AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 26 of 36  ELOG logo
ID Date Author Subjectdown Text Attachments
  389   Tue Oct 26 16:08:46 2021 NHFEE and Adaptor board groundings> During investigations into the noise today
by NH and OH a couple of findings were made
on the grounding of the FEEs and Adaptor
  
  29   Thu Mar 21 14:10:10 2019 NHFEE TemperaturesAll 12 FEEs powered up, and temperatures
are OK.

Passed ASIC checks and system wide
 FEETemps.png 
  275   Sat Apr 24 05:17:51 2021 MLEnd of beamBeam has now stopped (end of expriment)
and background measurements starts.
  
  156   Mon Mar 16 07:25:24 2020 NHEnd of Experiment08:25 Beam Stopped, end of S480

Tape Server stopped at R12_2097

Started again in no storage mode
  
  34   Fri Mar 22 15:44:20 2019 NHEnd of 22.03.2019End of the day - Detector unbiased and
FEE64s turned off for the weekend as they
won't be monitored.
  
  541   Tue Mar 19 10:17:30 2024 NHDry Run 2024 - 19th March 24AIDA has 8 FEEs and 1 DSSSD 

Aida08 (HDMI#12) had no WR again, I moved
 Screenshot_from_2024-03-19_13-44-34.pngScreenshot_from_2024-03-19_13-44-22.pngScreenshot_from_2024-03-19_13-44-04.pngScreenshot_from_2024-03-19_13-43-44.pngScreenshot_from_2024-03-19_13-43-24.png 
  69   Wed Oct 30 11:51:08 2019 CA, TD, NHDetector biasing12.51 - detector bias and leakage currents
- detector 3 has no current
                                        
 bias30Oct.png30Octbias2.pnghvsketch.pdf 
  639   Wed Jun 5 08:34:47 2024 JB. AM, MP, MYDetector bias testsWe are trying to bias each system on its
own and in sequence biasing each other detector
system to see the interdependence.
 14x 
  11   Thu Dec 6 15:31:40 2018 TD, CA, NHDecember 6th 201815.32 1.8.W spectra for aida01, aida09, aida10,
aida11, aida12 (attachments 1, 2, 3)
      2 and 3 expanded in Y and X direction
 11x 
  104   Fri Dec 6 20:34:56 2019 CA, DK, NHDec 6 Night Shift21.35 AIDA DAQ currently running, TapeService
on, not writing to storage
 15x 
  103   Thu Dec 5 22:00:11 2019 CA, DK, NHDec 5 Night Shift15:30
  TD found the merger was running at ~43
Mb/s
 30x 
  79   Fri Nov 1 09:30:17 2019 NHDatabase error stopping run?Strange error about Database options appearing
during run stop.
Does not seem to affect stopping/starting/data?
 ErrorStopDatabase.png 
  68   Wed Oct 30 08:06:49 2019 CA, TD, NHDSSSD stackRibbon cables fitted with kapton PCB couplers
-> 3 isolated + 1 non-isolated for each cable
length/DSSSD
 6x 
  535   Wed Mar 13 13:02:19 2024 JB, NH, HA, MADSSD 1 biasing testsDismounted Snout and biased DSSSD1 channels

leftmost waifer working

middle waifer reaches 90V then
 20240313_142551.jpg 
  382   Mon Oct 18 13:03:23 2021 OHDHCPd.conf backup   dhcpd.conf 
  617   Sun Apr 28 15:49:58 2024 TDDAQ restart short(er) cut
16.45 aida04 stopped producing data
  
  398   Wed Mar 2 09:08:44 2022 OHDAQ Status 2nd March 2022DAQ was found yesterday with none of the FEEs
reporting any good events on any FEE - attachment
1
 220302_1002_goodevents.png220302_1002_white_rabbit.png220302_1003_merger.png220302_1003_merger_data_buffers.png220302_1004_merger_merge_time_errors.png 
  399   Wed Mar 2 10:05:13 2022 OHDAQ Status 2nd March 2022> DAQ was found yesterday with none of the
FEEs reporting any good events on any FEE
- attachment 1
  
  631   Thu May 9 09:08:26 2024 TDCurrent NewMerger install - aida-gsi[npg@aidas-gsi MIDAS]$ ls -l
total 524
drwxrwxr-x.  2 npg npg    156 Mar 17  2021
  
  220   Wed Apr 14 12:14:47 2021 PJCSCorrections and changes14/4/21 @12:00 UK time

Corrected the failure of FADC re-calibration
All modules. The problem was a missing >
  
ELOG V3.1.4-unknown