CA, TD, NH, Detector biasing bias30Oct.png30Octbias2.pnghvsketch.pdf
12.51 - detector bias and leakage currents - detector 3 has no current
                                           - other detectors ok
Entry  Wed Jun 5 08:34:47 2024, JB. AM, MP, MY, Detector bias tests 14x
We are trying to bias each system on its own and in sequence biasing each other detector system to see the interdependence.
 

HV OK. TEMP OK. Attachment 1 &2.
Entry  Thu Dec 6 15:31:40 2018, TD, CA, NH, December 6th 2018 11x
15.32 1.8.W spectra for aida01, aida09, aida10, aida11, aida12 (attachments 1, 2, 3)
      2 and 3 expanded in Y and X direction respectively
ELOG V3.1.3-7933898