ID |
Date |
Author |
Subject |
Text |
 |
389
|
Tue Oct 26 16:08:46 2021 |
NH | FEE and Adaptor board groundings | > During investigations into the noise today
by NH and OH a couple of findings were made
on the grounding of the FEEs and Adaptor |
|
29
|
Thu Mar 21 14:10:10 2019 |
NH | FEE Temperatures | All 12 FEEs powered up, and temperatures
are OK.
Passed ASIC checks and system wide |
|
275
|
Sat Apr 24 05:17:51 2021 |
ML | End of beam | Beam has now stopped (end of expriment)
and background measurements starts. |
|
156
|
Mon Mar 16 07:25:24 2020 |
NH | End of Experiment | 08:25 Beam Stopped, end of S480
Tape Server stopped at R12_2097
Started again in no storage mode |
|
34
|
Fri Mar 22 15:44:20 2019 |
NH | End of 22.03.2019 | End of the day - Detector unbiased and
FEE64s turned off for the weekend as they
won't be monitored. |
|
541
|
Tue Mar 19 10:17:30 2024 |
NH | Dry Run 2024 - 19th March 24 | AIDA has 8 FEEs and 1 DSSSD
Aida08 (HDMI#12) had no WR again, I moved |
    |
69
|
Wed Oct 30 11:51:08 2019 |
CA, TD, NH | Detector biasing | 12.51 - detector bias and leakage currents
- detector 3 has no current
|
  |
639
|
Wed Jun 5 08:34:47 2024 |
JB. AM, MP, MY | Detector bias tests | We are trying to bias each system on its
own and in sequence biasing each other detector
system to see the interdependence. |
14x |
11
|
Thu Dec 6 15:31:40 2018 |
TD, CA, NH | December 6th 2018 | 15.32 1.8.W spectra for aida01, aida09, aida10,
aida11, aida12 (attachments 1, 2, 3)
2 and 3 expanded in Y and X direction |
11x |
104
|
Fri Dec 6 20:34:56 2019 |
CA, DK, NH | Dec 6 Night Shift | 21.35 AIDA DAQ currently running, TapeService
on, not writing to storage
|
15x |
103
|
Thu Dec 5 22:00:11 2019 |
CA, DK, NH | Dec 5 Night Shift | 15:30
TD found the merger was running at ~43
Mb/s
|
30x |
79
|
Fri Nov 1 09:30:17 2019 |
NH | Database error stopping run? | Strange error about Database options appearing
during run stop.
Does not seem to affect stopping/starting/data? |
|
68
|
Wed Oct 30 08:06:49 2019 |
CA, TD, NH | DSSSD stack | Ribbon cables fitted with kapton PCB couplers
-> 3 isolated + 1 non-isolated for each cable
length/DSSSD
|
6x |
535
|
Wed Mar 13 13:02:19 2024 |
JB, NH, HA, MA | DSSD 1 biasing tests | Dismounted Snout and biased DSSSD1 channels
leftmost waifer working
middle waifer reaches 90V then |
|
382
|
Mon Oct 18 13:03:23 2021 |
OH | DHCPd.conf backup | |
|
617
|
Sun Apr 28 15:49:58 2024 |
TD | DAQ restart short(er) cut |
16.45 aida04 stopped producing data
|
|
398
|
Wed Mar 2 09:08:44 2022 |
OH | DAQ Status 2nd March 2022 | DAQ was found yesterday with none of the FEEs
reporting any good events on any FEE - attachment
1
|
    |
399
|
Wed Mar 2 10:05:13 2022 |
OH | DAQ Status 2nd March 2022 | > DAQ was found yesterday with none of the
FEEs reporting any good events on any FEE
- attachment 1
|
|
631
|
Thu May 9 09:08:26 2024 |
TD | Current NewMerger install - aida-gsi | [npg@aidas-gsi MIDAS]$ ls -l
total 524
drwxrwxr-x. 2 npg npg 156 Mar 17 2021 |
|
220
|
Wed Apr 14 12:14:47 2021 |
PJCS | Corrections and changes | 14/4/21 @12:00 UK time
Corrected the failure of FADC re-calibration
All modules. The problem was a missing > |
|